Seeking the position as electrical engineer to work in a challenging and energetic environment where I can contribute towards the growth of the company while continuous development of my own skills and abilities.
Overview
2
2
Certifications
Work History
Site Electrical Engineer
Metito Overseas Qatar
- Current
Preparation of method statements and in compliance with the comments
Review the shop drawings and prepare BOQ as per the site conditions
Responsible for all electrical construction works on site as per approved drawings
Maintaining daily/weekly installation Record, Monitoring for day-to-day progress and quality of workmanship to achieve the milestone
Installation of MCC, PLC panels, cabling &termination works
Installation of street poles, flood lights, lightning and earthing system protection works
Preparation of red line mark-up drawings as per the site modifications (as built drawings)
Installation of small power for buildings (lights, sockets, switches, and isolators), instrument JBS, Power & Control JBs at field
Follow ups for power, control
Instrument cables, power and control panels, small power lighting and lightning and earthing materials for the site
Installation of instruments as per approved hook-up Drawings
Installation of UPS panel, battery banks, capacitor banks and Harmonic filter
Supervising the installation of cable trays/ladder indoor/outdoor and inside the trenches/cable gallery as per shop drawings and site requirements (SS, GRP &HDG cable trays) Coordinate with QA/QC for inspections and necessary rectification work as RFI per comments
Liaise with the site construction team/ managers and assist as requested
Arranging the work permits as required site conditions
Coordination with main contractor to expedite the work progress
Attending weekly/monthly progress meeting with main contractor/clients
Ensure all worksites are compliant with Company policies, client requirement and Quality standards.
Site Electrical Engineer
Netracon Technologies Pakistan
Site supervision of installation of Towers and stringing works
Installation of dead-end towers
Coordinate with consultant for the inspections
Manage the manpower and follow-up for the materials deliveries
Coordinate with civil team for the clearance and road access
Prepare the daily/weekly reports to maintain the site progress
Arranging works permits prior to start the site works
Coordinate with client and locals to solve the right way issues
Coordinate with other departments to resolve the hurdles and speed up the progress.
Trainee Engineer
Bestway Cement Limited, Pakistan
Trainee Engineer
Heavy Electrical Complex, Pakistan
Education
Bachelor of Science - Electrical Engineering
University of Engineering And Techanology Taxila
Paksitan
04.2001 -
Profile Overview
A graduate Electrical Engineer with 5+ years of job experience in the field of E&I construction supervision, execution, and Installations of Electromechanical projects such as Wastewater Treatment Plants, Pumping Stations, Chlorination systems for water treatment plants, Overhead Power Transmission Lines HV (AC/DC), Operation and maintenance of Cement Plants and Transformer manufacturing.
Key Skills Summary
Understanding of waste-water treatment plants, RPS pumping stations, gas chlorination systems and ultra filtration systems for water treatment.
Monitoring of team’s performance (KPIs) and necessary actions to enhance the productivity.
Preparing of method statements, drawings review and BOQ generation as per the site requirements.
Duct banks and underground, cable trays and Overhead (OH) cable routings.
Installation of MCC, Control, SCADA, and Power Distribution (PD) Panels.
Grounding grids, lightning protection, and Cable tray installation.
HV(AC/DC), MV and LV cables pulling, glanding and terminations.
Small power lighting and streetlights.
Good understanding of Single line diagrams (SLD), interconnection drawings, cable routing Drawing, Process Flow Diagrams (PFD), Piping and Instrumentation diagrams(P&ID) and instrument Hook-Up drawings.
Good knowledge of primary instruments installation and calibration procedures.
Good understanding of the valves used in STP and pumping stations. (Motorized, pneumatic and manual valves.
Understanding of electrical different equipment such as UPS, batteries, VFD, soft stater, capacitor banks, Harmonic filters, PLCs.
Preparation of red-line markups as per the site modifications.
Read and understand technical documents.
Gather & report necessary information from technical documentation to build equipment hierarchy breakdown.
Knowledge of regulatory requirements.
Leadership and analytical skills along with the ability to motivate people.
Communication expertise, written and oral.
Implementation of Health and Safety Environmental (HSE) procedures.
Co-ordination with teams such as mechanical, civil, planning, finance, and procurement.
Co-ordination with main contractor and consultant for site inspection to get clear invoices
Projects
Design and build Sewage Treatment Plant - new naval base project, Qatar. Afjat Muaither RPS & Associated pipelines Gas Chlorination System, Qatar. Umalhoul (QEZ- 3) economic zone potable water reservoir pumping station, Qatar. Design and construction of 500KV HVAC transmission line, Faisalabad, Pakistan. Rehabilitation of 132KV transmission line, Chitral, Pakistan. Construction of 500KV HVDC transmission line (Casa-1000)