Summary
Overview
Work History
Skills
Timeline
Generic

Atlas Power

Breckenridge,MI

Summary

Proven expertise in DC Power Installations and Site Maintenance, honed across roles at Alpine Power Systems and Peak Power Services, including AT&T, US Cellular, and Verizon projects. Demonstrates exceptional problem-solving abilities and a commitment to enhancing operational efficiency. Skilled in Fiber Installation and adept at leading DAS Builds, achieving a significant improvement in site performance and reliability.

Overview

9
9
years of professional experience

Work History

AT&T

Alpine Power Systems
10.2020 - 03.2025
  • Indoor and outdoor DC Power Plant Installations. Battery upgrades, routers, raycaps, purcell upgrades, cabinet decommissioning, cabling and fiber installation, rack installation, platform leveling, and alarming.

US Cellular

Peak Power Services
11.2018 - 10.2020
  • Traveled throughout the East Coast installing DC power plants and batteries. Microwave hot swaps, raycaps, fiber installation and cabling, battery backups, cabinet decommissioning.

Verizon

Peak Power Services
05.2016 - 11.2018
  • Power Plant and battery install, plus AC to DC conversion. Installed raycaps. Upgrades to CDMA cabinets. AC subpanels installed from main power. DAS builds. Installed cable and fiber racks. SES lock project. Battery upgrades.

Skills

    Indoor and Outdoor DC Power Plant:

    DC Power Installations

    Battery Backup Systems

    Battery Installation

    Communication Equipment Installation

    Site Maintenance indoor and outdoor

    Decommissioning and Removal of equipment

    Site Upgrades

    Cable Sizing and Installation

    Rack Installation

    Fiber Installation

    Repairs

    Equipment Alarming

    Site Audits on cell sites

    DAS Builds

Timeline

AT&T

Alpine Power Systems
10.2020 - 03.2025

US Cellular

Peak Power Services
11.2018 - 10.2020

Verizon

Peak Power Services
05.2016 - 11.2018
Atlas Power