Summary
Overview
Work History
Education
Skills
Timeline
Generic

Aulbrie Frazier

Phoenix,AZ

Summary

For the past 5 months I've been working hard to learn my position and the whole production line. I've gotten efficient at most of it in a short amount of time.

Overview

1
1
year of professional experience

Work History

Electrical Production line Associate

LG arizona
11.2025 - 06.2026
  • Works on Energy Storage Systems (ESS). Such as battery packs
  • BPU installation (Connect the Battery Packing Unit into the storage system) Torque screws into the storage systems.
  • Pack Mounting (Drill the individual battery packs into the storage systems)
  • Branch Pipe mounting (Screwing/connecting the Branch pipe onto the Battery packs)
  • Leak test (Checks for leaks within the storage systems)
  • Coolant (Injects coolant into the storage systems/battery packs)
  • EOL 1 (Prechecks the storage system for Electrical deficiencies)
  • EOL 2 (Inspects the storage system with a hiipot tester and inspection cables. Charges battery packs as well)

Education

undefined

Otero Junior college

Skills

  • Communication skills
  • English
  • Warehouse experience
  • Forklift
  • Handy tools

Timeline

Electrical Production line Associate

LG arizona
11.2025 - 06.2026

undefined

Otero Junior college
Aulbrie Frazier