Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Austin Chaffin

Godley

Summary

Dedicated professional with proven expertise in heavy machinery operation and a strong ability to adapt, demonstrated during tenures at McVay Drilling and MC Concrete Pumping. Excelled in maintaining high safety standards and boosting productivity through critical thinking and teamwork. Achieved significant efficiency improvements, showcasing exceptional problem-solving abilities and professionalism.

Overview

4
4
years of professional experience

Work History

Floorhand

McVay Drilling
08.2024 - 02.2025
  • Moved or relocated materials and equipment required for drilling tool assembly to and throughout work site.
  • Carried out general manual labor activities to aid site productivity.
  • Assisted in rig-up and rig-down procedures, ensuring timely project completion.
  • Maintained clean, organized, hazard-free work areas for optimized site safety.
  • Executed daily operations quickly and accurately, achieving productivity targets.
  • Followed strict quality control processes and procedures to meet high standards.

Laborer

MC Concrete Pumping
05.2021 - 04.2024
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Demolished and repaired old concrete surfaces.
  • Set wood and other forming materials to prepare for concrete pours.
  • Participated in concrete pouring and finishing, expertly managing application of sealers and curing compounds.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Operated heavy machinery such as mixers, pumps, and power tools to expedite the concrete pouring process.

Education

High School Diploma -

Godley Public School
Godley, TX
05-2021

Skills

  • Teamwork and flexibility
  • Repairs and maintenance
  • Critical thinking
  • Ability to adapt
  • Heavy machinery operation
  • Time management
  • Following directions
  • Problem-solving abilities
  • Professionalism

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Floorhand

McVay Drilling
08.2024 - 02.2025

Laborer

MC Concrete Pumping
05.2021 - 04.2024

High School Diploma -

Godley Public School
Austin Chaffin