Highly talented Engineering Technician with an in-depth knowledge of installation, maintenance, testing, troubleshooting, repair, and qualification of electrical and electronic components and subsystems.
Overview
14
14
years of professional experience
Work History
Engineering Technician
Chugach
02.2019 - Current
Performed work according to project schedules and high quality standards.
Implemented schematics, diagrams, and written, and verbal descriptions to effectively solve engineering project issues.
Completed projects by effectively applying engineering, technical, and maintenance procedures.
Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
Mitigated potential project risks by proactively identifying and addressing areas of concern before they developed into significant issues.
Streamlined workflow within the team through effective communication and collaboration with engineers, technicians, and management.
Engineering Tech 1
GLOTECH
01.2018 - 01.2019
Worked independently in fast-paced environment while meeting productivity and quality expectations.
Measured dimensions of finished pieces for conformance to specifications.
Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
Loaded, unloaded, and moved material to and from storage and production areas.
Operated power equipment to move materials and promote job efficiency.
Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
Gathered and disposed of worksite debris to remove safety hazards.
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Participated in continuous learning initiatives to enhance professional development within the industry, applying new techniques when necessary for optimal results on job sites.
Line cook
Terrapin
06.2014 - 12.2018
Manage daily restaurant operations, focusing on seamless service delivery and cutstomer satisfaction.
Analyze operational issues and develop plans of action to improve performances, services, and safety.
Streamline workflow procedures for over 40 staff members and minimize labor costs through effective scheduling an delegation.
Train staff to deliver high-level customer service, resulting in a 20% increase in sales.
Optimize inventory by forecasting food, liquor, wine, and other beverage consumption to determine ordering requirements.
Crew Leader
Mike Taylor’s Siding Company
12.2013 - 06.2014
Completed siding installs for customers with little supervision.
Kept all apointments on time and completed jobs in a timely manner.
Conducted site surveys prior to installation an took measurements.
Prepped exterior for siding installations including any needed wood repairs.
Used drills, measurement tools, power tools, air tools, saws an other tools needed for installation.
Crew Member
M&W Fences and Decks
06.2010 - 12.2012
Installed wire, wood and vinyl fences for various sized yards and areas for both residential and commercial customers.
Prepared sites and yards before installing fences by removing debris and rocks.
Loaded trucks with fencing materials prior to each shift and unloaded all items upon arrival at job sites.