Dedicated construction professional with proven problem-solving skills and expertise in heavy equipment operation. At CB&A Project Management Services, I enhanced project efficiency and client satisfaction through high-quality workmanship and effective teamwork. Committed to maintaining safety standards and optimizing material usage, I consistently delivered projects on time while fostering a positive work environment.
Overview
8
8
years of professional experience
Work History
Construction Worker
CB&A Project Management Services
06.2024 - Current
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Maintained clean and organized job sites, contributing to a safe working environment for all employees.
Loaded, unloaded, and moved material to and from storage and production areas.
Worked independently in fast-paced environment while meeting productivity and quality expectations.
Gathered and disposed of worksite debris to remove safety hazards.
Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
Assisted with basic carpentry work such as installing wooden floors and crown molding.
Operated power equipment to move materials and promote job efficiency.
Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
Maintained clean, organized worksites to promote a safe working environment and minimize hazards.
Millwright
Local 1192
10.2023 - Current
Construction Worker
Phillips Construction
05.2017 - 10.2023
Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
Assisted with successful, time-sensitive renovations of various structures.
Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
Education
High School Diploma -
Chilton County High School
Clanton, AL
05-2017
Skills
Problem-solving
Heavy lifting
Construction
Attention to detail
Team collaboration
Power tool operation
Worksite safety
Painting and finishing
Equipment operation
Basic carpentry
Truck loading
Framing
Flooring installation
Concrete finishing
Carpentry
Site preparation
Demolition experience
Drywall hanging
Equipment maintenance
Framing construction
Heavy equipment operation
Window installation
Insulation application
Excavation techniques
Welding proficiency
Drainage systems
HVAC systems
Construction safety
Accomplishments
Collaborated with team of [Number] in the development of [Project name].
Piping and Layout Designer at EXP, Oil, Gas and Chemicals, Project Management - Project ServicesPiping and Layout Designer at EXP, Oil, Gas and Chemicals, Project Management - Project Services
Process Operations Support at RELIANCE PROJECT & PROPERTY MANAGEMENT SERVICES LIMITEDProcess Operations Support at RELIANCE PROJECT & PROPERTY MANAGEMENT SERVICES LIMITED