Summary
Overview
Work History
Skills
Timeline
Generic

Axel Castillo Ortiz

Albuquerque

Summary

Excel in teamwork, problem-solving, and safety compliance, ensuring smooth operations on site. Bring focused approach to meet project timelines with quality workmanship.

Overview

11
11
years of professional experience

Work History

Steel Erector

Montes construction
Albuquerque
07.2019 - Current
  • Installed structural steel components according to project specifications and safety guidelines.
  • Interpreted blueprints and technical drawings to determine placement of steel elements.
  • Collaborated with project managers to ensure timely completion of construction milestones.
  • Operated cranes and rigging equipment for safe lifting and positioning of steel beams.
  • Maintained tools and equipment to ensure optimal functionality during construction projects.
  • Assisted in rigging operations when necessary to move large pieces into place.
  • Attached wall panels to support systems with screws or bolts as needed.
  • Cleaned job sites at the end of each day to maintain a safe environment.
  • Performed layout and installation of steel structures, including beams, columns, stairways and catwalks.
  • Repaired damaged parts during construction or renovation projects.
  • Connected columns, beams and girders using bolts and shear connections.
  • Operated forklifts or boom lifts when necessary for reaching elevated areas.

Cook Manager

Filiberto’s
Albuquerque
02.2014 - 07.2019
  • Supervised kitchen staff to ensure smooth daily operations.
  • Trained new cooks on food preparation and safety standards.
  • Managed inventory levels and ordered supplies as needed.
  • Maintained accurate inventory of all food items; ordered supplies as needed.
  • Directed and supervised kitchen staff in the preparation, cooking, and presentation of food.
  • Assessed performance of staff members; provided feedback and guidance when necessary.

Skills

  • Structural steel installation
  • Rigging equipment operation
  • Team collaboration
  • Problem solving
  • Attention to detail
  • Effective communication
  • Time management
  • Job site cleanliness
  • Precision measuring
  • Fall protection
  • Construction safety
  • Safety measures

Timeline

Steel Erector

Montes construction
07.2019 - Current

Cook Manager

Filiberto’s
02.2014 - 07.2019
Axel Castillo Ortiz