Senior Electrical Engineer with over 13 years' experience in the electrical engineering industry. Superior problem-solving and time management abilities. Adept at diagnosing malfunctioning systems and identifying the cause of breakdown.
Skilled hands on experience of testing and commissioning of 415/230Vac LV; 11Kv /33Kv /66Kv/220Kv transmission equipments such transformer ( Oil type/Dry type ) , switching devices such (SF6, VCB, ACB ), underground cable fault detection.
Complete site survey with designing of temporary power plants inclusive of power generation by diesel/HFO/GAS engines with LV/MV distribution compliance with synchroniszation and load shedding algorithms.
Access in programming of PLC , controllers suited with OEM supplied eg:- S700/DEEP SEA ELECTRONIC/COMAP/SOCOMEC/WOODWARD/AMF CONTROLLER/VFD (ABB/SIEMENS).
Project management team lead for completion of EPC projects including Ghant charts preparation in primavera 6, compliation of project specifications, Execution, progress meeting with billing on monthly basis , testing & commissioning activities and final DLP completion certificate.
Organizational/Project documentation preparation of O&M manuals , parts manual, project flow chart, not limited with biling of monthly invoice, cash flow statement, SOA of various contractor on major scale projects.
Overview
13
13
years of professional experience
1
1
Certification
Work History
Sr. Electrical Engineer
Khonaysser Motors
03.2016 - Current
Coordinated design, tests, and build activities between cross-functional teams.
Planned all project resources and budgets.
Reviewed specifications, drawings and project manuals.
Applied appropriate engineering methods to project discipline standards.
Collaborated successfully with cross-functional development teams to design and manufacture accordingly to specifications.
Implemented and approved design control procedures for electrical development in accordance with regulatory Kahramaa guidelines.
Determined most effective approaches to new projects by reading and analyzing blueprints, drawings and sketches.
Monitored manufacturing operations of electrical devices/panels such as LV/ MDB / ATS PANEL for compliance with safety protocols.
Created electrical schematics using AutoCAD Electrical Toolset.
Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
Identified specific cables, connectors, fuses, circuit breakers and other electrical devices required for installation of monitoring systems and weapons detection systems.
Mentored junior engineers and new hires to better improve competency and efficiency of all staff.
Performed in-depth electrical acceptance testing of completed hardware.
Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
Electrical Engineer
JUBAILI BROS WLL
06.2012 - 01.2016
Performed maintenance procedures and repairs on existing electrical products and systems such testing of STANDBY/PRIME RATED GENERATORS CT/VT/ ACB /VCB installed within project scope.
Provided on-site engineering and technical services during installation and fielding processes.
Prepared budgets by estimating materials, labor and construction costs.
Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
Communicated with engineers and customers to discuss potential and existing engineering projects.
Conducted field surveys and studied load systems and SLD to identify and correct power system problems.
Reviewed drawings and technical diagrams of proposed circuits for viability and compliance. for engine ECM and controllers , PLC , VFD.
Supervised construction and pre-commissioning of electrical rooms, substations and service buildings for temporary power plants.
Administered both energized and de-energized testing on multi-design change packages including LV/MV system.
Used IEEE/ISO/NFPA standards to calculate current loads and short circuit currents, determine the DL, CL , %VD , Cable sizing , genset performance.
Spearheaded tendering and negotiation process for critical products and services to reduce costs and allow early contractor involvement.
Implemented cutting-edge processes and safety practices to reduce electrical construction hazards.
Developed electrical products by studying customer requirements and researching and testing manufacturing and assembly methods and materials.
MEP Engineer cum Consultant
POWER TECH SERVICES LLC, DESIGANTION
12.2010 - 02.2012
Supervision of Medium/Low current Electrical works and site requirement preparation
Preparing maintenance schedule for MEP related works and allocation of manpower management
Worked flexible hours; night, weekend, and holiday shifts.
Used coordination and planning skills to achieve results according to schedule.
Site coordination and participating in the entire client related technical meetings as a consultant and a contractor
Preparation of specifications for MEP works
Trouble shouting of PLC based control panels used for Irrigation pumping stations
Designing and Installation of Lighting systems for Landscape including of load distribution calculations
Installation, commissioning and trouble shouting of solar operated panels,
Irrigation controllers, etc
HVAC - FCU, AHU and Split Installation
MEP Modifications and rectifications works
Fabrication and Servicing of MDB,SMDB and Other DB panels.
Customer Support/Application Engineer
APOLLO POWER SYSTEMS (P) LTD, DESIGANTION
05.2009 - 11.2010
Followed up with customers after completed sales to assess satisfaction and resolve technical or service concerns.
Showcased product features to customers and discussed technical details to overcome objections and lock in sales.
Worked independently with minimal supervision.
Participated in testing and commissioning activities.
Education
BACHELOR OF ENGINEERING (B.E - ELECTRICAL AND ELECTRONICS
Have played as project coordinator for major projects from concept , design, pre-installation and execution with warranty and maintenance period as per contractual terms and conditions
Managed a cross-functional team as project coordinator for delivering standby Mobile Generators in 35 Nos. with advanced design for M/s. QGEW.Co. a project whooping with cost of Qar:- 18 Million.
Managing a project with complete MEP installation ,Commissioning including ATS/MDB/STANDBY GENSET/LV- PACKET SUBSTATION for ARAB Poultry farm with project cost of Qar:- 3 Million.
Supply , installation , testing and commissioning of Standby genset with rating of KMGP1900 X 9 no. for M/s. Baldana Dairy Farm a project whooping with cost of Qar:- 6 Million.
Remote supervision of complete diesel power plant project for M/s. Fouta Cement industries- Liberia with cost whooping of USD:- 1.3 Million.
Involving in routine Genset , ATS , Control panel , Synchro panel assembling and manufacturing activities with annual production of 500-600 gensets / year in Khonaysser Group.
Have played as a team leader in Successful completion of major temporary power plants for various projects in middle east and west african countries.
Have played as project engineer for testing and commissioning of 2200KVA genset for Q-RAIL depot station.
Additional Information
Driving License : , Valid UAE and QATAR driving license.
Certification
Licensed MMUP/UPDA electrical engineer
Timeline
Sr. Electrical Engineer
Khonaysser Motors
03.2016 - Current
Electrical Engineer
JUBAILI BROS WLL
06.2012 - 01.2016
MEP Engineer cum Consultant
POWER TECH SERVICES LLC, DESIGANTION
12.2010 - 02.2012
Customer Support/Application Engineer
APOLLO POWER SYSTEMS (P) LTD, DESIGANTION
05.2009 - 11.2010
BACHELOR OF ENGINEERING (B.E - ELECTRICAL AND ELECTRONICS