Summary

Dedicated Boilermaker with strong background in installation, inspection, and maintenance of boiler systems. Committed to upholding safety protocols and enhancing technical skills to drive operational efficiency. Proven capability in disassembling and reassembling complex components, ensuring reliability and performance of systems.

Overview

2026
2026
years of professional experience

Work History

Boilermaker

Repco
  • Installed and uninstalled new valves in various systems.
  • Removed bundles and components from heat exchangers.
  • Progressed from laborer to boilermaker and quality control (QC) role.
  • Ensured compliance with safety regulations and quality standards.
  • Conducted inspections to improve work quality and efficiency.

Quality Control Inspector

Universal Plant Services
Deer Park, Texas
09.2014 - 03.2025
  • Communicated with production team members about quality issues.
  • Inspected quality of products, taking note of functionality, appearance and other specifications.
  • Inspected incoming and outgoing materials for accuracy and quality.
  • Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems.
  • Performed visual inspections and non-destructive tests where appropriate.
  • Maintained compliance with industry regulations through meticulous record-keeping and documentation of inspection results.
  • Evaluated components and final products against quality standards and manufacturing specifications.

Boilermaker

Joint Venture Piping
Corpus Christi, TX
01.2005 - 03.2013

Executed removal of all valves and installation of new valves on exchangers.

Bundled components for thorough cleaning before reinstallation.

Performed inspections on all components prior to reinstallation.

Solid Control Tech

Total Screen Solution
Corpus Christi, Texas
02.2010 - 2012
  • Developed troubleshooting skills for rapid resolution of issues that arose during normal operations or when transitioning between different phases of a project.
  • Trained new Solids Control Technicians on company procedures, equipment operation, maintenance protocols, and safety guidelines to guarantee operational consistency across teams.
  • Managed inventory of consumables and spare parts to ensure continuous operation without costly delays due to lack of supplies.
  • Collaborated with suppliers to source high-quality materials at competitive prices while ensuring timely delivery schedules were met consistently throughout any given project''s duration.
  • Reduced drilling waste volume by effectively separating and disposing of drilled solids in compliance with environmental regulations.
  • Consistently met project deadlines by prioritizing tasks effectively, allocating resources efficiently, and adapting quickly to changing conditions on the job site.
  • Maintained a safe working environment by adhering to company policies, industry standards, and regulatory requirements pertaining to solids control operations.
  • Prevented environmental incidents by adhering to strict disposal guidelines for all drilling waste products, including solids, liquids, and sludge.
  • Ensured smooth operations on the rig site by collaborating with the drilling team, including the mud engineer and rig supervisor.

Education

No Degree -

Calallen
Corpus Christi, Texas

Skills

  • Boiler maintenance and inspection
  • Component assembly and gasket installation
  • Safety compliance and quality control
  • Technical training and problem resolution
  • Team collaboration and process optimization

Timeline

Quality Control Inspector

Universal Plant Services
09.2014 - 03.2025

Solid Control Tech

Total Screen Solution
02.2010 - 2012

Boilermaker

Joint Venture Piping
01.2005 - 03.2013

Boilermaker

Repco

No Degree -

Calallen