T. Beryl Hubbard

T. Beryl Hubbard

Construction Quality Manager
Devine,TX

Summary

Results-driven Project Quality Manager with a track record of ensuring projects are delivered to the highest quality standards through effective management and team collaboration. Excel in streamlining processes to enhance productivity and efficiency, completing tasks within deadlines without compromising quality. Specialize in risk management, continuous improvement strategies, and compliance monitoring. Skilled in communication, leadership, and problem-solving, enabling successful project execution and stakeholder satisfaction.

Overview

35
35
years of professional experience
1
1

Certification active

Work History

Project Quality Manager

Black & Veitch/GRDA
Chouteau, OK
11.2024 - Current
  • Company Overview: Unit 4 is a new fast-start, 426-megawatt advanced J-class Mitsubishi Power 1x0 combustion turbine simple-cycle project. Total project cost $410 million.
  • I support the (EpCM) GRDA/B&V Quality and Construction Management Team with oversite of the subcontractors Project Specific Quality Plan, Project Specific SOPs, and ITPs for the project Unit #4 Simple Cycle Power Generation Station.
  • We performed oversite of the project subcontractor’s quality programs implementation, tracking and reporting to the project management team and client.
  • My management functions involved administrative and technical support of the quality program.
  • I conducted internal audits of the quality documentation and overall quality programs’ effectiveness ensuring that documentation complies with the project contract and turnover procedures.
  • I provide support to construction by attending work package planning meetings and through the resolution of technical-related issues.
  • I also assisted with the interpretation and application of various NDE and welding codes including, but not limited to, ASME BPVC Sect. I, Sect VIII Div. I & II. ASME Section IX, B31.1, B31.3, AWS D1.1, and Design Specifications.
  • Unit 4 is a new fast-start, 426-megawatt advanced J-class Mitsubishi Power 1x0 combustion turbine simple-cycle project. Total project cost $410 million.

Contract / Project Quality Manager

ERSG – EXEL/Bolt Company
Shakopee, MN
08.2024 - 11.2024
  • Management and implementation of the project quality program.
  • I support the quality team and construction by reviewing the ASME Quality Manual, Project Specific Quality Plan, Project Specific SOPs, and Quality ITPs for the project.
  • We performed oversite of the project subcontractor’s quality programs implementation, tracking and reporting to the project management team and client.
  • My management functions involved administrative and technical support of the quality program.
  • I conducted internal audits of the quality documentation and overall quality programs’ effectiveness ensuring that documentation complies with the project contract and turnover procedures.
  • I provide support to construction by attending work package planning meetings and through the resolution of technical-related issues.
  • I also assisted with the interpretation and application of various NDE and welding codes including, but not limited to, ASME BPVC Sect. I, Sect VIII Div. I & II. ASME Section IX, B31.1, B31.3, AWS D1.1, and Design Specifications.

Contract / Field QC Manager

System One – PLNG/KZJV
Plaquemine Parish, LA
06.2024 - 08.2024
  • Company Overview: Venture Global, Zachry Group and the engineering firm KBR Inc. joint venture as KZJV to build the first phase of the Plaquemines LNG export plant. A $4.5 billion project includes the development of a 632-acre site, construction of two gas turbine power plants, a terminal that can annually produce up to 20 million tons, and two 42-inch diameter pipelines.
  • I assist the Project Quality Management Team with implementation and management of the projects NCR and RCA reporting programs.
  • We utilized KBR/Zachry corporate quality programs for tracking and reporting to the project management team KZJV and Venture Global.
  • Management functions involve the administrative and technical support of the quality clerks and inspectors, coordinating the groups’ daily activities, and providing support to Project/Construction management through the coordinating and performance of inspections, verifications, surveillance, and the resolution of technical related issues.
  • I fill in for Area PQCM’s when they were off-site for their scheduled rotation from the project.
  • I also assist the Project Quality Manager with “HOT” issues that could impact the project schedule and project quality.
  • Venture Global, Zachry Group and the engineering firm KBR Inc. joint venture as KZJV to build the first phase of the Plaquemines LNG export plant. A $4.5 billion project includes the development of a 632-acre site, construction of two gas turbine power plants, a terminal that can annually produce up to 20 million tons, and two 42-inch diameter pipelines.

Construction Manager – Area Quality Inspector ISBL/OSBL/PTU-FRU

NSB_OMEGA 365 - P66-Rodeo Renewed Diesel
San Francisco Refinery
01.2023 - 05.2024
  • Company Overview: This was a full conversion of the Rodeo Renewable Energy Complex and increased rates to approximately 50,000 BPD (800 million gallons per year) with a total project cost of $850 million, including a key component of sustainable aviation fuel, or SAF.
  • I provided oversite for Structural, Mechanical Piping, and Tank Storage for quality coordination, inspection, and technical input for contractor as a part of the Rodeo Renewed - P66 Major Projects Team.
  • I was involved with material, equipment, and work installation activities by the Contractor.
  • I assisted the project with aligning installation activities with pre-turn around contractor work and the P66 Major Projects Team, and the P66 Rodeo Refinery Site Operations.
  • I provide oversite with the project schedule, construction installation, and progress of the crafts quantities with the project.
  • I provide technical support to the constructor when required pertaining to respective Code Requirements, Safety, Quality, and Management of all craft installation activities.
  • I perform surveillance of craft activities to ensure the project quality procedures and project schedules are met.
  • I perform frontline inspections as needed.
  • I review/approve all quality documentation for Schultz, Performance Mechanical, CB&I-Tanks, Apache Internal Coatings of Tanks, and Redwood Coatings for Structural and Mechanical Piping.
  • I report directly to the P66-Construction Manager (Stan Hudson) and Project Manager (Dan Oglesby) of all progress, construction activities, and any safety or quality concerns.
  • I attend all Construction POD’s, Progress, Quantity, Safety, and Quality meetings and always strive to lead from the front, setting the example in promoting a strong safety and quality culture with the construction teams.
  • This was a full conversion of the Rodeo Renewable Energy Complex and increased rates to approximately 50,000 BPD (800 million gallons per year) with a total project cost of $850 million, including a key component of sustainable aviation fuel, or SAF.

Lead Project Coordinator – CatPoly/Lubes Crude Projects

OMEGA 365 Staffing Solutions – P66-Major Projects
West Lake, LA
05.2022 - 12.2022
  • I provide construction oversite, coordination, and technical input for the Cay-Poly and Lubes Crude P66 Major Projects Team for Structural, Mechanical Piping Material, Equipment ensuring work activities are aligned with the pre-turn around and turn around scheduling teams between the constructor, P66 Major Projects Team, and the P66 - Refinery Site Operations.
  • I write, schedule, coordinate, and oversee safe work plans for P66-Site Operations and the constructor to review, add input, implement, and execute all critical work activities to include lead and asbestos sampling, testing, and abatement.
  • I provide oversite with the project schedule, construction installation, and progress of the crafts for the CatPoly and Lubes Crude projects.
  • I hold Pre-Task Briefings (PTB’s) with the contractor construction management team and attend the Pre-Job Planning with the craft teams for all critical work on my projects.
  • I provide technical support to the constructor when required pertaining to structural and mechanical piping craft installation activities.
  • I report directly to the P66-Construction Manager (William Hafer) and Project Quality Manager (Ken Shelton) of all progress, construction activities, and any safety or quality concerns.
  • I attend all construction POD’s, Scheduling, Safety, and Quality Briefings and always strive to lead from the front, setting the example in promoting a strong safety and quality culture with the construction team on site.

Quality Assurance Inspector/Technical Specialist

Strategic Staffing Solutions – TECO Energy
Apollo Beach, FL
01.2022 - 05.2022
  • Company Overview: Installation of 2 - GE 7HA.02 gas combustion turbines, upgrade, & retrofit of the existing steam turbines with new state-of-the-art combined cycle technology capable of producing 1,090 megawatts. Total project cost of $853 million. This will provide a reduction in CO2 emissions up to 3 million tons.
  • I supported the client (TECO) with construction installation oversight of the contractor Kiewit/TIC structural steel, engineered piping supports, monitored and verified the installation of work packages for correct installation per the contract, Codes of Construction, Project Specifications, and the Engineered Design Drawings.
  • I generated Redline Field Sketches for Sargent Lundy Engineering Group.
  • I verified and witnessed client quality inspection points.
  • I identify and disposition any discrepancies through the RFE (responsible field engineer) and Design Engineering.
  • I supported construction teams in technical input and system restoration package walk.
  • I develop client punch lists and report directly to the client daily of all surveillance and construction activities as well as any safety concerns encountered.
  • Installation of 2 - GE 7HA.02 gas combustion turbines, upgrade, & retrofit of the existing steam turbines with new state-of-the-art combined cycle technology capable of producing 1,090 megawatts. Total project cost of $853 million. This will provide a reduction in CO2 emissions up to 3 million tons.

Sr. Project Quality Manager

Casey Industrial, Inc.
Leroy, AL
11.2021 - 12.2021
  • Management and implementation of the project quality program.
  • I support the quality team and construction by reviewing the ASME Quality Manual, Project Specific Quality Plan, Project Specific SOPs, and Quality ITPs for the project.
  • We utilized Casey Industrial’s quality programs for tracking and reporting to the project management team and client.
  • My management functions involved administrative and technical support of the quality document control, quality clerks, and QC Manager.
  • I conducted internal audits of the quality documentation and overall quality programs’ effectiveness ensuring that documentation complies with the project contract and turnover procedures.
  • I provide support to construction by attending work package planning meetings and through the resolution of technical-related issues.
  • I also assisted with the interpretation and application of various NDE and welding codes including, but not limited to, ASME BPVC Sect. I, Sect VIII Div. I & II. ASME Section IX, B31.1, B31.3, AWS D1.1, and Design Specifications.

Project Quality Manager

The Industrial Company
Woodlands, TX
10.2020 - 11.2021
  • Management and implementation of the project quality program.
  • After reviewing the contract, and engineering specifications, I lead the quality assurance quality control team in developing a project-specific Quality Plan by aligning the SOPs with the Contract/Code requirements and developing the craft-specific Inspection & Test Plans (ITPs) for the project.
  • We utilized Kiewit/TICS corporate quality programs for tracking and reporting to the project management team and client.
  • Management functions involve the administrative and technical support of the quality clerks and inspectors, coordinating the groups’ daily activities, and providing support to Project/Construction management through the coordinating and performance of inspections, verifications, surveillance, and the resolution of technical related issues.
  • I also assisted with the interpretation and application of various NDE and welding codes including, but not limited to, ASME BPVC, AWS D1.1, D1.6, ASME Section 9, B31.1, B31.3, and Design Specifications.
  • Ensuring that documentation complies with the project contract, Quality Plan, and Turnover requirements and procedures.
  • Assisted with project quality audits for GCGV LNG in Corpus Christy.
  • Filled in for QC and assisted the PQM at Yellowhammer with quality management, and inspection coordination, and I am currently assigned to the VGCP LNG in Calcasieu Pass, LA.
  • In the position of the 2nd shift Project QC Manager coordinating all inspectors, and inspections, in the field for all crafts to include pre-testing walks, test verifications, system restorations, and mechanical completion walks.
  • I also assist with the Project Quality Manager functions for the 2nd shift during his rotation time off schedule.

Project Quality Manager

Zachry Group, Inc.
Goldsborough, NC
03.2020 - 10.2020
  • Management and implementation of the project quality program.
  • I led the Quality Assurance team in developing Project Specific Quality Plan, Project Specific SOPs, and Quality ITPs for the project.
  • We utilized Zachry's quality programs for tracking and reporting to the project management team and client.
  • Management functions involved administrative and technical support of the quality clerks and inspectors, coordinating the groups’ daily activities, provided support to Construction through the coordinating and performance of inspections, verifications, surveillance, and the resolution of technical-related issues.
  • I also assisted with the interpretation and application of various NDE and welding codes including, but not limited to, ASME BPVC, AWS D1.1, ASME Section 9, B31.1, B31.3, and Design Specifications.
  • Performed internal project quality audits ensuring that documentation complies with the project contract and turnover procedures.

Group Quality Assurance Manager

Zachry Group, Inc.
San Antonio, Corporate Office
01.2019 - 03.2020
  • My primary role is to review the Project Contract, Scope of Work, and Engineering Specifications to develop and maintain the Project Quality Manual and the Site-Specific Quality Plan.
  • As a part of the Quality Assurance Team, I collaborate with the Operations/Construction Depts. and the Quality Control team to develop the Project Specific Quality Plan, Project Specific SOPs, ITPs, ITRs, Checklists, and Forms for the project.
  • I collaborated with quality and construction departments for the continued development and maintenance of the Zachry Corporate Quality Manual and related Standard Operating Procedures.
  • I communicated directly with the Project Managers throughout this process to ensure transparency and that the quality process was successful in their projects.

Project QC Manager

Zachry Group, Inc.
Salisbury, NC
01.2018 - 12.2019
  • I am responsible for the direct support of the Projects Quality Team through the development of the Project Quality Manual, Project-specific Quality Plans, Standard Operating Procedures, Work Instructions, Inspection, and Test Plans, and all the supporting Quality Check Sheets, Checklists, and Forms.
  • I accomplish this through a thorough review of the Project requirements and Contractual Documents, Contracts, Specifications, Codes, Standards, PIPs, etc.
  • I establish clear communications with our Project Managers, Project Quality Managers, and our JV Partners and Owners throughout the Project Quality Plan Development Process.
  • I make every effort to get buy-in from the Project Management Team into the Project Quality Plan during the beginning stages of its development.
  • I continually support the Project Quality Team after they mobilize to the site for any unforeseen issues requiring edits, revisions, or changes to the quality plan as needed throughout the project duration.

Quality Technical Specialist II

Burrow Global-Chevron Phillips Chemical
Baytown, TX
06.2017 - 01.2018
  • I supported P66 Major Projects Team and Construction Team functioning as Construction Superintendent/Lead QC Client Rep in managing a group of Contract QC Rep’s directing the verifying of pre-hydro walk down packages, material identification, component verification, valve alignment, valve trim requirements and correct setup of hydro boundaries and activities as well as witnessed and sign off on hydro test completion for the client.
  • I reviewed welding and NDE activities to ensure they met site procedures and code requirements.
  • I identify and disposition any discrepancies through the RFE (responsible field engineer) and Design Engineering.
  • Supported construction teams in the restoration package walk.
  • Verifying those systems had been installed per engineered P&IDs, ISOs, and Project Installation Procedures.
  • I attended all POD’s, Construction Scheduling/Activity Meetings, and Safety Briefings.
  • I report directly to the P66 Major Projects Construction Manager daily of all surveillance and construction activities as well as any safety concerns encountered.

Construction Technical Services Manager II

Fluor Construction, Inc.
Jenkinsville, SC
05.2016 - 06.2017
  • Supported the welding processes for all Structural Steel and Mechanical Piping Crafts, assisting construction with troubleshooting and providing technical direction involving material identification, component verification, and weldability.
  • Verify that all welding activities were performed to procedure and code requirements.
  • Identify and disposition any discrepancies through RFE (responsible field engineer) and Design Engineering.
  • I support safety during welding activities throughout the site, performing daily surveillances as well as coaching and mentoring activities with welders throughout the welding process.

Construction Technical Services Manager II

WECTEC STAFFING SERVICES - (A Subsidiary Westinghouse Owned Company)
Jenkinsville, SC
01.2016 - 04.2016
  • I worked at VC Summers nuclear power station Units 2 & 3.
  • I supported all aspects of Structural Steel and Mechanical Piping Crafts directly with the field welding processes by assisting construction with troubleshooting and technical direction, material identification, component verification, and weldability.
  • I assigned welding procedures for welding personnel in the field to ensure that all work was per procedures and code requirements, identifying and dispositioning any discrepancies.
  • I supported the non-safety & safety welding activities throughout the site.

Field Welding Engineer

Chicago Bridge & Iron
Jenkinsville, SC
10.2014 - 12.2015
  • I provided support to all aspects of the Structural Steel and Mechanical Piping Crafts directly with the field welding processes by assisting construction with troubleshooting and technical direction, material identification, component verification, and weldability.
  • I assigned welding procedures for the welding personnel in the field to ensure that all work complied with the procedure and code requirements.
  • I identified and dispositioned any discrepancies and supported the welding program for safety & non-safety sitewide.

Lead Field QC

Jacobs Field Services
Kingsport, TN
05.2014 - 10.2014
  • I was responsible for coordinating and performed field inspection activities for civil compaction testing, mapping, and monitoring concrete pours.
  • Received and organized batch tickets, and break test reports, and mapped the pour books for final handover.
  • Monitored/Witnessed all structural bolt testing, installation, and welding of in-process piping activities.
  • I coordinated NDE crews, weld mapping, and verifying welder qualifications.
  • Performed pre and post hydro punch list walks for mechanical completion and walk-downs for turnover.
  • I directly work with Eastman Chemical Company Quality inspectors, engineers, and technologists to ensure that the work met the AWS-D1.1, ASME-B31.1 & B31.3 codes of construction, and Eastman specification requirements.
  • I performed walk-downs for all crafts, developing their respective work remaining / punch list for mechanical completion and client acceptance.

Pipeline Weld Inspector

Doyon Unlimited, LLC.
Point Thomson, North Slope Alaska
02.2014 - 05.2014
  • Responsible for receipt inspections of delivered pipe to include tracking and verifying all double joint numbers and heat numbers.
  • Monitored and verified all welding activities of the pipe gang including weld mapping, recording double joint numbers, hand eat numbers, and ensuring weld quality and adherence to the WPS and project specifications.
  • Performed walk-downs and generated punch list items for the execution team and performed punch list completion verification with the client for the 22-mile pipeline.

Project QA/QC Manager

Sundt Construction, LLC.
Pinedale, Wyoming
11.2013 - 02.2014
  • Coordinated all field inspection activities, NDE, welder qualifications, and weld tracking as well as all supporting civil, concrete, structural, and piping activities in maintenance and new construction settings.

Education

High School Diploma -

Sullivan South High School
Kingsport, TN
05-1990

Skills

  • Quality management
  • Code compliance
  • Inspection planning
  • Audit execution
  • Project documentation
  • Data analysis
  • Construction oversight
  • Compliance reporting
  • Effective communication
  • Problem solving
  • Team leadership

Affiliations

  • Life Style Activities include; Riding motorcycles, working on diesel trucks, hunting, fishing, and hiking.

Accomplishments

  • VICA - Metal Technologies, Competed in high school welding competitions in State placing 2nd my 11th & 12th grade years.
  • Attended Fluor Daniels School of Pipe Welding completing the 6 month training in 3 months.

Certification

Stepping up to supervisor training

Situational leadership training

Fluor Daniels School of Pipe Welding - Certified Combination Pipe Welder

AWS-CWI/CWE API 1104, CERTIFICATION NO. 12071431

AWS D1.1 ENDORSEMENT

ANST-ACCP-VT

ACI LEVEL I

Level II Ultrasonic Training per ASNT-TC1A

Level I & II Machinist Certification

Level II ASNT-LRI Certification

Master trainer certification-NCCER

Certified NCCER Instructor

Certified NCCER Industrial PipeFitter

Certified NCCer industrial welder

Certified NCCER Rigger and Rigging supervisor

References

References available upon request.

Timeline

Project Quality Manager

Black & Veitch/GRDA
11.2024 - Current

Contract / Project Quality Manager

ERSG – EXEL/Bolt Company
08.2024 - 11.2024

Contract / Field QC Manager

System One – PLNG/KZJV
06.2024 - 08.2024

Construction Manager – Area Quality Inspector ISBL/OSBL/PTU-FRU

NSB_OMEGA 365 - P66-Rodeo Renewed Diesel
01.2023 - 05.2024

Lead Project Coordinator – CatPoly/Lubes Crude Projects

OMEGA 365 Staffing Solutions – P66-Major Projects
05.2022 - 12.2022

Quality Assurance Inspector/Technical Specialist

Strategic Staffing Solutions – TECO Energy
01.2022 - 05.2022

Sr. Project Quality Manager

Casey Industrial, Inc.
11.2021 - 12.2021

Project Quality Manager

The Industrial Company
10.2020 - 11.2021

Project Quality Manager

Zachry Group, Inc.
03.2020 - 10.2020

Group Quality Assurance Manager

Zachry Group, Inc.
01.2019 - 03.2020

Project QC Manager

Zachry Group, Inc.
01.2018 - 12.2019

Quality Technical Specialist II

Burrow Global-Chevron Phillips Chemical
06.2017 - 01.2018

Construction Technical Services Manager II

Fluor Construction, Inc.
05.2016 - 06.2017

Construction Technical Services Manager II

WECTEC STAFFING SERVICES - (A Subsidiary Westinghouse Owned Company)
01.2016 - 04.2016

Field Welding Engineer

Chicago Bridge & Iron
10.2014 - 12.2015

Lead Field QC

Jacobs Field Services
05.2014 - 10.2014

Pipeline Weld Inspector

Doyon Unlimited, LLC.
02.2014 - 05.2014

Project QA/QC Manager

Sundt Construction, LLC.
11.2013 - 02.2014

High School Diploma -

Sullivan South High School
T. Beryl HubbardConstruction Quality Manager