Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
Joao De Campos

Joao De Campos

Asheville,NC

Summary

Air Conditioning experience

Overview

26
26
years of professional experience

Work History

Chief Engineer

Crestline Hotels
03.2025 - Current
  • Conducting research on emerging technologies to enhance product performance
  • Collaborating with cross-functional teams to streamline project workflows
  • Participating in training sessions to improve technical knowledge and skills
  • Observing quality control measures to maintain high standards in engineering projects
  • Reduced equipment downtime through proactive preventive maintenance and timely repairs, ensuring smooth operations.
  • Mentored junior engineers, providing guidance on best practices and technical expertise for professional growth.
  • Managed and scheduled equipment and system preventive maintenance programs to verify contractual compliance.
  • Established procedures for corrective and preventive maintenance.
  • Oversaw facility inspections to identify areas of concern or opportunities for improvement in infrastructure management.
  • Attended weekly department head meetings to share information and voice concerns.
  • Managed budgets for engineering projects, making strategic decisions to optimize resources while maintaining quality standards.
  • Performed root cause analyses to diagnose system failures accurately while minimizing downtime during troubleshooting efforts.
  • Led a team of engineers to successfully complete complex projects within budget and schedule constraints.
  • Used Software to prepare weekly reports regarding technical status of facilities.
  • Enhanced productivity through streamlined workflows, process improvements, and efficient resource allocation.
  • Worked closely with vendors and internal sourcing to establish relationships, fostering new opportunities, solutions and cost savings.
  • Conducted routine and ongoing assessments of system operations by performing tests, rounds and analyzing data.
  • Established effective communication channels among team members, fostering collaboration and information sharing.
  • Optimized system performance by implementing innovative engineering solutions and continuous improvement initiatives.
  • Improved safety standards by conducting thorough risk assessments and implementing necessary mitigation measures.
  • Evaluated vendor proposals for equipment purchases, selecting the best options based on cost-benefit analysis and long-term value.
  • Ensured regulatory compliance by staying updated on industry standards and implementing necessary changes to company procedures.
  • Contributed to the development of standard operating procedures, creating consistent guidelines for engineering tasks across the organization.
  • Created detailed reports documenting project findings and recommendations enabling informed decision-making among executive leadership teams.
  • Coordinated with cross-functional teams to ensure seamless integration of new technologies and processes into existing systems.
  • Administered safety plans to train Number employees on meeting and exceeding OSHA safety standards.
  • Collaborated with stakeholders to develop project scopes, objectives, timelines, and deliverables in alignment with business goals.
  • Completed annual capital budgeting, invoice review and approval and weekly work schedules.
  • Optimized performance of facility machinery through calibration and repairs.
  • Developed strategic plans for facility upgrades and expansions, resulting in increased efficiency and capacity.
  • Analyzed business and Type technical requirements to determine system design, potential issues and related cost for each project request.
  • Reviewed engineering designs for accuracy, feasibility, functionality before implementation to ensure success upon execution.
  • Determined necessary steps to bring systems into compliance.
  • Reduced company expenditures and loss by Number% by implementing proactive maintenance procedures.
  • Trained and mentored junior engineers, providing guidance and direction.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
  • Created detailed reports on engineering activities and findings.
  • Assisted in developing cost-effective solutions to engineering problems.
  • Collaborated with other departments to facilitate successful project completion.
  • Developed and implemented procedures to verify compliance with engineering standards.
  • Monitored and evaluated engineering performance to recommend improvements.
  • Implemented automated systems to improve accuracy and efficiency of engineering processes.
  • Analyzed and interpreted customer requirements to develop engineering solutions.
  • Verified construction documentation to meet client requirements and vision.
  • Conducted research to identify and evaluate new technologies and concepts.
  • Analyzed and interpreted data to identify trends and recommend improvements.
  • Developed high-quality engineering designs and plans to meet industry standards.
  • Conducted technical evaluations of engineering designs and test results.
  • Documented and developed engineering procedures and processes.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Assisting with engineering design and development processes to ensure compliance with specifications
  • Learning safety protocols and best practices in equipment operation and maintenance
  • Supporting project teams in drafting technical documentation and reports
  • Utilizing CAD software for creating detailed engineering drawings and models

Maintenance Engineer Supervisor

Grove Park Inn
01.2025 - 03.2025
  • Supervised maintenance team, ensuring adherence to safety protocols and operational standards.
  • Conducted regular inspections of facilities and equipment to identify maintenance needs and ensure reliability.
  • Developed and implemented preventative maintenance schedules, enhancing equipment longevity and operational efficiency.
  • Collaborated with management to establish budgetary guidelines for maintenance operations and resource allocation.

Chief Engineer

Crown Plaza Hotel
02.2000 - 08.2008
  • Assisting with engineering design and development processes to ensure compliance with specifications
  • Learning safety protocols and best practices in equipment operation and maintenance
  • Supporting project teams in drafting technical documentation and reports
  • Utilizing CAD software for creating detailed engineering drawings and models

Education

Bible College - Bible College

Fruitland College
Hendersonville, NC
12.2017

GED - Ged

Continental Academy
Miami, FL
03.2004

Skills

    Chief Engineer Complex

Accomplishments

License Aquatic Facility Technician Certification,

Timeline

Chief Engineer

Crestline Hotels
03.2025 - Current

Maintenance Engineer Supervisor

Grove Park Inn
01.2025 - 03.2025

Chief Engineer

Crown Plaza Hotel
02.2000 - 08.2008

Bible College - Bible College

Fruitland College

GED - Ged

Continental Academy
Joao De Campos