Contributed to improved operational safety by executing maintenance tasks effectively.,Achieved reliable equipment performance through diligent monitoring efforts.,Advanced personal growth within a safety-driven company culture.
• Installed grounding systems, conduit, steel structures, and support equipment.
Backfilling.
Conduit
• Install grounding grids, equipment grounds, control centers, and substation fencing systems.
• Install PVC and rigid metal conduit runs above and below grade, including trench and duct bank systems.
• Perform substation construction and maintenance work on high-voltage utility projects.
• Assisted with substation construction, material handling, and site preparation.
• Erect structural steel, dead ends, bus stands, switch stands, and support structures.
• Install and assist in commissioning substation equipment including power transformers, CCVTs, lightning arresters,
switches, and metering equipment.
• Assist with bus installation including measuring, bending, cutting, cleaning, and bolting connections.
• Pull, label, strip, and terminate control wire and cable in field panels and control houses.
• Read and interpret blueprints, electrical schematics, and wiring diagrams to ensure accurate in
Assisted with substation construction, material handling, and site preparation.
• Installed grounding systems, conduit, steel structures, and support equipment.
• Performed cable pulling, wire labeling, control wiring, and termination work.
• Performed substation construction, equipment installation, and electrical support on high-voltage projects.
• Installed grounding systems, conduit runs, steel structures, and control center components.
• Supported bus installation, wire pulling, cable terminations, and field panel wiring.
• Read and interpreted electrical drawings, schematics, and blueprints.
Executed installation of grounding grids for equipment at control centers and substation fencing systems.
• Install PVC and rigid metal conduit runs above and below grade, including trench and duct bank systems.
Facilitated material handling and site preparation for substation construction projects.
• Installed grounding systems, conduit, steel structures, and support equipment.
• Performed cable pulling, wire labeling, control wiring, and termination work.