Summary
Overview
Work History
Education
Skills
Timeline
Generic

Blessie Espinoza

Lathrop,CA

Summary

Highly motivated Product Engineer with comprehensive experience in process improvement, quality assurance, planning, and manufacturing capabilities. Hands-on individual comfortable working in close proximity with engineers and design team to promote efficient product releases. Skillful in developing manufacturing processes and setting production goals.

Overview

29
29
years of professional experience

Work History

Pre-Production Engineer - Planner

APCT
10.2021 - 08.2023
  • Increased efficiency in manufacturing operations through effective pre-production planning and resource allocation.
  • Analyst project on identified issues during prototype testing, enabling corrective actions to be taken before moving forward with production.
  • Developed comprehensive project schedules for pre-production tasks, resulting in better time management and reduced delays.
  • Enhanced collaboration between departments by establishing clear communication channels and facilitating cross-functional meetings.
  • Streamlined communication with suppliers, ensuring timely availability of required components for production runs.

PCB Front-Engineer (Supply Chain)

Phase 3 Technology.
09.2020 - 09.2021
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Performed preventative maintenance to keep tools and equipment functional.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Participated in formal internal design reviews of proposed products and components.

Front End Engineer Support (InPlan Process Writer)

Harbor Electronics
10.2000 - 08.2020
  • Write rule for manufacturing processes using InPlan software.
  • Developed streamlined coding processes for improved efficiency and faster project completion.
  • Worked with production enginer team to deliver digital creative campaigns and initiatives.
  • Create stack up for different types of Impedance modeling during design and during production
  • Support Production in resolve DFM

Pre-Engineering (Planner)

Pycon Inc.
01.1995 - 08.1999
  • Provided expert consultation on various engineering topics, contributing valuable insights to aid in successful project execution.
  • Increased client satisfaction by delivering high-quality engineering plans on time and within budget constraints.
  • Conducted thorough analysis of complex technical data to inform decision-making processes during project planning stages.
  • Evaluated project risks, implementing mitigation strategies to minimize potential issues effectively.
  • Maintained strong working relationships with clients through regular updates and effective issue resolution techniques.

Education

Associate of Arts - Business Administration

San Joaquin Delta College
Stockton, CA
06.1988

High School Diploma -

Edison High School
Stockton, CA
06.1986

Skills

  • Production Planning
  • Computer-Aided Manufacturing
  • Industrial Automation
  • Material Selection
  • Design of experiments
  • ISO Standards
  • Manufacturing Processes
  • Sketches, specifications, and drawings
  • Bill of Material (BOM)
  • Workflow Streamlining
  • Process evaluation

Timeline

Pre-Production Engineer - Planner

APCT
10.2021 - 08.2023

PCB Front-Engineer (Supply Chain)

Phase 3 Technology.
09.2020 - 09.2021

Front End Engineer Support (InPlan Process Writer)

Harbor Electronics
10.2000 - 08.2020

Pre-Engineering (Planner)

Pycon Inc.
01.1995 - 08.1999

Associate of Arts - Business Administration

San Joaquin Delta College

High School Diploma -

Edison High School
Blessie Espinoza