Summary
Overview
Work History
Education
Skills
Timeline
Generic

Bowdy Holm

Seattle,Washinton

Summary

Construction professional Talented Superintendent offering 30 plus years of experience supporting construction aspects of Heavy Highway and Civil projects. Successful at overseeing communication and operations between teams, vendors and design professionals. Focused on keeping projects safe on time and under budget using time management and prioritization skills.

Overview

36
36
years of professional experience

Work History

Superintendent

Aecon
09.2023 - Current
  • Oversee pipe crew on the installation of over 18,000 lineal feet of pipe. Assisted with two pre-cast box culverts. Building of multiple height and length walls.
  • 125 million
  • Highway 18 from I-90 to Deep Creek

Structure Superintendent

Kiewit
09.2021 - 09.2023
  • This project is a design build with 13 bridges. Two of the bridges are total replacement ten are widening and one deck replacement
  • 450 million
  • I-17 Flex lanes
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.

Owner/Operator With Class A CDL

Holm Trucking LLC
08.2019 - 09.2021
  • Over the road step deck, reefer and drive in experience with Semi
  • Analyzed operational data to identify areas for process improvement and increased efficiency.
  • Negotiated contracts with clients, enhancing profitability while maintaining strong customer relationships.

Crane Operator

Wadsworth
10.2018 - 08.2019
  • Received operator of the year award.
  • Ran RT 880
  • Operated cranes to lift, move, and place materials safely on job sites.
  • Conducted routine inspections to ensure proper functioning of crane equipment.
  • Collaborated with team members to plan and execute complex lifting operations.

Project Superintendent

Flatiron Construction
09.2016 - 10.2018
  • U.S. 34 Emergency Repair
  • Pena Bridge Repair
  • $5 to $15 Million
  • Led project teams in executing construction plans, ensuring adherence to safety and quality standards.
  • Coordinated schedules, resources, and subcontractors to meet project milestones effectively.
  • Implemented cost control measures, enhancing budget compliance across multiple projects.
  • Oversaw site inspections, addressing issues proactively to maintain regulatory compliance and safety protocols.

Structure Superintendent

Sema Construction
11.2012 - 09.2016
  • Poplar Bluff, MO.
  • $10 to $25 Million
  • This was a 12-hour Railroad shut down to tear out and replace a 50-foot span of bridge Steel girder.
  • Lacassine, LA.
  • Over saw two 3 span precast bridges with 6000 foot of pile and 300 foot of precast double cell Box Culvert.
  • Ran 250 Link Belt Crawler setting pre-cast box culverts.
  • Led project teams in executing construction plans, ensuring quality and compliance with safety standards.
  • Coordinated schedules and resources, optimizing workflow across multiple job sites to enhance productivity.
  • Mentored junior staff, fostering skill development and adherence to best practices in construction management.
  • Implemented process improvements that reduced project timelines while maintaining high-quality outcomes.
  • Cultivated strong relationships with clients and stakeholders, facilitating effective communication throughout project lifecycle.

Project Superintendent

Harrison Western
08.2011 - 11.2012
  • Successfully designed and poured a concrete bulkhead with drilling and blasting of excavation. I managed the successful project of pumping 14,000 cubic yards of concrete 1000 feet below the surface. 10-million-dollar project came in on time and under budget under my direction. This was a temporary job.
  • Lyons, Kansas Bulkhead Project
  • $10 Million Project

Project Superintendent

Graham Construction & Management
05.2007 - 08.2011
  • Spokane, WA. Wandermere Bridges North South Freeway, Two bridges 1000' long and 100' in elevation with the largest shaft 10' diameter and 185’ deep with large continuous steel cages. Finished all substructures and with steel erection on the girders with one deck. Operated cranes from 60-ton to 400-ton using two crane picks.
  • Evaro Hill-Missoula, MT - One 3 span bridge over railroad tracks with small shafts and spread footings and BT girders while working on the reservation. Operated cranes from 60-ton to 150-ton.
  • US 95 Worley, ID - Four bridges from 300' to 550' with H pile and spread footings and BT girders while working on the reservation. Operated cranes from 60 ton to 125 ton.
  • All projects were done on time and under budget.
  • $8 to $50 Million Project
  • Led project teams in executing construction plans, ensuring adherence to safety and quality standards.
  • Coordinated schedules, resources, and subcontractors to meet project milestones effectively.
  • Implemented cost control measures, enhancing budget compliance across multiple projects.
  • Oversaw site inspections, addressing issues proactively to maintain regulatory compliance and safety protocols.
  • Handled scheduling of subcontractors and staff to complete projects within required timeframes.
  • Conducted regular site inspections to assess progress, address issues, and maintain quality control throughout the project lifecycle.
  • Monitored project milestones and adjusted scheduling to meet deadlines.
  • Oversaw selection, procurement and allocation of building materials and equipment.

Structure Superintendent

Ames Construction
04.2002 - 05.2007
  • Scotts Bluff, NE - Highway 71 project. Managed pours for bridges from 3 to 8 spans.
  • Denver, CO - Forest City development with four bridges from 2 parabolic curved post tension decks with high-cost architectural designs.
  • Pampa, TX - Several railroad bridges from precast to pour in place. Three bridges completed under my supervision.
  • Parker, CO. Cherry Creek bridge for Richmond homes. One 3 span bridge.
  • Central City, CO. Two bridges on Central City Pkwy. One 3 span and one 1 span bridge.
  • Kremmling, CO. One bridge State Hwy 9 over Colorado River. One 3 span bridge.
  • Ran 60-ton RT for all aspects of construction. Ran 80-ton American Crawler for flying rebar and pier cap forms.
  • Received 2 awards from the Department of Transportation. All projects were done on time and under budget.
  • 2 to 10 million
  • Coordinated schedules and resources, optimizing workflow across multiple job sites to enhance productivity.
  • Implemented process improvements that reduced project timelines while maintaining high-quality outcomes.
  • Cultivated strong relationships with clients and stakeholders, facilitating effective communication throughout project lifecycle.

General Foreman

MKK, Washington Group and Peter Kiewit Joint Venture
06.2000 - 04.2002
  • Supervised the crew and the placement of finish work of over 106,000 cubic yards of substructure concrete. 26,000 yards of deck pours. 43 bridges in the first phase and miscellaneous structures. 32 decks placements were completed within 3 months under my direction, working with 9 crews and up to a total of 72 employees at any given time. Responsible for coordinating concrete orders and pumps and scheduling with other carpenter superintendents with items ready for placement. Project completed to date with 500,000 man hours and no lost time injuries.
  • 164 million

Carpenter/Concrete Foreman

Ames Construction
01.1993 - 06.2000
  • Successfully trained under experts in the field for every facet of concrete box culverts and bridge construction. Helped organize other carpenters and laborers. Promoted to concrete foreman because of attention to detail and good knowledge in the trade.
  • Confirmed employee time cards and handled payroll of 5 to 10-person construction team.

Apprentice Carpenter

Gilbert Western Construction Inc.
06.1989 - 01.1993
  • Assisted carpenters in building concrete structures.
  • Operated various hand and power tools, maintaining equipment for optimal performance and safety compliance.

Education

High School Diploma -

Spanish Fork High School
Spanish Fork, UT
05.1989

Skills

  • Experience in building several different designs of bridges, mine bulkheads, concrete box culverts and other miscellaneous concrete structures including inlets, water dissipators, canals, slope paving, power plants, dam towers, MSE walls precast panels and block and artwork involving different form liners Skilled in reading blueprints and custom specifications I have worked with cranes from 20-ton to 400-ton Including both hydro’s and crawlers I have experience in a variety of mass steel erections To date, I have a strong safety record with no recorded accidents involving myself or working crews under my direction Experienced in operating a track hoe, dozer and other smaller pieces of equipment Also experienced in the set up and take down of 3600 and 4800 Bidwell pavers My best record to date includes 173 cubic yards per hour deck placement and 80 cubic yards per hour on average
  • Quality standards
  • Construction management
  • Project coordination

Timeline

Superintendent

Aecon
09.2023 - Current

Structure Superintendent

Kiewit
09.2021 - 09.2023

Owner/Operator With Class A CDL

Holm Trucking LLC
08.2019 - 09.2021

Crane Operator

Wadsworth
10.2018 - 08.2019

Project Superintendent

Flatiron Construction
09.2016 - 10.2018

Structure Superintendent

Sema Construction
11.2012 - 09.2016

Project Superintendent

Harrison Western
08.2011 - 11.2012

Project Superintendent

Graham Construction & Management
05.2007 - 08.2011

Structure Superintendent

Ames Construction
04.2002 - 05.2007

General Foreman

MKK, Washington Group and Peter Kiewit Joint Venture
06.2000 - 04.2002

Carpenter/Concrete Foreman

Ames Construction
01.1993 - 06.2000

Apprentice Carpenter

Gilbert Western Construction Inc.
06.1989 - 01.1993

High School Diploma -

Spanish Fork High School