Organized and dependable Roofing Production Manager who is successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
9
9
years of professional experience
Work History
Production Manager
Great Roofing
05.2021 - Current
Build $4-$6M annually in roofing, siding, gutters, etc.
Manage all production activity, including material orders, work orders, scheduling, and quality control.
Create budgets for every job to ensure profit margins are being met, and update budgets with all change orders for every build.
Coordinate all trades for each project until completion.
Learn and implement a variety of new software's to create better company wide processes(Hover, JobNimbus, Xactimate, etc.).
Create and implement company wide safety program.
Resolve issues quickly to maintain productivity goals.
Evaluate employee performance and provide feedback and training as needed.
Increase overall productivity by identifying bottlenecks in the production process and proposing effective solutions.
Oversee all production employees, including project manager and all crew members.
Build relationships with suppliers and crews to create positive working relationships.
Estimate labor and material requirements to support anticipated workload.
Construction Project Supervisor
Servpro of Wheaton
09.2020 - 03.2021
Made sure the most qualified, lowest bidding contractor was awarded the job.
Was the direct contact between Servpro, the subcontractors, home/property owner, and insurance companies to maintain the project schedule and cost was being completed directly as agreed upon.
Ensured all Contractors were paid on time and by terms of the contract.
Used various programs such as Xactimate, Eagle-view, and Dash to provide estimates to the customer's insurance company.
Stopped at each active project daily to observe subcontractors, and make sure they were meeting scheduling deadlines
Construction Manager
American Tower Corporation
10.2017 - 08.2020
Managed various construction projects ranging from, but not limited to Build to Suit, Back-up Power, Redevelopment, Capex, Compounds restoration, etc
Worked directly with customers such as Verizon, AT&T, T-Mobile, and Sprint on various projects
Made sure all subcontractors/GC’s were meeting deadlines and performing the work correctly
Managed multiple General Contractors in the field and communicate daily to ensure the construction schedule is being met
Reviewed and approve closeouts documents prior to the General Contractor receiving payment
Attended bid walks, pre-con walks, and punch walks to make sure the job is done correctly
Reviewed the Bill of Materials and made sure the correct items were delivered on each site
Reviewed land surveys/blueprints to locate the utility easements on each site
Was in charge of reviewing all documentation and issuing the NTP to contractors.
Assistant Superintendent
McPartland Construction Consultants, Inc.
05.2016 - 10.2017
Responsible for site procurement on each job daily.
Attended coordination meetings with sub-contractors at various job sites.
Responsible for enforcing various jobsite safety procedures.
Assisted in daily general site maintenance and miscellaneous demolition.
Assisted in general carpentry for securing job site inspections and site maintenance.
Coordinated deliveries, placement of dumpsters and material storage on various sites.
Attended pre-bid and post-construction walks.
Project Engineer
F. H Paschen
10.2016 - 05.2017
Member of a $100 million project team at the Washington/Wabash CTA Station in Chicago
Attended coordination meetings with subcontractors, owners, and CTA personnel
Coordinated work with subcontractors, owners, and laborers on site
Submitted all RFI’s, change orders, and submittals for various projects including multiple CPS projects and for the new Washington / Wabash CTA Station ($100mil+)
Prepared site safety plans and site logistic plans on various projects
Helped the estimating department on numerous projects including a $50 million dollar winning bid for Indiana University
Coordinated deliveries, placement of dumpsters, and material storage on various sites
Attended final walk-throughs for various jobs and assisting with the final punch list
Contacted Suppliers and installers for pricing to assist with estimating
Supervised laborers to ensure all safety measures were being met and documented progress
Portrayed proper communication techniques with various companies on various projects
Practiced proper time management techniques while working on multiple jobs at once.
Intern
Kiewit Corporation
05.2015 - 08.2015
Focused on estimating, and calculating quantity takeoffs for railroad and large civil projects
Assisted in rewarding various Subcontractors bids after ensuring they are accurate
Calculated estimates for a new large runway at LAX international airport in California
Attended pre-bid, post-bid, and close out meetings for numerous construction projects
Education
Bachelor of Science – Construction Management -
Western Illinois University
Skills
Operations Management
Strong leadership abilities
Operating Budgets
Production Scheduling
Safety Management
Quality Control
OSHA Compliance
Project Management
Activities
Knowledge of Eagleview, Hover, JobNimbus, Albiware, Company Cam, AutoCAD, Revit, Bluebeam, Siterra US, Xactimate
Western Illinois Men’s Football team member (Fall-Spring 2012-13)
Was a member of Western Illinois Construction Management Association (Spring 13-2016)
Established a new Mechanical Construction Association of America chapter at Western Illinois University (MCAA)
Was the MCAA representative on WICMA’s Executive board
Property Manager for 320 N. McArthur Street and 308 W. Adams St. in Macomb, IL
30-hour OSHA certification
CPR/AED Certified
Additional 10-hour OSHA certification
References
Mr. Joseph Lopez, Project Manager/Sales Rep, Great Roofing, 20620 Burl Ct Suite 101, Joliet, IL, Josephlopez@greatroofingllc.com, 815-508-7960
Mr. Toby Hicks, Roofer/Crane Operator, Korellis Roofing, 1333 169th Street, Hammond, IN 815-909-7490
Mr. Tony Benidetti, Senior Project Manager, Servpro of Wheaton, 2206 N. Main Street, Wheaton, IL, tbenidetti@servpro9347.com, 630-465-0081
Mr. Barry Bergling, Senior Construction Manager, American Tower Corporation, 1101 Perimeter Dr. #700, Schaumburg, IL, Barry.Bergling@americantower.com, 312-804-3981
Mr. Lance Huggins, Senior Construction Manager, American Tower Corporation, 1101 Perimeter Dr. #700, Schaumburg, IL, Lance.Huggins@americantower.com, 618-806-2136
Mr. Brent Coker, MS/LA Construction Manager, American Tower Corporation, 10 Presidential Way, Woburn, MA, 01801, Brent.coker@americantower.com, 781-926-7079
Mr. Shawn McPartland, President, McPartland Construction Consultants, 1287 Camelot Lane, Lemont, IL, 60439, shawnmcpartland@comcast.net, (708) 878-9060
Mr. Ryan Hennebry, Wrestling Coach, Lemont High School, 800 Porter St., Lemont, IL, (630) 243-3816