Summary
Overview
Work History
Education
Skills
Timeline
Generic

Brandon Brooks

North Augusta,SC

Summary

Skilled Combo Pipe Welder and Boiler Maker with extensive experience at Local 188 and Boiler Makers Lc 26, adept in advanced welding techniques and safety protocols. Demonstrated excellence in precision measurement and blueprint interpretation, significantly enhancing project efficiency. Renowned for meticulous soldering, contributing to superior quality and durability in metal fabrications.

Overview

5
5
years of professional experience

Work History

Combo Pipe Welder

Local 188
Savannah, Georgia
07.2023 - Current
  • Combo pipe welder
  • Welded and assembled components of pressure vessels, piping systems, tanks, boilers and other metal structures according to blueprints.
  • Fabricated pipe spools from plate steel according to engineering specifications.
  • Cut pipes to size using saws or oxy-acetylene torches prior to welding.
  • Followed strict safety protocols while working on site.
  • Prepared surfaces by grinding, sanding or cleaning them before welding.
  • Maintained cleanliness of work area at all times Also weld stainless carbon and inconel

Boiler Maker

Boiler makers Lc 26
Statesboro, Georgia
03.2020 - Current
  • X ray Tube welder stick tig and fluxcore welder
  • Installed and repaired boilers, pressure vessels, tanks, and other heavy metal fabrications.
  • Welded components in flat, vertical, or overhead positions.
  • Cut materials to size with torches and hand tools.
  • Measured and marked cutting lines on material using a ruler or scribe.
  • Inspected welds visually for defects such as cracks or porosity.
  • Repaired worn or damaged parts of boilers, tanks, and vats by cutting out defective areas and replacing them with new plates or sections.
  • Constructed steel structures according to blueprints provided by engineers.
  • Used oxyacetylene torch to cut through steel plate for fabrication purposes.
  • Used welding and soldering equipment to join sheet metal components following blueprints and job specifications.
  • Used hoist to load structural parts of boilers, pressure vessels, and tanks on pallets.

Education

High School Diploma -

Woodlawn High School
Baton Rouge, LA
05-2013

Skills

  • Soldering techniques
  • Welding safety
  • Precision measurement/blueprint
  • Welding Techniques
  • Pipe fitting
  • Gas Metal Arc Welding
  • Shielded Metal Arc Welding/gtaw
  • Piping fabrication

Timeline

Combo Pipe Welder

Local 188
07.2023 - Current

Boiler Maker

Boiler makers Lc 26
03.2020 - Current

High School Diploma -

Woodlawn High School
Brandon Brooks