Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Brandon Marmolejo

Pharr,TX

Summary

Adept millwright with a proven track record at NexGen Constructors, enhancing equipment reliability and workplace safety by over 30%. Skilled in machinery installation, hydraulic systems, and fostering team communication. Excelled in fabricating parts and improving maintenance protocols, demonstrating exceptional mechanical aptitude and collaborative prowess.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Millwright

Nex Gen Constructors
09.2022 - 10.2024
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Enhanced equipment reliability by performing regular maintenance and repairs on industrial machinery.
  • Consistently met or exceeded company performance metrics for maintenance efficiency, equipment uptime, and safety compliance.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Assisted in the planning and execution of major shutdowns, ensuring timely completion of critical tasks within budget constraints.
  • Installed, repaired and maintained automated systems in accordance with safety regulations.

Millwright

Spirit
03.2021 - 04.2022
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Collaborated with engineering to design modifications for machinery, enhancing performance and reliability.
  • Enhanced team communication, introducing daily briefing on maintenance schedules and priorities.

Millwright

SACK
06.2020 - 01.2021
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.

Education

High School Diploma -

PSJA Southwest High School
Pharr, TX
05-2018

Skills

  • Fabrication
  • Hydraulic systems
  • Pump maintenance
  • Bearing installation
  • Machinery installation
  • Tool repair and maintenance
  • Coupling installation
  • Mechanical tools
  • Valve maintenance
  • Productivity and safety improvement
  • Equipment set up
  • Torque specifications
  • Machinery transporting
  • Seal replacement
  • Align equipment
  • Fabricate parts
  • Signal operators

Certification

  • Occupational Safety and Health Administration (OSHA) 10-Hour - OSHA Training Institute.
  • Occupational Safety and Health Administration (OSHA) 30-Hour - OSHA Training Institute.
  • MSHA 46
  • TWIC


Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Millwright

Nex Gen Constructors
09.2022 - 10.2024

Millwright

Spirit
03.2021 - 04.2022

Millwright

SACK
06.2020 - 01.2021
  • Occupational Safety and Health Administration (OSHA) 10-Hour - OSHA Training Institute.
  • Occupational Safety and Health Administration (OSHA) 30-Hour - OSHA Training Institute.
  • MSHA 46
  • TWIC


High School Diploma -

PSJA Southwest High School
Brandon Marmolejo