Surveyor bringing extensive field experience in GNSS and total station workflows to improve site accuracy and reduce rework. Delivers precise elevation and utility-location data for construction layout and boundary resolution while coordinating with crews and subcontractors to prevent conflicts. Aims to advance project timeliness and mapping reliability through careful data validation and clear field reporting.
Work History
Topographical Surveyor
Affiliated Surveyors | 10.2016undefined
Reviewed property deeds and easements, resolving boundary discrepancies with clients and municipal planning staff.
Street Surveyor
East Texas Bridge | 09.2013undefined
Surveyed curb returns and flowlines for drainage designs, producing elevation reports for engineers.
Project Surveyor
4 Years 8 Months
MP Heavy Construction | 10.2021 - 06.2026
Conducted field surveys with total station and GPS, captured elevation data for design-grade site maps.
Coordinated utility locator markings with subcontractors to prevent conflicts during trenching operations.
Street Surveyor
3 Years 10 Months
A.L. Helmann | 12.2017 - 10.2021
Calibrated GNSS equipment each morning and logged positional accuracy before field data collection.
Photographed and geotagged roadway defects, delivering location-specific evidence to maintenance crews.
Street Surveyor
6 Years
RK Hall construction | 07.2007 - 07.2013
Coordinated with traffic control crews to set temporary lane closures, keeping crews and pedestrians safe during surveys.