Summary
Overview
Work History
Education
Skills
Timeline
Generic

Brennan Markwart

Woodland,MI

Summary

Driven Millwright with extensive experience at Boldt and O’Connor, excelling in equipment installation and problem-solving abilities. Demonstrated success in enhancing maintenance efficiency and equipment uptime, achieving 98% accuracy in tasks. Skilled in blueprint reading and collaboration, effectively managing projects and fostering vendor relationships for cost savings.

Overview

2
2
years of professional experience

Work History

Millwright

Boldt Construction
03.2024 - 06.2024
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Adhered to all workplace safety policies, regulations and compliances.

Millwright Foreman

Boldt
10.2023 - 01.2024
  • Prioritized tasks strategically, addressing pressing issues promptly while managing long-term objectives.
  • Collaborated with management to develop effective strategies for equipment upgrades and replacements.
  • Communicated effectively with cross-functional teams to achieve common goals related to project timelines and deliverables.
  • Developed strong relationships with vendors, resulting in cost savings on parts and supplies.

Millwright

Boldt
08.2023 - 10.2023
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Read and interpreted blueprints and schematics to understand machinery design and layout.
  • Inserted shims, adjusted tension on nuts and bolts and positioned parts, using hand tools and measuring instruments with [Number]% accuracy.

Millwright

O’Connor
03.2023 - 05.2023
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Participated in root cause analysis efforts for recurring equipment failures to develop long-term corrective actions.
  • Optimized equipment lifespan through proactive monitoring of wear patterns and making adjustments as needed.
  • Troubleshot machinery problems and suggested accurate repairs.

Millwright

O’Connor
10.2022 - 02.2023
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Consistently met or exceeded company performance metrics for maintenance efficiency, equipment uptime, and safety compliance.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.

Education

High School Diploma -

Janesville Craig High School
Janesville, WI
06.2018

Skills

  • Safety Compliance
  • Equipment Installation
  • Heavy Lifting
  • Fabrication
  • Pump maintenance
  • Parts Installation
  • Bearing installation
  • Conveyor Systems
  • Blueprint Reading
  • Equipment Repair
  • Repair work
  • Equipment rebuilding
  • Problem-Solving
  • Time Management
  • Problem-solving abilities

Timeline

Millwright

Boldt Construction
03.2024 - 06.2024

Millwright Foreman

Boldt
10.2023 - 01.2024

Millwright

Boldt
08.2023 - 10.2023

Millwright

O’Connor
03.2023 - 05.2023

Millwright

O’Connor
10.2022 - 02.2023

High School Diploma -

Janesville Craig High School
Brennan Markwart