Results-driven project manager with extensive experience in construction estimation and strategic planning. Successfully managed multi-million dollar projects, enhancing operational efficiency and client satisfaction while ensuring adherence to budget and quality standards.
Work History
Owner/Operator
7 Years 9 Months
The Mens Room | 11.2018 - Current
Managed daily operations of the barbershop.
President/CEo
20 Years
Absolute Constructors Inc. | 07.1998 - 07.2018
Founded the company as the qualifier with a B100 and E100 business license, Acquired credit and developed the relationships with our bonding company, banking, vendors, clients and all other aspects required to start a construction company.
Over the course of being in business we performed in excess of $160,000,000 worth of work focusing primarily in municipal water and waste water services. As a ground up contractor we specialized in the concrete construction and heavy above and below ground piping systems. We quickly became recognized as the preferred contractor and leader in the industry. We peaked at over 70 employees. Often had up to 200 workers on the ground as subcontractors at any given time.
Major clients included West Jordan City, South Jordan City, the Cities of Orem, Sandy, Herriman, Riverton, Bluffdale, Salt Lake, and Draper to name a few.
Acted as lead estimator and project manager on virtually every project we completed. Utilized excel spreadsheats as our estimating program that I wrote based upon the UMPS system (unit manhour performance system) that was learned and used while working with TIC (The Industrial Company)
Worked on several design/build projects with Hansen, Allen & Luce (Marv Allen especially), Major projects Include the Olmsted Flowline Terminal Reservoir (WW Clyde and The Burea of Reclamation, Orem Sewer Treatment Plant, Spanish Fork Sewer Treatment Plant, Central Valley Sewer Treatment Plant, Built 62 culinary conventional and prestressed, water tanks throughout central and northern Utah ranging from 200.000 gallon to 10,000,000 gallons.
Concrete Journeyman - General Superintendent
10 Years 11 Months
TIC The Industrial Company | 07.1987 - 06.1998
Implemented unit manhour performance standards to assure that project was performed at or below project estimate and budget.
Supervised concrete pouring and finishing to ensure project specifications and quality standards were met.
Collaborated with engineers to troubleshoot design challenges, ensuring integrity in all concrete, structural and piping applications.
Led crews in evaluating site conditions, preparing materials, and executing complex concrete and structural steel installations.
Installation and alignment of turbine equipment.
Implemented safety protocols, resulting in a significant reduction of workplace accidents during operations.
Trained junior staff on equipment operation, mixing techniques, and safety procedures for optimal performance.
Major Projects include: Apex Rocket Fuel Facilty Moapa Valley Nevada, Kennecott Coppermine 4th Line Expansion Project, Copperton Utah, Brady Hot Springs Geothermal Powerplant, Hazardous Waste Incinerator Kimball Nebraska, Kennecott Refinery and Smelter Expansion Projects Magna Utah, Robinson Copper Mine Ely, Nevada
Nuclear Machinist's Mate 3rd Class
1 Year 3 Months
United States Navy | 02.1986 - 05.1987
Attended Bootcamp and "A" School at Great Lakes, Illinois
Temporary duty at Naval Air Station, Millington, Tennessee.
Attended Nuclear Power Advanced Program at Orlando Florida
Received and an honorable/medical discharge after a knee injury that rendered me physically unable to perform duties at sea. Received 30% disability.
Education
High School Diploma
Cody High School | Cody, WY | 06.1985
Certificates of Completion
ABC of Utah | Salt Lake City, UT
Professional Development: Multiple business and trade classes including Bridging the Gap, Construction Estimating, Construction Scheduling including Primavera and Microsoft Project, Excel, Powerpoint and Word.
Held licenses in Utah for B-100 (building) and E-100 (engineering) and required continued yearly education to maintain license status for 20 years
No Degree - Nuclear Engineering Advanced Program
Nuclear Power School | Orlando, FL | 05.1987
Skills
Construction Estimating
Operations management
Documentation and reporting
Hiring
Business planning
Personnel management
Operations oversight
Negotiation
Strategic planning
Budget development
Relationship management
Staff training and development
DOT compliance
Financial planning
Client relationship management
Financial reporting
Risk management
Accounting principles
Profit optimization
Equipment operation
Schedule management
Document management
MSHA and OSHA Trained
Timeline
Owner/Operator
The Mens Room
11.2018 - CurrentRead More
President/CEo
Absolute Constructors Inc.
07.1998 - 07.2018Read More
Concrete Journeyman - General Superintendent
TIC The Industrial Company
07.1987 - 06.1998Read More
Nuclear Machinist's Mate 3rd Class
United States Navy
02.1986 - 05.1987Read More
ABC of Utah
Certificates of Completion
Read More
Cody High School
High School Diploma
Read More
Nuclear Power School
No Degree from Nuclear Engineering Advanced Program