Precise Framer adept at working on commercial and residential buildings. Reliable worker with strong mechanical aptitude and willingness to learn. Fast learner, good multi-tasker and proficient at reading and interpreting blueprints.
Overview
8
8
years of professional experience
Work History
Drywall/Lead Framer
Interior Specialty Construction
08.2021 - 12.2023
Used nail guns, saws and grinders safely and without incident.
Accurately and safely installed wall and ceiling structures according to blueprints, customer requests, and available inventories.
Operated forklifts and other heavy equipment.
Read and interpreted blueprints and construction documents to determine project directives.
Measured, cut and installed drywall, paneling and other materials.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Repaired damaged doors, windows and other structures.
Safely operated electric cordless and hammer drills and cutting torches.
Managed inventory of tools, supplies and equipment.
Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
Installed insulation, trim and other finishing touches.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Planned and executed work with proper tools and materials to maximize efficiency.
Drywall/Lead Framer
Ocean Drywall
01.2016 - 03.2019
Operated forklifts and other heavy equipment.
Read and interpreted blueprints and construction documents to determine project directives.
Measured, cut and installed drywall, paneling and other materials.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Repaired damaged doors, windows and other structures.
Managed inventory of tools, supplies and equipment.
Followed protocols and stayed organized to provide personal and teammate safety.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Planned and executed work with proper tools and materials to maximize efficiency.