
Engineering trainer and senior leader with 33 years of expertise in propulsion and auxiliary systems troubleshooting, preventive maintenance, and machinery repairs. Improve shipboard readiness through structured technical training and performance coaching. Support safe, reliable operations through rigorous maintenance execution and problem resolution.
Developed training materials, conducted condition reviews, and performed program audits for U.S. Navy surface ship crews, enhancing operational readiness and organic repair capability.
Provided technical guidance and support for diesel propulsion plants, generators, control systems, and auxiliary equipment. Worked with shipboard personnel to strengthen technical knowledge, resolve propulsion and support issues, improve maintenance practices, and raise engineering readiness.
Supported organic repair capability assessments across 30 vessels to diagnose and repair mechanical and combat systems issues at sea, reducing reliance on outside contractors and in-port overhauls.
Facilitated training and administrative reviews for 20 personnel onboard USS Comstock. Reviewed and implemented 65 READ E-6 material checks in the main propulsion and auxiliaries engineering department.
Overhauled NR1 and NR2 Sauer WP45 low-pressure air compressors (LPAC) aboard USS Fort Worth, supported alignment verification and installation of Naxi air compressor aboard USS Howard, and overhauled three Rix air compressors for base loan pools, optimizing resource availability for MCM platforms.
Resolved technical issues during installation, modification, repair, maintenance, troubleshooting, and testing of U.S. Navy shipboard compressed air systems, ensuring operational readiness.
Executed mechanical repairs and testing on various ship components including Crompton Greaves (CG), CVN, DDG, FFG, LHA, LHD, LPD, LSD, MCM, LCS, and MSC, enhancing system reliability.
Used mechanic tools, manifolds, vacuum pumps, recovery equipment, micro gauges, torque wrenches, micrometers, dial indicators, and precision measuring instruments for repair, assembly, installation, and testing of components and subassemblies.
Leadership assignment strengthened departmental readiness by placing command senior chief duties over 69 assigned personnel for 5 months.
Readiness and policy compliance improved through full-spectrum oversight of engineering plant evolutions during rotational crew deployment aboard USS Fort Worth.
Operational reliability remained high through maintenance and operation of the Navy's most advanced integrated electro-mechanical propulsion, electrical power generation, and auxiliary systems, including Combined Diesel and Gas Turbine operations; readiness control officer qualification aboard Freedom-class ships and extensive corrective and preventative maintenance on Rolls-Royce MT30 marine gas turbine, Fairbanks Morse diesel engine, Isotta Franchini diesel generator, Sauer medium-pressure air compressor, Maag reduction gears, and hydraulic equipment aboard.
Developed and instituted training program to enhance technical understanding and procedural compliance in Littoral Combat Ship engineering environment. Published course materials and notifications for selected personnel. Conducted needs assessments to determine learning objectives and modified training material per updated Navy policies.
Trained and qualified 3 engineers as Readiness Control Officers (RCO) responsible for maintaining engineering plants' main propulsion, electrical, auxiliary, and damage control systems, while enforcing safety practices. Trained 8 Engineering Plant Technicians in operation and maintenance of main propulsion, electrical, auxiliary, and damage control equipment.
Coordinated corrective actions following quality assurance audits and surveillances to ensure compliance with specifications.
Completed opening reviews of assigned controlled work packages to verify objective quality evidence supported work recertification.
Executed three main propulsion diesel engine load-sharing tests for USS Pioneer full-power demonstration, including cold and hot checks across all four main engines, receiving recognition from INSURV inspectors.
Coordinated engineering training activities, personnel qualification standards, watch bills, maintenance schedules, and quality assurance programs to ensure operational readiness.
Directed and mentored engineering department enlisted and officer personnel, enhancing morale, training, and job satisfaction.
Supported chief engineer main propulsion assistant in monitoring safe, proper operation of ship propulsion and auxiliary engineering plants.
Supervised 13 personnel in engineering department, ensuring effective corrective and preventive maintenance on main propulsion, electrical, auxiliary, and damage control equipment.
Led 3 personnel in depot-level repairs to No. 1 main propulsion diesel engine, allowing sustained steaming at sea.
Facilitated rapid repairs to shipboard air conditioning and refrigeration plants during challenging deployment, ensuring operational readiness.
Managed records and program documentation that earned praise from afloat training group as "most impressive" during crew certification and contributed to overall 98% score.
Transformed engineering department of crew Gallant and supported USS Cardinal and USS Shrike through all commitments during challenging 5th Fleet deployment.