Summary
Overview
Work History
Education
Skills
Certified to operate Skid Steer, Man lift, and Scissor lift
Timeline
Generic

Brian Parr

Porter,TX

Summary

Proven leader in construction and project management, adept at driving projects to completion with exceptional quality. Skilled in framing techniques and fostering team collaboration, Enhanced project efficiency by 30% and significantly improved client satisfaction. Expertise in construction management and commitment to safety compliance set the foundation for successful residential and commercial projects. A member of the local 551 Carpentry Union as a Journeyman carpenter.

Overview

9
9
years of professional experience

Work History

Lead Carpenter

Balfour Beatty Infrastructure Inc.
02.2022 - Current
  • Completed installations of building structures.
  • Conducted thorough final inspections of completed projects to ensure adherence to specifications and industry standards.
  • Enhanced team productivity by implementing efficient project management strategies and prioritizing tasks.
  • Demonstrated versatility as a journeyman carpenter with experience in both rough framing and finish work across diverse construction environments.
  • Improved project efficiency by managing carpentry tasks and maintaining a well-organized work site.
  • Mentored apprentice carpenters, providing guidance on best practices for improved skill development and work efficiency.
  • Enhanced safety measures by consistently adhering to industry guidelines, reducing workplace accidents significantly.

  • Increased structural integrity of buildings through expert framing techniques, ensuring long-lasting durability.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Coordinated movement of materials and equipment to job sites.
  • Conducted detailed measurements and calculations for accurate material estimation, minimizing waste during construction.
  • Increased client satisfaction with high-quality craftsmanship in residential and commercial construction projects.
  • Interacted closely with customers to better understand project scope.
  • Completed projects on time and within budget through meticulous planning and efficient task execution.
  • Discarded debris and disposed waste to maintain cleanliness and quality standards.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Measured materials to determine sizes and quantity required for construction project.
  • Measured, drilled and sawed materials to perform successful home improvements.
  • Collaborated with other construction workers to coordinate projects and streamline process.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Operated forklifts and other heavy equipment.
  • Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
  • Inspected buildings to identify repair needs.

Shop Manager

Energy Reclaim
12.2015 - 06.2020
  • Maintained a clean, safe, and inviting store environment for both customers and employees by enforcing proper safety protocols and cleanliness standards.
  • Delivered excellent customer service by addressing and resolving customer inquiries and complaints.
  • Managed inventory control, cash control, and store opening and closing procedures.
  • Managed inventory levels for optimal product availability, resulting in fewer stockouts and increased sales.
  • Oversaw employee performance, corrected problems, and increased efficiency to maintain productivity targets.
  • Maintained safe working environment by enforcing adherence to safety and security protocols.
  • Increased customer satisfaction by implementing effective sales strategies and providing exceptional customer service.
  • Resolved customer complaints professionally and promptly, maintaining a positive brand image and enhancing customer loyalty.
  • Established strong vendor relationships for timely delivery of products and seamless order processing, ensuring customer satisfaction.
  • Recruited trained, and mentored a high-performing staff, fostering a positive work environment that encouraged teamwork and collaboration.
  • Evaluated employee performance through regular reviews, setting clear expectations, and offering constructive feedback for continuous development.
  • Improved staff morale through regular recognition programs, rewards incentives, open communication channels, resulting in lower employee turnover rates.
  • Trained and guided team members to maintain high productivity and performance metrics.
  • Assisted in recruiting, hiring and training of team members.

Project Manager

Hards Marina
01.2020 - 02.2020
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Enhanced team performance with targeted training programs, addressing skill gaps and promoting professional development.
  • Monitored project progress, identified risks and took corrective action as needed.
  • Maintained open communication by presenting regular updates on project status to customers.

Education

Associate of Science - Criminal Justice

Triton College
River Grove, IL

High School Diploma -

Walther Lutheran
Melrose Park, IL
06.1995

Skills

  • Framing Techniques
  • Demolition Work
  • Window Installation
  • Door installation
  • Residential construction
  • Project Management
  • Drywall Installation
  • Construction Estimating
  • Insulation Installation
  • Flooring Installation
  • Concrete Forming
  • Tile Installation
  • Painting and finishing
  • Project estimation and bidding
  • Siding Installation
  • Commercial construction experience
  • First Aid Training
  • Heavy Equipment Operation
  • Client Communication
  • Worksite safety
  • Construction management
  • Remodeling Projects
  • Valid Texas driver's license
  • Basic plumbing knowledge
  • Roofing expert
  • Tool Maintenance
  • General laborer
  • Contract Management
  • Problem-Solving
  • Sub-flooring Installation
  • Attention to Detail
  • Home Renovation
  • Crew Management
  • Safety Compliance
  • Work Crew Coordination
  • Crew Scheduling

Certified to operate Skid Steer, Man lift, and Scissor lift

Certification was obtained through certification classes, training hours, and field experience.

Timeline

Lead Carpenter

Balfour Beatty Infrastructure Inc.
02.2022 - Current

Project Manager

Hards Marina
01.2020 - 02.2020

Shop Manager

Energy Reclaim
12.2015 - 06.2020

Associate of Science - Criminal Justice

Triton College

High School Diploma -

Walther Lutheran
Brian Parr