Installation of isomerization and HTU Units and refurbishing existing vessels and exchangers., Installation of Sulfur Recovery Unit with Amine and Scot Tail Gas Units.
General Foreman
Snyder Oil
Installation of 4 KCI Gas Compressors, Cryogenic Unit with Propane Storage, and refrigerate gas compression.
Pipe Foreman
Gas Company of New Mexico
Installation of new vessels and related piping and cooler for plant upgrade
Pipe Foreman
Conoco
Pipe Fitter
Kansas Power and Light
Installation of new coolers and Glycol unit also, removal of existing cooling tower for plant upgrades.
Pipe Fitter Apprentice
Conoco
Installation of Cryogenic unit.
Chief Inspector
Trans Western pipeline Company, San Juan, Expansion
01.2005
Oversaw the installation of one new solar 15,000HP Electric Drive compressor with Voith gear box and GE motor
Installed new Electrical Sub Station
Related piping at the Blanco Hub Meter station
Installed new meter runs for Conoco/Phillips.
Project Coordinator
TEPPCO
01.2004
P-35 expansion project in Indianapolis, Indiana.)
Installation of a 150,000-barrel liquid storage tank and associated piping
Installation of new fuel meter runs at several remote sites
Installation of 6 miles of 12” pipeline for product delivery
Installation of new liquid pumping station in Franklin, Indiana
Construction Manager
12.2021 - 05.2023
I have over 34 years of experience in the construction of pipelines and petro chemical plant facilities
That experience includes 25 years in the management of new construction projects, grass root projects, expansion projects, along with several other areas
I have experience on both sides of a project
I have worked in management for the contractor, as well as management for the Gas/Oil Companies
My experience includes small and large bore piping, civil work, building erection, gas compressor stations, pipeline management and inspection, pipeline routing and line placement, petro chemical, and process plants
Patriot Resources Incorporated
Managed construction on existing and new fields
Installation of new sales gas lines (both oil and gas)
Oversaw installation of new tank batteries, and new build pipelines from wells to tank batteries, as well as installation of new SWD lines and main loop lines
Chief Inspector
Energy Transfer, Deer, Station
12.2020 - 01.2021
Complete Demo of Oil Transfer Storage Terminal in Oklahoma City, OK, including all civil, mechanical, and electrical
Responsible for overseeing general contractor for all removal activities, to restore site back to natural pre-existing conditions.
Construction Manager
01.2019 - 01.2020
Work with Engineering and design for Proposed 42” Crude line from Nederland, Tx to Cameron Parish, Louisiana
Up front work with basic design and routing.
Construction Manager
Energy Transfer
01.2017 - 01.2019
Crude Line Lake Charles, La to St James, La, including the Atchafalaya River Basin
Construction Manager
01.2016 - 01.2017
Energy Transfer (Trunkline Gas Backhaul Project,
FREC Regulated)
Installed large bore piping, valves, and equipment to convert station to bi-directional flow (4 stations in Mississippi, Tennessee, and Illinois)
Construction Manager
01.2015 - 01.2016
Energy Transfer (ETCOP Project / DAPL)
Conversion of (334 miles of existing 30 inch) from Coldwater, Mississippi to Johnsonville, Illinois
Abandonment / Conversion of existing gas line to convert to crude, including replacement of new MLV
Removal of anomalies
Re-hydro test entire mainline segment
Installation of new launcher / receiver facility which included all existing compressor station bypass piping.
Chief Inspector
Sunoco Logistics
01.2014 - 01.2015
Granite Wash Ext Project)
Responsible for installation of new tank terminal and related pipeline facilities in Texas & Oklahoma.
Field Construction Manager
01.2013 - 01.2014
Energy Transfer (Eastern Gulf Crude Access Project-North Segment)
40 miles of 30” new lay
Abandonment and conversion of 565 miles of existing 30 from Southern Illinois to south Louisiana
Installation of 130 miles of 42” & 36” pipeline thru south Alabama and the panhandle of Florida
PHMSA hydrotest on 53 miles of existing 36” in central Florida
Construction Manager
Transwestern
01.2007 - 01.2008
Pipeline “Phoenix Project” (FERC Regulated)
Installation of 256 miles of 42” & 36” pipeline including related metering facilities in central Arizona
Sr Chief Inspector
Florida Gas Transmission
01.2005 - 01.2007
Turkey Point Project, FERC Regulated)
Installation of new grass roots compressor station in Miami, Fl
Sr Chief
01.2004 - 01.2005
Inspector, Florida Gas Transmission Phase 7 Expansion for Florida Gas Transmission FERC Regulate
Installation of 26 miles of 36” pipe on the FGT west leg in the peninsula (Gulf Coast side of Florida)
Chief Inspector
Florida Gas Transmission
01.2002 - 01.2003
(Grass roots Compressor Stations-FERC Regulated)
Installation of three 7200HP Rolls Royce Power Turbines, and related equipment
Inspected over 15.5 miles of 26” loop lines
Added to the existing 36” main line in Tampa, Florida
Lowered 36” mainline at Mobile, Alabama River crossings.
Construction Site Manager
01.2000 - 01.2002
Responsible for the overall field execution of a specific construction project with specific emphasis on safety
Responsibilities included: site preparation, foundation installation, and setting of process equipment, piping
It also included the administering of subcontracts and final testing in accordance with applicable codes to meet customer acceptance requirements.
Construction Assistant
01.1995 - 01.2000
Responsible for assisting the construction site manager in the management and direction of the construction site to which assigned
Duties included, but not limited to application of safety policies and procedures in all areas of responsibility, supporting and assisting management in FOB planning, scheduling, and status reporting, and coordinating resolutions of construction, engineering, and vendor related problems
Maintaining marked up IFC drawings that accurately reflect all field modifications, maintenance
Distribution of drawings and specifications
Coordination and management of subcontractors
Implementing and directing the QA program for the construction project, field surveying
Replacement of the Resident construction site manager on short-term projects.
General Foreman
Lion Oil Company
01.1993 - 01.1995
Installation of SRU with Scot Tail Gas.
Pipe Foreman
Freeport Mc Moran
01.1989 - 01.1991
Built skid mounted Sulfur Recovery Unit with Scot Tail Gas and Amine Treating for shipment offshore.
Education
High School Diploma -
Timeline
Construction Manager
12.2021 - 05.2023
Chief Inspector
Energy Transfer, Deer, Station
12.2020 - 01.2021
Construction Manager
01.2019 - 01.2020
Construction Manager
Energy Transfer
01.2017 - 01.2019
Construction Manager
01.2016 - 01.2017
Construction Manager
01.2015 - 01.2016
Chief Inspector
Sunoco Logistics
01.2014 - 01.2015
Field Construction Manager
01.2013 - 01.2014
Field Project Manager
Enterprise Pipeline Products
01.2012 - 01.2013
Construction Manager
Florida Gas Transmission
01.2009 - 01.2011
Construction Manager
Transwestern
01.2007 - 01.2008
Chief Inspector
Trans Western pipeline Company, San Juan, Expansion
Control Room Operator & Acting Shift Supervisor at Hengyuan Refining Company Berhad (Formerly known as Shell Refining Company (FOM) Berhad)Control Room Operator & Acting Shift Supervisor at Hengyuan Refining Company Berhad (Formerly known as Shell Refining Company (FOM) Berhad)
Field operator Fluidized Catalytic Cracking Unit (FCCU) for Reactor and regenerator unit at Hengyuan Refining Company Berhad (formerly know as Shell Refining Company (FOM) Berhad)Field operator Fluidized Catalytic Cracking Unit (FCCU) for Reactor and regenerator unit at Hengyuan Refining Company Berhad (formerly know as Shell Refining Company (FOM) Berhad)
Loading Controller at Hengyuan Refining Company Berhad (formerly known as Shell Refining Company Berhad)Loading Controller at Hengyuan Refining Company Berhad (formerly known as Shell Refining Company Berhad)