Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Bruce Penner

Truckee,CA

Summary

I manage in a collaborative manner. As the manager, my job is to make the key decisions for the department. Open consultation and decisive decision making is my management style.

Have over 25 years of mining and mineral exploration expertise. Have worked in isolated mining camps throughout Canada, South America and Africa.

Also have green-card status in the USA.

Have worked at four start-up situations and one closure as well as steady state mines. Have also done brown-fields exploration within the tenement package as well as project management transitioning from greenfields exploration to resource declaration of new tenements.

Have 6 years of Chief Geologist and over 13 years of Senior Geologist management experience in both underground and open pit environments.

Have a proven ability to do geological research to create a viable ore genesis model. This understanding is employed to make good mining decisions to maximize Net Present Value for the mining company.

Overview

34
34
years of professional experience

Work History

Senior Peoject Geologist

AngloGoldAshanti Mining
01.2023 - Current
  • Developed and implemented real-time data interpretation and communication strategies for a 12 drill recourse drill project.
  • Obtained permits, planned and budgeted operations and coordinated Safety and Environmental compliance for contractors.
  • Helped to solve geology-related issues at Beatty Project using mapping, geophysical surveys, RC and core drilling.
  • Supervised seven geologists and 10 geological technicians as well as drilling contractors.
  • Collected, reviewed and interpreted incoming real-time geological data gathered at the Beatty Project for use in Concept, Pre-Feasibility and Feasibility reports.
  • Compiled data, conducted QAQC, completed lithology, alteration and oxidation modeling and created presentations with LeapFrog software.
  • Acted as a team leader in group projects, delegating tasks and providing feedback.

Chief Geologist

B2Gold
04.2018 - 05.2022
  • Management of the production and near site exploration for a 220,000 ton per day open pit Fekola Gold Mine in Mali.
  • Manage a staff of 2 expat and 18 mine geologists as well as 24 RC drilling samplers.
  • Manage the development and updates of lithological, structural and alteration models as well as the Ore Control model.
  • Manage the RC drill program to ensure that it is aligned with the production schedule. Develop and ensure that the QAQC program for RC drilling and assaying is being deployed in a systematic manner.
  • Manage the process for the creation of post blast minable ore polygons and field control of mining these blocks to minimize dilution through effective communication with the planning and operation mining sections.
  • Establish optimal blending strategies by effective communication with the ore processing management section to achieve budgeted ounce production.
  • Devise and manage brownfields exploration and drilling to generate ore resources within the tenement package for future production.
  • Work with the Engineering Planning section to devise yearly and LOM plans and budgets.
  • Act as resource for geotechnical mapping and slope stability for the Geotechnical section within the Engineering Planning department.
  • Develop and manage all periodic reporting and reconciliations.
  • Conduct quarterly performance reviews and establish learning goals for all members of the geology staff.

Chief Geologist

First Quantum Minerals
08.2016 - 04.2018
  • Management of production and near pit exploration of a 165,000 ton per day copper mine in Mauritania.
  • Manage a staff of 6 geologists and 27 ore spotters and samplers.
  • Act as mentor for production geologists for the new ore blockout process instituted at the minesite.
  • Organize ore control field work with operation and mining departments to insure that ore and waste are sent to the proper locations.
  • Create a monthly reconciliation process to document the accuracy of ore control, ore reserve models against the monthly actual production.
  • Consult with planing engineers for attainment of short and LOM extraction of ore to maximize profit.
  • Manage the blend feed and stockpile systems to deliver forecasted grades to the process plant.
  • Provide geological guidance for negating the effect of deleterious elements contained within the feed.
  • Guide the development of a pit and regional geological framework for the exploration of additional ore sources within the tenement package.
  • Manage the minesite geology budget and contractor geology budget.
  • Guide the geological research into the potential for underground operations.

Senior Geologist, Stand-in for the Chief Geologist

Nevsun Resources
03.2014 - 05.2016
  • Daily management of the geology department of a 240,000 ton per day Bisha gold, copper and zinc mine in Eritrea.
  • Supervise a geology staff consisting of 7 production geologists and well as 45 ore spotters and samplers.
  • Insure that budget and forecast production is occurring in a safe and efficient manner.
  • Mentor the production geologists to attain best practice in ore control, mapping and field sampling. Write and implement all SOPs for these responsibilities.
  • Support and supervise Geo-technical Geologists when the Senior Geo-technical Engineer is offsite.
  • Implement the following processes to increase profitability and efficiency. MPX and GCX processes for ore block-out and reporting. ArcPad for in-pit mapping and geotechnical data gathering. Create all SOPs and insure that geologists are educated and proficient in the use of these processes.
  • Consult with the engineering department for all planning and forecasting processes.
  • Consult with the Ore Processing groups to insure maximal recoveries are maintained and optimal blends are fed into the mill.
  • Supervision of all stockpile activities.

Senior Geologist

Kinross Gold Corp
09.2011 - 09.2013
  • Daily management of grade control department for an open pit gold mine operating at 280,000 tons per day Tasiast Mine in Mauritania.
  • Department grew from a start of 6 national geologists and 15 technicians to present crew of 15 geologists and 45 technicians.
  • Grade control department has the lowest incident/accident rate of all the production departments at the minesite.
  • Responsible for all incident investigations as well as writing most of the SOPs and JSAs.
  • Responsible for all grade control block models and ore block-outs
  • Use MP3 simulation software to calculate grade control block models.
  • Use Surpac software to create mining block-outs.
  • Use BMT balls and software to measure blast movement and adjust blockouts for production accordingly. Mentor national geologists to complete this task.
  • Insure that all processes are in place and operating to keep mining proceeding uninterrupted .
  • At the beginning of my tenure the mine to mill reconciliation was 15-20% variance. Last 8 months have seen a mine to mill reconciliation of 5-8% variance.
  • Use Adamtech cameras and software to record and digitize structural data. Mentor national geologists to do this task.
  • Map and mentor national geologists to map in lithologies, alterations and structural data into paper maps and transfer data into Surpac databases.
  • Assist Engineering Department with short and medium term mining schedules.
  • Mentor national geologists in proper design and execution of RC grade control programs.
  • Create accurate and timely month end reports.

Senior Geologist

Kinross Gold Corp
06.2007 - 08.2011
  • Daily Management of the Geology Department for an underground cut and fill exoskarn gold mine, Buckhorn, operating at 2,000 tons per day.
  • Start-up operation went from a department of 1 to 8 geologists and 3 technicians.
  • Responsible for creating and writing all SOPs for the critical path processes of the Geology Department.
  • Insure that processes were followed and work was accurate and timely. This lead from a dilution of 12% in the first year being decreased to an average of 3% for the second and third years of my time there.
  • Created all the processes for recording geologic data within Vulcan software of the daily mine advances.
  • Interpretation of this data to create surfaces and solids of lithologies and structural zones for future mining.
  • Strategic incorporation of Adamtech photogrammetry in structurally critical and dangerous situations.
  • Creation of a MRMR database where differing ground support techniques were applied to different qualities of rock.
  • Planning and execution of infill diamond drill programs and mentoring core logging as well as structural/geotechnical logging.
  • Creation of accurate and timely period ending reports.

Senior Geologist - Grade Control

Kinross Gold Corp.
04.2004 - 06.2007
  • Creation of Ore Block Outs for an open pit gold mine operating at 300,000 tons per day.
  • Insure that all production drill hole data is correctly entered and validated in the appropriate databases.
  • Use Vulcan software to create a kreiged grade control ore model and block out mine-able blocks to report to the various processes at the minesite.
  • Insure that areas that have been under-drilled have RC drilling completed. Logged chips and entered data into the appropriate databases.
  • Supervise drilling contractors to insure QAQC was properly completed and that this complete project was done in accordance to Kinross safety procedures.
  • Insure that all lithologies and important alterations were recorded in a Autocad database.
  • Complete Geotechnical Cell Mapping on all highwalls with differing lithologies to insure safe bench angles during lay-back mining.

Senior Geologist Production

Kinross Gold Corp.
01.2000 - 03.2004
  • Daily Management of Geology Department of an underground longhole open stoping mine operating at 3000 tons per day.
  • Creation of short term ore block outs and assist in year end ore reserve calculation using Vulcan software.
  • Geologic and Geotechnical mapping of all underground headings
  • Planning and execution of all underground diamond drill programs.
  • Logging of core and assuring QAQC was properly conducted.

Exploration/Production Geologist

Echo Bay Mines Ltd
06.1990 - 08.1998
  • Split responsibilities for the near site exploration at the Lupin Mine in Nunavut Canada and various exploration projects in Chile as well as production geologist at Lupin.
  • Generation of drill projects and keeping databases current.
  • Daily management of diamond drilling and RC dilling projects.
  • Logging core and chips from drilling and conducting hole surveys.
  • Geological and geotechnical base mapping within project areas and creation of 2D and 3D maps and cross-sections.
  • Budget reviews and report writing.
  • Daily mapping and development control of underground ore headings.
  • Supervision of sampling projects underground and keeping access sampling databases current.
  • Geological data analysis of mapping and sampling data to generate ore and lithological solids within a Vulcan software platform.
  • Generation of tonnage and grade and mining block reports with production engineers to create rolling three month production forecasts.

Education

Bachelor of Science - Geology

Brandon University
Brandon
1986

Skills

  • Geological interpretation/application
  • Departmental management
  • Surpac Software proficiency
  • Vulcan Software proficiency
  • Minesight Software proficiency
  • Leapfrog Geo Software proficiency
  • OrePro3D Software proficiency
  • Geotechnical data gathering and analysis
  • Operational Production Geology
  • Strong Mentoring skills
  • Gold and Copper Mining

Accomplishments

    Geologic Analysis and Interpretation:

    Mine to Mill reconciliation +2% for 4 years of production (Fekola).

    Executed the change over from blast hole sampling to RC drilling for OC modelling data gathering. Introduce new blockout procedure that is geostatistically sound and in alignment with the new ore genesis model (MCM).

    Reduced dilution from 12% to 3%. Accomplished by generating a new ore genesis model for the deposit. Used structural controls to guide ore polygon generation (MCM).

    Mine to Mill reconciliation improvement 15-20% to 5-8%. Accomplished by recognizing that differing lithologies react with differing blast displacement. Brought in BMT to track blast movement (Tasiast).

    Develop a chip logging and interim face mapping program. Integrate this into the ore blockout process to better define ore zones and aide in geological interpretation (Bisha).


    Staff Mentorship and Management:

    Critical skills identified and individuals lacking these skills were individually mentored to insure they could achieve standards

    Highly skilled individuals were identified and given more freedom and responsibilities (Fekola and Bisha).

    Develop a Performance Management Review Process where geologists have established responsibilities and metrics for measuring their development (Fekola and Bisha).

    Develop new organizational structure for the Geology Department with clear developmental pathways for national staff (Fekola and Bisha).

Timeline

Senior Peoject Geologist

AngloGoldAshanti Mining
01.2023 - Current

Chief Geologist

B2Gold
04.2018 - 05.2022

Chief Geologist

First Quantum Minerals
08.2016 - 04.2018

Senior Geologist, Stand-in for the Chief Geologist

Nevsun Resources
03.2014 - 05.2016

Senior Geologist

Kinross Gold Corp
09.2011 - 09.2013

Senior Geologist

Kinross Gold Corp
06.2007 - 08.2011

Senior Geologist - Grade Control

Kinross Gold Corp.
04.2004 - 06.2007

Senior Geologist Production

Kinross Gold Corp.
01.2000 - 03.2004

Exploration/Production Geologist

Echo Bay Mines Ltd
06.1990 - 08.1998