Accomplished Derrickhand with a proven track record at America Well Service, adept in rig operation and leading teams to enhance safety and efficiency. Skilled in fall protection and fostering teamwork, I excel in high-pressure environments, significantly contributing to operational success and safety compliance.
Knowledgeable Desired Position with strong background in oil and gas drilling operations. Adept at maintaining equipment integrity and ensuring safety on site. Demonstrated expertise in critical thinking and teamwork.
Proactive and goal-oriented professional with excellent time management and problem-solving skills. Known for reliability and adaptability, with swift capacity to learn and apply new skills. Committed to leveraging these qualities to drive team success and contribute to organizational growth.
Experienced leader with strong background in guiding teams, managing complex projects, and achieving strategic objectives. Excels in developing efficient processes, ensuring high standards, and aligning efforts with organizational goals. Known for collaborative approach and commitment to excellence.
The derrickhand’s main responsibilities are performing tasks up in the derrick and operating the pump under direction from the driller and Rig Manager. This involves inspecting the derrick and crown, and maintaining good housekeeping and maintenance in and around the pump and tank. The derrickhand works alone a lot of the time, however, there are times when the floorhands will assist. In these times, the derrickhand will organize, lead and guide the floorhands to help complete a specific job, while always following all safe work procedures. Overall, the derrickhand plays an important role in ensuring the safe and efficient operation of the rig.
The ideal person for this position is someone who has experience in rig drilling and has strong attention to detail and communication skills. They should have a deep understanding of safe work procedures and be able to effectively train and teach others. Additionally, the ideal candidate should be able to work independently much of the time. They should also be an advocate for safe working conditions. Overall, the derrickhand should be a reliable and safety-conscious worker who can effectively operate the pump and tank and perform tasks up in the derrick while ensuring a safe and efficient work environment
After a well has been drilled, the casing cemented, the shale fractured, the pad laid, and the piping and production equipment installed, the flowback phase begins.
Flowback typically lasts between 30 and 120 days. The fluid produced during this phase is a mixture of crude oil, natural gas, water, and sand.
A producer’s goal during this period is to manage the sandy flowback fluid and keep the well open and running so it can normalize and more freely flow oil and gas.
The fluid first flows up the well bore and through the wellhead, which is often referred to as the “Christmas tree.” From there it moves to sand separators.
Sand separators spin the production fluid, which creates centrifugal force. This is where the bulk of the sand is processed out of the fluid. It is then piped to on-site frac tanks, which trucks will retrieve throughout the process
Cargué herramientas para perforar pozos para diversas pruebas, mantuve y reparé bombas de lodo a diario, reparé bombas, tanques de lodo y equipos relacionados.
Responsable de mantener el lugar de trabajo, el equipo y las herramientas limpios y en buen estado de funcionamiento.
Ayudé en la inspección y el mantenimiento diarios del equipo.
Realicé con éxito el manejo de elevadores, la construcción de líneas duras y los procedimientos de aislamiento de energía. Comprendí y sigo las instrucciones dadas por el mentor y todo el personal principal.
Apoyé a la tripulación como jugador de equipo de manera profesional.