Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Bryan Villarreal

Del Rio,TX

Summary

Reliable General Labor Construction Worker known for high productivity and efficient task completion. Specialize in site preparation, heavy lifting, and machinery operation. Excel in teamwork, problem-solving, and adaptability which contribute to successful project outcomes. Committed to safety protocols and quality standards while ensuring timely job execution.

Overview

5
5
years of professional experience

Work History

Solar Panel Installer

Wanzek MasTec
Hockley, TX
01.2024 - 11.2024
  • Laid out and installed mounting hardware, such as brackets, bolts, and screws.
  • HPP Bombing
  • Assembled solar modules, panels and support structures to maintain efficient installation, electrical configuration and system maintenance
  • Load and unload equipment and materials
  • solar installing
  • racking assembly
  • civil
  • all assigned duties

Solar Panel Installer

TIC
Brackettville, TX
02.2023 - 11.2023
  • HPP Bombing
  • Load and unload equipment and materials
  • Solar panel install
  • Rigging
  • Racking assembly
  • Pile layout
  • General cleanup and clearing of debris
  • All other duties as assigned

Forklift Operator

ACT Entertainment
Del Rio
08.2022 - 02.2023
  • Unloaded and stacked materials by raising and lowering lifting devices
  • Unloaded materials and goods at designated locations for best project availability

Forklift Operator

Gxo
Del Rio
03.2022 - 08.2022
  • Unloaded and stacked materials by raising and lowering lifting devices
  • Unloaded materials and goods at designated locations for best project availability
  • Transported goods between warehouse locations according to shipment and storage needs
  • Wrapped pallets in plastic wrap and attached merchandise tags to prepare for shipping

General Laborer

IEA - Construction
11.2020 - 04.2021
  • Pile Distribution
  • String Line
  • Flying Torque Tubes
  • Pile Caps
  • Torque Tube kitting
  • PV module install

General Laborer

M.A Mortenson
Crane, TX
09.2019 - 03.2020
  • Pile Distribution
  • String Line
  • Flying Torque Tubes
  • Pile Caps
  • Torque Tube kitting
  • PV module install

Education

High School Diploma -

Del Rio High School
Del Rio, TX
06.2013

Skills

  • Warehouse picking
  • Documentation
  • Palletizing
  • Certified forklift operator
  • Inventory reporting
  • General laborer
  • Worksite safety
  • Quality and compliance
  • Solar installations
  • Rack and mounting assembly
  • Teamwork skills
  • Module and array layouts
  • PV system installation

Languages

  • Spanish, Full Professional
  • English, Full Professional

Timeline

Solar Panel Installer

Wanzek MasTec
01.2024 - 11.2024

Solar Panel Installer

TIC
02.2023 - 11.2023

Forklift Operator

ACT Entertainment
08.2022 - 02.2023

Forklift Operator

Gxo
03.2022 - 08.2022

General Laborer

IEA - Construction
11.2020 - 04.2021

General Laborer

M.A Mortenson
09.2019 - 03.2020

High School Diploma -

Del Rio High School
Bryan Villarreal