Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Bryce Gonnie

Flagstaff,United States

Summary

Versatile Concrete Laborer adept at completing tasks quickly and correctly to maximize team productivity and job efficiency. Knowledgeable about mixing, pouring and smoothing concrete on-site as well as how to work with pre-cast pieces. Offering 6 years of experience in industrial/commercial concrete construction. Hardworking and detail-oriented with proven history of teamwork and reliability. Bringing understanding of appropriate protective measures, correct equipment operation and how to effectively contribute to team success through dedicated and responsible work.

Overview

2
2
years of professional experience
1
1
Certification

Work History

Journeyman Carpenter/Concrete Finisher

Wanzek
Pueblo, CO
09.2021 - 03.2022
  • Shoveled materials such as dirt, gravel and asphalt.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Set wood and other forming materials to prepare for concrete pours.
  • Wore correct clothing and protective equipment for jobs.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Mixed, spread and patched concrete to specifications.
  • Created specific finishes on poured concrete.
  • Adhered to safety and reporting procedures.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Demolished and repaired old concrete surfaces.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.

Millwright

Industrial Service Company
Gila Bend, AZ
11.2020 - 07.2021
  • Adhered to all workplace safety policies, regulations, and compliances.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Operated machine tools to fabricate parts during overhaul, maintenance or setup of machineries.
  • Laid out mounting holes, using measuring instruments, and drilled holes with power drill.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Safely used blow torches, hammers and forklifts, resulting in 200 days without accident.
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Inserted shims, adjusted tension on nuts and bolts, and positioned parts, using hand tools and measuring instruments with 85% accuracy over 15 min.
  • Kept detailed and accurate maintenance reports and documentation of progress.
  • Connected power unit to machines or steam piping to equipment, and tested units to evaluate mechanical operation.
  • Signaled crane operator to lower basic assembly units to bedplate and aligned unit to centerline.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Journeyman Carpenter/Concrete Finisher

PACE Pacific
Phoenix, AZ
08.2020 - 10.2020
  • Shoveled materials such as dirt, gravel and asphalt.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Set wood and other forming materials to prepare for concrete pours.
  • Wore correct clothing and protective equipment for jobs.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Mixed, spread and patched concrete to specifications.
  • Created specific finishes on poured concrete.
  • Adhered to safety and reporting procedures.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Completed physically demanding tasks such as lifting up to 50-100 pounds to move job materials.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Routinely lifted and moved items weighing up to 50-100 pounds.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.

Journeyman Carpenter/Concrete Finisher

Matrix Service Company
Searchlight, NV
11.2019 - 07.2020
  • Shoveled materials such as dirt, gravel and asphalt.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Set wood and other forming materials to prepare for concrete pours.
  • Wore correct clothing and protective equipment for jobs.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Mixed, spread and patched concrete to specifications.
  • Created specific finishes on poured concrete.
  • Adhered to safety and reporting procedures.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Demolished and repaired old concrete surfaces.
  • Completed physically demanding tasks such as lifting up to 50-100 pounds to move job materials.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Completed physically demanding tasks such as lifting up to 50-100 pounds to move job materials.
  • Routinely lifted and moved items weighing up to 50-100 pounds.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Repaired damaged jobsite vehicles (small equipment) using different chemicals and tools.
  • Completed physically demanding tasks such as lifting up to 50-100 pounds to move job materials.

Education

High School Diploma -

Monument Valley High School
Kayenta, AZ
05.2017

Skills

  • Strong reading & math skills
  • Give & receive constructive feedback
  • Ability to communicate questions, directions, and decisions to team members
  • Ability to adapt to new advancements
  • Willingness to learn
  • Great problem-solving & decision-making skills
  • Attention to detail
  • Various hand and power tool Operation (Pneumatic Chiseling, Power Vibrations, Power Saws, Floats and Spreaders, Jointers and Edging Tools, etc )
  • Able to promote team member motivation
  • Able to promote workplace safety & PPE compliance

Certification

  • OSHA Training for Construction Industry Course - 10 hours
  • MSHA Training - 50 hours

Timeline

Journeyman Carpenter/Concrete Finisher

Wanzek
09.2021 - 03.2022

Millwright

Industrial Service Company
11.2020 - 07.2021

Journeyman Carpenter/Concrete Finisher

PACE Pacific
08.2020 - 10.2020

Journeyman Carpenter/Concrete Finisher

Matrix Service Company
11.2019 - 07.2020

High School Diploma -

Monument Valley High School
Bryce Gonnie