Summary
Overview
Work History
Education
Skills
References
Certification
Timeline
Generic

Leo Rexwinkle

Dayton,TX

Summary

With over 20 years of experience in large industrial settings, I possess extensive knowledge and expertise in various roles. Starting as a welder and advancing into supervision, I have collaborated with numerous engineering and design builders throughout my career. Transitioning to a full-time Inspection/Client Representative 12 years ago, I successfully managed and completed facility expansions, gaining hands-on experience in working with diverse equipment and plant processes. Additionally, I played a pivotal role in the construction of new plants from inception. Throughout the years, I have overseen multiple crafts including pipe, millwright, civil, iron, insulation, instrumentation, and electrical.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Construction Consultant

Applied Consultants/Endeavor Energy Resources
04.2022 - Current
  • Oversee Construction and turnover of Tank batteries and flowline installation.
  • Provide constructability support to engineering and upper management.
  • Provide on-site representation for Endeavor Energy Resources.
  • Reduced safety incidents on job sites by enforcing strict adherence to safety protocols and providing comprehensive training to workers.
  • Maintained safe working environment by identifying and correcting potential safety concerns and hazards.
  • Oversaw and monitored daily functions, timeliness, quality of workmanship and completion of work.
  • Mentored junior team members in industry best practices, contributing to their professional growth.
  • Evaluated subcontractor performance to maintain quality standards and ensure timely completion of tasks.
  • Conducted thorough site inspections to identify potential risks, ensuring regulatory compliance at all times.
  • Utilized value engineering techniques where necessary for optimizing costs without sacrificing design intent.
  • Liaised between clients and contractors during disputes resolution process maintaining harmonious working relationships.
  • Enhanced client satisfaction with regular progress updates and proactive communication regarding potential issues.
  • Improved construction project efficiency by streamlining processes and implementing best practices.
  • Identified cost-saving opportunities through careful analysis of construction plans, materials, and labor requirements.
  • Managed the procurement process efficiently ensuring timely delivery of materials for uninterrupted work.

Construction Manager

KAP Project Resources/Lubrizol Corporation
01.2022 - 04.2022
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Collaborated closely with clients to ensure project objectives were met, maintaining transparent communication throughout the process.
  • Implemented safety protocols for reduced workplace injuries, conducting regular site inspections and safety meetings.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.
  • Prepared and managed project budgets to accurately track costs and expenses.
  • Coordinated permit acquisition and ensured compliance with all regulatory requirements throughout each stage of construction.
  • Maintained strong lines of communication with all stakeholders involved in the project, ensuring transparency and collaboration towards shared goals.
  • Conducted thorough risk assessments to identify potential hazards early in the planning stages, mitigating delays or complications.
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.

Hydro Testing Consultant

Quality Integrated Services/Charps
10.2021 - 10.2021
  • Evaluated client needs and expectations, establishing clear goals for each consulting engagement.
  • Liaised with customers, management, and sales team to better understand customer needs and recommend appropriate solutions.
  • Collaborated with cross-functional teams to successfully deliver comprehensive solutions for clients.
  • Managed client relationships through regular check-ins and updates on project progress.

Welding Inspector

Applied Consultants/XTO
08.2021 - 09.2021
  • Assisted in the development of comprehensive welder training programs to improve skill levels across the team consistently.
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation.
  • Reduced rework costs by identifying defects early in the fabrication process through diligent inspections.
  • Maintained accurate inspection records for future reference and quality control purposes.
  • Reviewed specifications in order to assess contractor compliance with design.
  • Streamlined documentation processes by maintaining organized records of completed welds, tests performed, and any resulting nonconformities.
  • Ensured safety compliance with regular audits of equipment and work areas.
  • Monitored product quality at all stages of production process.

Construction Manager / Chief Inspector

Applied Consultants / Targa Resources
11.2017 - 05.2021
  • Capitol projects Construction Manager – Trains 6,7 and 8
  • Oversee and coordinate the daily activities of multiple on-site contractors
  • Provide on-site representation for Targa Resources
  • Coordinate with off-site vendors, fabricators and inspection team to ensure timely delivery
  • Weekly visits to offsite fabricators to maintain Quality Assurance and assist with all scheduling conflicts
  • Ensure that all company specifications as well as governing codes are followed
  • Generate and ensure completion of preliminary and final punch list
  • Review all contractor turn over documentation prior to final submittal
  • Coordinate and oversee Baseline UT readings.

Facility Inspector

Applied Consultants
07.2017 - 10.2017
  • Scope of work: Oversee construction and turnover of Tank batteries, compressor stations and saltwater disposal stations
  • Prepared reports detailing findings of inspections, investigations, and tests.
  • Ensured compliance with industry regulations through meticulous attention to detail during inspections.
  • Delivered detailed reports on findings from inspections, helping stakeholders understand areas requiring attention or improvement in order to maintain regulatory compliance.
  • Upheld codes and regulations governing materials, processes, and procedures.
  • Identified potential hazards and recommended corrective actions, ensuring a safer work environment for all employees.
  • Maintained up-to-date inspection and audit records for improved reporting and analysis.
  • Coordinate Materials, NDE, Hydrostatic testing and review contractor procedures
  • Complete all required turnover documentation
  • Permian Basin
  • Inspected and examined materials and finished parts and products for defects and wear to verify conformance with blueprints, diagrams, and template specifications.
  • Identified repair and upgrade requirements needed to meet safety and quality standards.

CFR Phillips 66- Beaumont Terminal

Quality Integrated Services/ Phillips 66
01.2017 - 06.2017
  • Re-work pump, tank and pipeline piping and assemblies
  • Type “B” sleeves, Cut-outs and or re-coats
  • Oversee capitol and major maintenance projects
  • Complete all required turnover documentation
  • Promoted a culture of accountability through consistent enforcement of company policies and procedures among team members.
  • Optimized workforce utilization, balancing employee needs with operational demands to maintain high productivity levels.

Welding Inspector

MBF Inspection Services/Spectra Energy
09.2016 - 11.2016
  • 2016 PENN-JERSEY anomaly investigations-East
  • Scope of work- excavate, evaluate and repair or replace anomalies
  • Type “B” sleeves, Cut-outs and or re-coats
  • Complete all required PHMSA documentation (repair reports, coating reports…)
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation.
  • Maintained accurate inspection records for future reference and quality control purposes.
  • Tested welders for understanding of code and proficiency in different environments.
  • Conducted visual inspections of welded joints using various tools such as magnifying glasses, mirrors, or videoscopes for accurate assessments.
  • Collaborated with welders to provide guidance on proper techniques and materials for optimal results.
  • Examined products for imperfections and defects.
  • Followed standard operating procedures for inspections and tests.

Chief Inspector/Construction Coordinator

Quality Integrated Services/Targa Resources
05.2015 - 06.2016
  • 100K BBL/Day Fractionation Unit
  • Flare Gas Recovery Unit
  • Managed a team of inspectors, providing coaching and mentoring to enhance their technical skills and overall performance.
  • Conducted thorough investigations of safety incidents, identifying root causes and implementing corrective actions.
  • Established strong relationships with regulatory agencies, ensuring compliance with all relevant laws and regulations.
  • Increased client satisfaction by maintaining open lines of communication regarding project status updates and addressing concerns promptly.
  • Completed thorough written descriptions and took photographs to document conditions.
  • Examined relevant documents prior to inspections in order to become acquainted with property features.
  • Drafted detailed reports on findings of inspections.

Chief Facilities Inspector Little Missouri #3 45 Mil. Cryo

Quality Integrated Services/Targa Resources
09.2014 - 05.2015
  • Oversee all work and approve any extra work performed by contractor outside of base scope
  • Approve all turnover documentation for mechanical and final completion
  • Generate punch list prior to mechanical and final completion
  • Assure all work performed on site by all crafts is safe and acceptable per national codes and standards as well as the specifications set forth by Targa Resources
  • Ensured compliance with industry regulations through meticulous attention to detail during inspections.
  • Delivered detailed reports on findings from inspections, helping stakeholders understand areas requiring attention or improvement in order to maintain regulatory compliance.
  • Upheld codes and regulations governing materials, processes, and procedures.
  • Improved quality assurance procedures to minimize errors and increase effectiveness of inspections.
  • Identified potential hazards and recommended corrective actions, ensuring a safer work environment for all employees.
  • Identified repair and upgrade requirements needed to meet safety and quality standards.
  • Inspected and examined materials and finished parts and products for defects and wear to verify conformance with blueprints, diagrams, and template specifications.
  • Streamlined inspection processes for faster turnaround times, resulting in increased productivity.

South Texas Project Manager

Brazos Rock Energy Services
01.2013 - 05.2014
  • EFS Mid-Stream - Natural Gas & Oil Process Facilities Mid-Stream Plant – South Texas Project included installation of civil, iron, mechanical, instrumentation and electrical for inlet compression
  • BHP Biliton – Oil and natural gas pipe line installation
  • Tex-Star Midstream – Installation of various process systems, maintenance and upgrades of existing facility
  • EOG Resources – Multiple pipeline installations also numerous well-head gathering systems
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.

Project Superintendent

Louisiana Crane Company LLC
01.2012 - 01.2013
  • Marathon Oil Co
  • -Natural Gas & Oil Process Facility Mid-Stream Plant – Pilgrim, TX Area Project included mechanical, civil and pipeline work for central gathering system (Pipeline) including well Hook-ups and Central facility
  • EFS Mid-Stream - Natural Gas & Oil Process Facility Mid-Stream Plant – Three Rivers, TX Area Project included installation of civil, iron, mechanical, instrumentation and electrical for inlet compression
  • Talisman USA - Natural Gas & Oil Process Facility Mid-Stream Plant – Fowlerton, TX Project included mechanical, civil, instrumentation, electrical and pipeline work for central gathering system (Pipeline) including well Hook-ups and Central facility.
  • Worked with inspectors, workers and unions, to conduct weekly status updates.
  • Monitored project milestones and adjusted scheduling to meet deadlines.
  • Established transparent communication channels between stakeholders, ensuring timely updates on project progress and milestones achieved.
  • Compiled daily field report, detailing all key activities and outlining project progress for stakeholders.
  • Conducted walk-throughs with clients prior to project close, completing punchlists and answering all questions.
  • Fostered strong relationships with clients through excellent customer service skills and responsiveness during all phases of the construction process.
  • Collaborated closely with architects, engineers, and other professionals to deliver high-quality results on time and within budget.
  • Developed and maintained relationships with contractors, sub-contractors and stakeholders to support successful project completion.
  • Reduced construction timeframes for numerous projects through effective scheduling and resource allocation.
  • Enhanced safety measures on job sites, resulting in fewer accidents and a safer work environment.
  • Coordinated planning, scheduling and successful execution of multiple large-scale construction projects.
  • Ensured compliance with industry regulations and standards for all completed projects.

Education

High School -

Field Kindley High School
Coffeyville, KS
01.2001

Skills

  • Site Inspection
  • Subcontractor Management
  • Design review
  • Hardworking and Reliable
  • Attention to Detail
  • Problem-solving abilities
  • Construction Scheduling
  • Critical Thinking
  • Team Leadership
  • Effective Communication
  • Change order management
  • Safety Compliance

References

  • Mike Shepherd, Chief Inspector, Spectra Energy, (812) 899-0404
  • Andy Davis, Chief Facilities and pipeline Inspector, (337) 884-7539
  • Brett Eldred, Senior Vice President of Engineering, Targa Resources, Houston, TX, (713) 584-1118

Certification

  • Certified Welding Inspector (CWI) - American Welding Society (AWS) 15112171

Timeline

Construction Consultant

Applied Consultants/Endeavor Energy Resources
04.2022 - Current

Construction Manager

KAP Project Resources/Lubrizol Corporation
01.2022 - 04.2022

Hydro Testing Consultant

Quality Integrated Services/Charps
10.2021 - 10.2021

Welding Inspector

Applied Consultants/XTO
08.2021 - 09.2021

Construction Manager / Chief Inspector

Applied Consultants / Targa Resources
11.2017 - 05.2021

Facility Inspector

Applied Consultants
07.2017 - 10.2017

CFR Phillips 66- Beaumont Terminal

Quality Integrated Services/ Phillips 66
01.2017 - 06.2017

Welding Inspector

MBF Inspection Services/Spectra Energy
09.2016 - 11.2016

Chief Inspector/Construction Coordinator

Quality Integrated Services/Targa Resources
05.2015 - 06.2016

Chief Facilities Inspector Little Missouri #3 45 Mil. Cryo

Quality Integrated Services/Targa Resources
09.2014 - 05.2015

South Texas Project Manager

Brazos Rock Energy Services
01.2013 - 05.2014

Project Superintendent

Louisiana Crane Company LLC
01.2012 - 01.2013
  • Certified Welding Inspector (CWI) - American Welding Society (AWS) 15112171

High School -

Field Kindley High School
Leo Rexwinkle