NGA West Campus | St. Louis, Missouri
- Role: Controls Technician
- Project Value: $1.7 Billion
- Facility Size: 712,000 sq. ft. office building on a 97-acre secure campus
- Construction Duration: 2019–2026
- Performed point-to-point checkout of BAS field devices and HVAC control systems.
- Developed and refined Building Automation System (BAS) graphics for operator monitoring and control.
- Implemented programming changes to controllers to meet sequence of operations and owner requirements.
- Worked alongside commissioning agents during functional performance testing, startup, and system troubleshooting to verify proper operation and integration of HVAC systems.
- Assisted in resolving controls issues to support successful commissioning and project turnover.
Cal Poly Humboldt Engineering & Technology Building | Arcata, California
- Role: Commissioning agent
- Project Value: $100 Million
- Facility Size: 72,000 sq. ft.
- Construction Duration: 2014–2026
- Performed commissioning of mechanical and HVAC systems for a new engineering facility, verifying system performance, controls integration, and operational readiness during construction.
- Supported functional performance testing, equipment startup verification, and controls troubleshooting to ensure systems met design intent and owner requirements.
- Verified BAS control sequences, sensor calibration, and equipment response to ensure systems operated according to design intent.
- Reviewed trend logs and monitored BAS data to validate system performance and optimize equipment operation.
Jeffrey T. Fort Neuroscience Research Building (NRB) – Washington University School of Medicine | St. Louis, MO
Role: Controls Technician
- Project Value: $616 Million
- Facility Size: 609,000 sq. ft.
- Construction Duration: March 2020 – July 2025
- Verified operation of air handling units (AHUs), VAV terminal units, exhaust systems, chilled water systems, and associated controls sequences.
- Supported laboratory airflow control verification, including pressure relationships and ventilation requirements critical to research spaces.
- Reviewed BAS trends, alarms, and controller data to identify and resolve system issues.
- Coordinated with mechanical contractors, TAB technicians, engineers, and commissioning providers to correct deficiencies.
- Assisted with final system validation, documentation, and turnover activities prior to building occupancy.
- Supported a mission-critical research facility requiring reliable environmental controls for advanced biomedical research operations.
Gary C. Werths Building at Siteman Cancer Center (WUSM) | St. Louis, MO
Role: Controls Technician
- Project Value: $275 Million
- Facility Size: 657,250 sq. ft.
- Construction Duration: May 2021 – September 2024
- Reviewed BAS trends and alarms to help identify operational issues before final building turnover.
- Coordinated with commissioning providers, mechanical contractors, and project teams to resolve outstanding controls deficiencies.
- Supported final documentation, system validation, and owner turnover to prepare the facility for patient care operations.
- Worked in a mission-critical healthcare environment, ensuring building automation systems met reliability, safety, and performance requirements for a cancer treatment facility.
Mercy Hospital South - Emergency Department Expansion & Redeisgn | St. Louis, MO
Role: Commissioning Agent
- Project Value: $75 Million
- Facility Size: Expands Emergency Department from 39,000 sq. ft. to 65,000 sq. ft.
- Construction Duration: September 2024 – Summer/Fall 2027
- Verified BAS sequences of operation, control points, alarms, trends, and equipment responses during construction and startup phases.
- Performed field inspections to confirm proper installation, operation, and integration of mechanical and control systems.
- Coordinated with controls contractors, mechanical contractors, TAB technicians, engineers, and project stakeholders to identify and resolve deficiencies.
- Verified operation of critical healthcare HVAC systems, including air handling units (AHUs), VAV systems, exhaust systems, and emergency department ventilation systems.
- Reviewed BAS graphics, programming, and control sequences to ensure proper operator functionality and system performance.
- Assisted with troubleshooting controls issues and validating corrective actions during commissioning.
- Verified environmental conditions required for patient care areas, including temperature control, airflow, and pressure relationships.
St. Louis Community College – Transportation Education Center | St. Louis, MO
Role: Commissioning Agent
- Project Value: $48 Million
- Facility Size: 79,000 sq. ft.
- Construction Duration: October 2023 – January 2026
- Coordinated with controls contractors, mechanical contractors, TAB technicians, engineers, and project stakeholders to identify and resolve deficiencies.
- Witnessed and documented functional performance testing of air handling units, VAV systems, exhaust systems, and associated HVAC equipment.
- Verified temperature control, airflow, scheduling, and system response to ensure occupant comfort and efficient operation.
- Managed commissioning issues through deficiency tracking, corrective action verification, and final acceptance.
- Reviewed test reports, O&M documentation, and closeout materials to support successful project turnover.
- Supported owner training and final handoff to ensure facility staff understood system operation.