Summary
Overview
Work History
Education
Skills
Timeline
Generic

Caleb Hancock

Moultrie,GA

Summary

Efficient floor installer with 2 years of hands-on experience placing floor coverings in both commercial and residential buildings. Reliable and punctual individual skillful in preparing accurate estimates, cutting and trimming carpet and tile and trimming excess material. First-rate communication, multitasking and time management abilities. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

1
1
year of professional experience

Work History

Floor Installer

Mark Hancock
01.2023 - 08.2023
  • Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
  • Removed existing flooring to prepare flooring for New Floor Layout
  • Maintained excellent communication, cleanliness, and safety standards on work sites and projects, boosting customer satisfaction ratings 100%.
  • Spread adhesive cement over floor to prevent board joint wearing.
  • Stripped and refinished hard surface floors to maintain quality condition and appearance.
  • Performed preventive maintenance on already fitted tiles to guarantee longevity.
  • Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
  • Installed hardwood, laminate and vinyl flooring for multiple residential and commercial clients.
  • Cut and trimmed flooring to fit around obstacles and within tight spaces.
  • Utilized saws, nail guns and routers to safely complete flooring installation projects.
  • Applied adhesive substances to properly secure flooring and support longevity.
  • Inspected completed installations to verify adherence to quality standards and customer specifications.
  • Conducted accurate measurements and calculations to verify proper layout and installation.
  • Professionally sanded and sealed floors to complete installation process.
  • Installed floor coverings and edgings, using thresholds and carpet bindings to complete finish work.
  • Measured, cut, and installed tack-free strips along baseboards or walls.
  • Followed detailed blueprints and plans to achieve proper fit and design of installed flooring.
  • Operated hand tools and machines to cut material and achieve proper fit around obstructions.
  • Formed tight and secure joints by removing excess materials and connecting individual pieces.
  • Readied surfaces to accept coverings by sweeping away materials, correcting flows and applying special treatments.
  • Worked with different adhesives to join foundation, flooring and wall materials.
  • Installed sheeting on floor surfaces, applying adhesive, and rolling with sanding tool to form smoothest finish.

Education

High School Diploma -

Colquitt County High School
Norman Park, GA
05.2024

Skills

  • Materials Estimates
  • Safety Regulations
  • Measuring and Analytics
  • Leveling
  • Adhesive and Grouting
  • Ceramic Tile Installation
  • Adhesive Application
  • Room Arrangements
  • Marble and Tile Cutting
  • Maintaining Clean Work Areas
  • Cement Removal
  • Critical Thinking
  • Vinyl Plank Installation
  • Measurements
  • Active Listening
  • Precision Cutting
  • Hand Tool Usage
  • Seam Placement
  • Existing Floor Removal
  • Heavy Labor
  • Hardwood Installation
  • Remove Imperfections

Timeline

Floor Installer

Mark Hancock
01.2023 - 08.2023

High School Diploma -

Colquitt County High School
Caleb Hancock