
Dedicated laborer with 12 years as member of Local 472 Laborers Union. Tactical in heavy lifting and equipment operation. Proven ability to collaborate effectively in team settings while maintaining a strong focus on safety and attention to detail. Successfully installed complex drainage systems and contributed to major infrastructure projects, demonstrating exceptional problem-solving skills.
Used vac truck to excavate for soni-tube installation , formed and poured for a transformer pad and walls in Fairless Hills,PA. Using DOKA and Simmons forms , finishing concrete, and stripping the forms . Water meter pit installation with Bay Crane . RCP pipe installation and masonry work setting manholes to finished grade
Worked as a top man on a pipe crew, installing sewer, storm, and DIP and C-900 water pipe. Helped assist electricians install conduits and encase with concrete. Installed fire, hydrants valves, water, meter pits, wet, wells, underground, stormwater, basins, HDPE and RCP storm drainage pipe. Thrive off, doing masonry work, raising inlets and manholes to grade backfilling and grading for blacktop expertise and dealing with sinkholes properly. Remediating unstable ground and soils . Assisted with soil cement. Installed a few culverts for drainage and head walls. Using a hydraulic crane to set, or a tandem of 349 at times properly rigging and hoisting . What are management and footing prep work for retaining wall base assisted in the building of a 30 foot high retaining wall worked with DDC compaction specialist in Local 825 . Installed a 10 foot high Gabion basket wall about 1200’ in length. Managed pumps 2”-12”
Demolition of bridges steel annd concrete ; pre existing structures. Re decks, parapets, installed culverts, and MSE Walls . Worked collaboratively with Dockbuilders, driving sheeting walls; H-piles for pre foundation and new abutments for the 8th Street Bridge Passaic,NJ. Lagging with 3x10, was an active team member of the 206 bypass in Hillsborough, New Jersey and a variation of other NJDOT roadwork projects . Worked with ironworkers Dock, builders, carpenters and operators..
Jackhammering and sprawl repair , installed miles of plastic and steel gas main for Elizabethtown and PSEG . Timber shoring and installation of trench and manhole boxes.
Installed Plastic and Steel Gas main and services in the road and commercial sites . Excavated , compacted; paved trenches . Restored grass areas , and sidewalks .
Operated chainsaws, operated brush, chippers with a winch, crane jobs, removing trees, many land clearing jobs, take downs on commercial and residential properties.
Top man and pipe layer on a pipe crew installing storm, water, and sanitary sewer pipe completed construction of Pocono Raceway, installing storm inlets down pit Road, along with under drain pipe, active member of FEMA restoration project in Tunhannock,PA. Installed all underground utilities , along with sewer and water laterals , wet taps. Understands the importance of compaction and trench safety . Tower operator for Belvidere sand and gravel MHSA certified and maitenance of crushers and belts .
Responsible for landscaping duties, grading soil and aggregates, erosion blankets, Filtrexx, erosion control, retaining walls, and paver patios. Side install installation on commercial and residential, new lawn installations.. operated excavators, backhoes, tractors and skid steers. Mulching; edging installation of trees & plants, installed baffles, and water diversion system systems.
OSHA-30, Confined Space Certified, American Red Cross and CPR/First Aid,Local 472 Blue Print Class,Local 472 Foreman Training, Local 472 Flatwork Concrete Finish , small business owner Landscaping and small Excavation Jobs