Experience spans multiple heavy highway projects from interstate widening, surface repair, bridge construction, drainage infrastructure improvements, lighting installation, and retaining wall assembly:
- Allegheny County – SR 376(A72) #87778 (March 2024 to present) $70.1 million
- Allegheny County – SR 910(A50) #108501 (May 2023 to March 2024) $8.4 million
- Route 18 T10 – Route 18 Signal Upgrades #88829 (June 2020 to May 2023) $10.1 million
- I-70/I-79 Widening Project, North Junction with I-79 to SR 136 (Beau Street) #75950 (April 2020 - June 2020)
Responsibilities include:
- Determined staffing needs for the project and coordinated with employees for project scheduling including nights, weekends and short staff.
- Mentored new inspection staff on PennDOT resources and procedures.
- Assisted with project paperwork including reviewing staff PSA's for content and payment, drafting work orders and work authorizations, processing estimates and adjustments, completing CUFF reviews, conducting wage rate interviews, completing rotational capacity testing, project accident documentation, and drafting requests for additional funding from DPMC.
- Reviewed PPCC and ECMS daily for required paperwork based on the Pub 408 including shop drawings, source of supply, and certificate of compliance.
- Coordinated with various departments during the construction process including Environment, Bridge and Roadway Design, Utilities, ROW, Maintenance and adjacent construction projects.
- Coordinated field meetings, scheduling across stakeholders, chairing, documenting minutes. Field meetings included progress control meetings, asphalt and concrete pre-placement meetings, property owner concerns, environmental remediation, utility coordination, final inspection, railroad flagging, and meetings with local cities or townships.
- Reviewed the CPM Schedule updates for the project and mitigated potential delays.
- Completed weekly site environmental reviews, ensuring permit requirements are met by the contractor during construction.
- Coordinating with contractors on deficiencies and potential remediation actions.
- Completed traffic control reviews for detours, short term closures, and long term closures. Notified contractor of any issues and completed CS-901 reports.
- Scheduled material testing for the project and setting up sampling for concrete, asphalt and aggregate.
- Tracked utility relocation on the project, mitigating potential delays or claims caused by utility delays.
- Monitored project execution performance against the CPM Baseline Schedule.
- Assisted inspectors with daily construction operations including: drainage, roadway, bridge, utility, ITS, and environmental. Ensured staff understood assignments, resources available, and necessary paperwork.
- Ensured contractors and PennDOT staff were utilizing all PPE and safely working.
- Assisted PennDOT with the preparation of the claim filed by the contractor.
Allegheny County Airport Authority (May 2020 to March 2021)
Responsibilities include:
- Completed Constructability review of the McClaren Site 9 Development. Reviewed 60% design stage and 90% design stage completed by the consultant.
- Reviewed special provisions, ensuring all necessary items were included in the contract.
- Developed a preliminary schedule to compare against the contractor.
- Completed an owner cost analysis prior to bid.