Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Carlos R. Grijalva

Ogden

Summary

Skilled construction and fabrication professional with hands-on experience in concrete construction, stone fabrication and installation, drywall finishing, and warehouse operations. Proven ability to work efficiently in physically demanding environments while maintaining quality and safety standards. Experienced with forklifts, pallet jacks, and jobsite coordination. Reliable, adaptable, and detail-oriented.

Skilled Cement Mason and Concrete Finisher with background in both commercial and residential projects. Have experience in preparing, setting, and finishing surfaces of poured concrete, such as floors, walks, sidewalks, roads, or curbs using a variety of hand and power tools. Align work with safety standards while ensuring timely completion of projects. Known for ability to read blueprints accurately and calculate materials needed efficiently, contributing to the reduction of waste and overall project costs.

Overview

3
3
years of professional experience
3
3
years of post-secondary education

Work History

Concrete Laborer

General Contracting
Ogden
01.2013 - 01.2015
  • Assisted in construction of concrete forms for residential projects
  • Poured and finished concrete for driveways, sidewalks, and home foundations
  • Supported finishing crews to ensure smooth surfaces and proper curing
  • Maintained a clean and safe jobsite environment
  • Assisted in mixing and pouring concrete for various construction projects.
  • Maintained clean work areas by removing debris and ensuring safety compliance.
  • Loaded and unloaded materials from trucks for job site preparation.
  • Use shovels, hoes, rakes, and other tools to spread or level concrete.

Fabrication & Installation Assistant

Black Granite
Salt Lake City
01.2012 - 01.2015
  • Assisted with cutting, forming, finishing, and installing granite, Corian, and marble countertops
  • Installed backsplashes and sinks with attention to alignment and finish quality
  • Operated forklifts and pallet jacks to transport materials safely
  • Supported warehouse organization and material staging
  • Assisted installation teams with material handling and setup processes.
  • Maintained tools and equipment to ensure proper functioning during installations.
  • Followed safety protocols to maintain a safe work environment at job sites.

Education

High School Diploma -

Granite School District
Salt Lake City, Utah
08.2009 - 02.2012

Skills

  • Concrete forming
  • Concrete pouring
  • Concrete finishing
  • Granite fabrication
  • Marble fabrication
  • Corian fabrication
  • Granite installation
  • Marble installation
  • Corian installation
  • Countertops installation
  • Backsplashes installation
  • Sink installation
  • Drywall installation
  • Drywall finishing
  • Forklift operation
  • Pallet jack operation
  • Warehouse operations
  • Material handling
  • Jobsite safety
  • Teamwork

Languages

Spanish
Native/ Bilingual

Timeline

Concrete Laborer

General Contracting
01.2013 - 01.2015

Fabrication & Installation Assistant

Black Granite
01.2012 - 01.2015

High School Diploma -

Granite School District
08.2009 - 02.2012
Carlos R. Grijalva