Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Carlos Lerma

Pueblo,CO

Summary

Skilled Concrete Finisher with extensive experience at Full Tilt Construction, showcasing expertise in concrete finishing and a strong commitment to worksite safety. Demonstrated ability to enhance job site safety and efficiency, excelling in foundation work and finishing techniques. Proven track record in improving project outcomes through effective collaboration and mastery in power trowel operation.

Overview

2021
2021
years of professional experience

Work History

Concrete Finisher

Full Tilt Construction
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Set wood and other forming materials to prepare for concrete pours.
  • Collaborated with team members to ensure smooth transitions between different phases of the concrete placement process.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Created specific finishes on poured concrete.
  • Enhanced overall job site safety by ensuring proper usage of tools and equipment during concrete finishing processes.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.

Concrete Finisher

AA Construction
05.2020 - 02.2021

Education

South High School
Pueblo, CO

Skills

  • Concrete finishing
  • Worksite safety
  • Float finishing
  • Bull floats
  • Driveway installation
  • Hand tool operation
  • Foundation work
  • Finishing techniques
  • Power tool operation
  • Broom finishing
  • Hand troweling
  • Concrete repair
  • Commercial construction experience
  • Screed usage
  • Power trowel operation
  • Sidewalk construction
  • Cement and pavement
  • Concrete curing
  • Forklift operation
  • Slab construction

Languages

English and Spanish
Native or Bilingual

Timeline

Concrete Finisher

AA Construction
05.2020 - 02.2021

Concrete Finisher

Full Tilt Construction

South High School
Carlos Lerma