Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

CARLOS MEDINA

Altamonte Springs,FL

Summary

Civil engineer with 23 years of experience gained through diverse projects with strong change management skills and broad business acumen with a track record of progression in roles of increasing responsibility as General Manager of diverse projects in construction, design, and consulting engineering services, with current license in Colombia. Over eighty-five different projects in design and construction of highways, asphalt and concrete airport runways, bridge design and construction, small dam construction, highway and airport signage design, road, bridge and building construction over five levels. Demonstrated ability to analyze and identify engineering problems and recommend corrective action. Experience in site visits during construction to monitor progress, schedule adherence, costs, and liaise with contractors and engineers on site.

Overview

20
20
years of professional experience

Work History

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 12.2022
  • CONSTRUCTION OF CIVIL WORKS PHASE II, FOR THE SKATING RINK OF THE CITY OF NEIVA - DEPARTMENT OF HUILA
  • Managed budget development, forecasting, and financial reporting processes to track progress toward organizational objectives accurately.

General Manager

CFM INGENIERIA S.A.S.
06.2019 - 12.2021
  • CONSTRUCTION OF A SYNTHETIC GRASS FIELD, BLEACHERS, ROOFS, AND ENCLOSURE OF THE SOCCER FIELD IN THE MUNICIPALITY OF EL AGRADO HUILA.
  • Managed budget implementations, employee reviews, training, schedules, and contract negotiations.

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 12.2020
  • REHABILITATION AND MAINTENANCE OF ROADS IN THE DEPARTMENT OF CUNDINAMARCA.
  • Recruited, hired, and trained initial personnel, working to establish key internal functions and outline scope of positions for new organization.

General Manager

CFM INGENIERIA S.A.S.
06.2019 - 10.2020
  • STUDIES, DESIGNS AND EXTENSION OF THE DIRECT EXIT ROAD FROM THE EMERGENCY SERVICE TO THE RUNWAY AND MAINTENANCE OF THE ROAD TO THE ALFONSO.
  • Managed budget development, forecasting, and financial reporting processes to track progress towards organizational objectives accurately.

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 03.2019
  • TO ENABLE THE ROAD NETWORK UNDER THE RESPONSIBILITY OF INVIAS THROUGH THE CONSTRUCTION OF REINFORCED CONCRETE WALLS, CULVERTS, AND BOX CULVERTS.
  • Implemented effective cost-saving measures to reduce overhead expenses without compromising quality or service.

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 01.2018
  • CONSTRUCTION OF WORKS AND SIGNALING FOR ROAD SAFETY IN THE TERRITORIAL NARIÑO (ROADS WITH CONTROL AND SIGNALING DEVICES; VEHICLE CONTAINMENT SYSTEM, ROADS WITH COMPLEMENTARY ROAD SAFETY WORKS AND SCHOOL ZONES).

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 01.2018
  • CONSTRUCTION OF CONCRETE ROADS IN THE MUNICIPALITY OF LA CALERA.

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 01.2017
  • IMPROVEMENT OF THE RIOBLANCO - MESA DE PALMICHAL ROAD IN THE DEPARTMENT OF TOLIMA THROUGH THE CONSTRUCTION OF REINFORCED WALLS AND RIGID CONCRETE.

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 01.2016
  • CONSTRUCTION AND MAINTENANCE OF SPEED REDUCERS IN THE VALLE DEL CAUCA TERRITORIAL JURISDICTION ON HIGHWAYS UNDER THE RESPONSIBILITY OF INVIAS
  • SIGNALING AND ROAD SAFETY WORKS IN SCHOOL ZONES ON HIGHWAYS UNDER THE RESPONSIBILITY OF INVIAS IN THE JURISDICTION OF THE OCAÑA TERRITORIAL
  • ROAD SIGNALING WORKS DEPARTMENT OF META
  • LA MACARENA TRANSVERSAL PROJECT.

General Manager

CFM INGENIERIA S.A.S.
01.2016 - 01.2014
  • CONSTRUCTION OF A HIGH-PERFORMANCE SKATING RINK IN THE MUNICIPALITY OF PITALITO, DEPARTMENT OF HUILA
  • CONSTRUCTION OF VELODROME HIGH PERFORMANCE SPORTS CENTER IN THE MUNICIPALITY OF PITALITO, DEPARTMENT OF HUILA.

General Manager

CFM INGENIERIA S.A.S.
01.2015 - 01.2013
  • SIGNALING OF THE ROADS LA PINTADA - MEDELLÍN, LA MANSA - PRIMAVERA AND LA PINTADA - PAÑALISA
  • ROAD IMPROVEMENT AND SIGNALING WORKS ON THE DUITAMA-PAMPLONA -CUCUTA HIGHWAY IN NORTE DE SANTANDER IMPROVEMENT BY MEANS OF SIGNALING WORKS IN THE TRANSVERSAL TRIBUGA - MEDELLIN - ARAUCA - SECTOR BUCARAMANGA – CUESTABOBA IMPROVEMENT BY MEANS OF SIGNALING WORKS ON THE PALMIRA - MEDELLIN - TRONCAL DE OCCIDENTE HIGHWAY, BARRANQUILLA SECTOR AND SIMÓN BOLIVAR BRIDGE RETURNS
  • HORIZONTAL AND VERTICAL SIGNAGE FOR THE MUNICIPAL ROAD SYSTEM DEPARTMENT OF CUNDINAMARCA.

General Manager

CFM INGENIERIA S.A.S.
01.2014 - 01.2012
  • CONSTRUCTION OF SMALL WATER RESERVOIR DAMS FOR THE INDIGENOUS COMMUNITIES OF THE DEPARTMENT OF TOLIMA IMPROVEMENT AND MAINTENANCE OF THE HIGHWAY CROSSING 40 BY MEANS OF THE CONSTRUCTION OF 4 BOX COULVERT AND A 60-METER-LONG BRIDGE IN THE TERRITORIAL DIRECTION META OF INVIAS
  • EMERGENCY CONSTRUCTION OF A POST-TENSIONED CONCRETE BRIDGE OVER THE FUSIRACO STREAM ON THE MENCIPA - CERRO AZUL ROAD, 120 METERS LONG, DEPARTMENT OF CUNDINAMARCA.

Project Manager

CFM INGENIERIA S.A.S.
01.2009 - 12.2010
  • STUDY AND DESIGN OF THE ROAD FOR THE PROTECTION WORKS OF THE SLOPE DUE TO THE EROSION OF THE EL SISGA DAM THROUGH THE DESIGN AND CONSTRUCTION OF A 300 METER LONG SEMI-SUMERGED WALL
  • CONSTRUCTION OF A 280 M LONG VEHICLE BRIDGE, LOCATED IN THE SANTA LUCIA SOUTHWEST, ON THE PUERTO CONCORDIA SANTA LUCÍA - PLAYA ALTA ROAD
  • INSTALLATION OF THE 60-METER-LONG METAL BRIDGE OVER THE ATRATO RIVER.

General Manager

CFM INGENIERIA S.A.S.
01.2013 - 01.2010
  • REHABILITATION AND CONSERVATION OF THE LA PALMICHERA BRIDGE ON THE LANDAZURI - BARBOSA ROAD ROUTE 6208 SANTANDER TERRITORIAL DIRECTION BY MEANS OF THE RECONSTRUCTION OF THE TWO ABUTMENTS AND THE CENTRAL PIER
  • IMPROVEMENT AND MAINTENANCE OF THE HIGHWAY CROSSING 40 BY MEANS OF THE CONSTRUCTION OF 4 BOX COULVERT AND A 60-METER-LONG BRIDGE IN THE TERRITORIAL DIRECTION META OF INVIAS
  • EMERGENCY CONSTRUCTION OF A POST-TENSIONED CONCRETE BRIDGE OVER THE FUSIRACO STREAM ON THE MENCIPA - CERRO AZUL ROAD, 120 METERS LONG, DEPARTMENT OF CUNDINAMARCA
  • IMPROVEMENT AND MAINTENANCE OF ROADS IN THE NORTHERN ZONE GROUP 01 BARBOSA - CISNEROS - PUERTO BERRIO ROAD, BRIDGE OVER THE MAGDALENA RIVER, THROUGH THE CONSTRUCTION OF 360 METERS OF PILES AND CONCRETE WALLS, FOUNDATIONS, AND INFRASTRUCTURE OF A 6O METER BRIDGE, INSTALLATION OF A 60 METER METAL MILITARY BRIDGE, A PRE-STRESSED CONCRETE BRIDGE AND 10,283 SQUARE FEET OF ASPHALT.

General Manager

CFM INGENIERIA S.A.S.
01.2011 - 01.2008
  • REHABILITATION AND CONSERVATION OF THE PERALONSO BRIDGE ON THE CHAPARRAL ORTEGA HIGHWAY, ROUTE 3602 BY REPLACING TWO 45-METER-LONG BEAMS, BUILDING A GABION WALL TO PROTECT AGAINST EROSION AND REPLACING NEOPRENE SUPPORTS
  • CONSTRUCTION OF WORKS FOR THE THIRD STAGE OF THE TINGUA TIBANICA ZONAL PARK IN BOGOTÁ D.C
  • INCLUDING CONSTRUCTION OF SYNTHETIC FUTSAL AND BASKETBALL COURTS AND URBAN FURNITURE
  • EMERGENCY CONSTRUCTION OF A POST-TENSIONED CONCRETE BRIDGE OVER THE FUSIRACO STREAM ON THE MENCIPA - CERRO AZUL ROAD, 120 METERS LONG, DEPARTMENT OF CUNDINAMARCA.

General Manager

CFM INGENIERIA S.A.S.
01.2009 - 01.2006
  • WORKS FOR THE CONSTRUCTION OF PEDESTRIAN BRIDGES LOCATED AT CARRERAS 11, 21 AND 25 OF THE ALTERNATIVE ROADS TO THE PORT OF SANTA MARTA
  • CONSTRUCTION OF THE SECOND STAGE OF THE IMPROVEMENT OF THE PUBLIC SPACE AND URBAN ENVIRONMENT IN THE MUNICIPALITY OF SARAVENA, DEPARTMENT OF ARAUCA, THROUGH THE CONSTRUCTION OF 3,500 SQUARE FEET OF SIDEWALKS, ELECTRICAL INSTALLATIONS, LIGHTING AND SEWERAGE
  • CONSTRUCTION OF THE IMPROVEMENT OF THE MUNICIPAL ROADS TO PUERTO OLIVO, SAN VICENTE, LA SULTANA, LA HERRADURA, LA VENADA, CAÑO LA RAYA, CAMPO ALEGRE, BY MEANS OF 35 BOX COULVERT AND 2,500 ML OF DITCHES.

General Manager

CFM INGENIERIA S.A.S.
01.2007 - 01.2004
  • CONSTRUCTION OF A VEHICULAR BRIDGE OF 87 M LENGTH, LOCATED IN THE CASUARITO TRAIL, DEPARTMENT OF VICHADA
  • CONSTRUCTION OF MINOR ROAD WORKS SUCH AS SEWERS, DINS, CURBS AND EMBANKMENTS ON VIA CURILLO, DEPARTMENT OF CAQUETA
  • CONSTRUCTION OF A VEHICULAR BRIDGE 88 M LONG, LOCATED ON VIA CURILLO-SALAMINA, CURILLO MUNICIPALITY, DEPARTMENT OF CAQUETA.

General Manager

CFM INGENIERIA S.A.S.
01.2005 - 01.2002
  • CONSTRUCTION OF THE BRIDGE OVER THE QUEBRADA CEIBAL, MUNICIPALITY OF ANSERMA, DEPARTMENT OF CALDAS COPN A LENGTH OF 73 METERS
  • PAVEMENT OF THE CIRCUNVALAR VOLCAN GALERAS WITH A LENGTH OF 13 KILOMETERS IN THE DEPARTMENT OF NARIÑO
  • IMPROVEMENT OF THE ORRAPIHUASI-FLORENCIA HIGHWAY, ROUTE 20, WITH THE CONSTRUCTION OF A 125-METER-LONG WALL ON PILES 12.5 METER DEEP.

General Manager

CFM INGENIERIA S.A.S.
01.2003 - 01.2000
  • CONSERVATION OF THE GUAMUEZ BRIDGE OF THE SANTA ANA HIGHWAY SAN MIGUEL INTERNATIONAL BRIDGE
  • ROUTE 4501 WITH THE REPLACEMENT OF STIRRUPS AND 4 METAL BEAMS
  • ATTENTION EMERGENCY WORKS OF THE LA LEJIA - SARAVENA ROAD BRIDGE THROUGH THE CONSTRUCTION OF WALLS FOR PROTECTION FROM EROSION.

Education

International Education Consultants, Josef Silny & Asociatess, Inc. (Miami, Florida) Report of Evaluation of Educational Credentials, the consultant has the equivalent of the U.S. degree of Bachelor of Science in Civil Engineering earned at an FBPE approved program at a regionally accredited institution of higher education in the United States. -

01.2022

(Bogotá, Colombia) Graduate Degree in Quality Management Systems, Fundación Agraria de Colombia. (ISO 9000) -

01.2005

(Bogotá, Colombia) Civil Engineer Degree, Universidad Católica de Colombia -

01.2000

Skills

  • Construction Management in accelerated, reinforced, prestress, and post-tensioned concrete
  • Infrastructure Management
  • Erosion Control in slopes and roadways
  • Construction Site Management
  • Scheduling, budgeting, management, and control of construction projects
  • Proficiency in Stell Construction
  • CAD Drafting
  • Technical Reports
  • Staff Management
  • Cement and Pavement

References

REFERENCES AVAILABLE UPON REQUEST

Timeline

General Manager

CFM INGENIERIA S.A.S.
06.2019 - 12.2021

General Manager

CFM INGENIERIA S.A.S.
06.2019 - 10.2020

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 12.2022

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 12.2020

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 01.2018

General Manager

CFM INGENIERIA S.A.S.
01.2019 - 01.2018

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 03.2019

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 01.2017

General Manager

CFM INGENIERIA S.A.S.
01.2018 - 01.2016

General Manager

CFM INGENIERIA S.A.S.
01.2016 - 01.2014

General Manager

CFM INGENIERIA S.A.S.
01.2015 - 01.2013

General Manager

CFM INGENIERIA S.A.S.
01.2014 - 01.2012

General Manager

CFM INGENIERIA S.A.S.
01.2013 - 01.2010

General Manager

CFM INGENIERIA S.A.S.
01.2011 - 01.2008

Project Manager

CFM INGENIERIA S.A.S.
01.2009 - 12.2010

General Manager

CFM INGENIERIA S.A.S.
01.2009 - 01.2006

General Manager

CFM INGENIERIA S.A.S.
01.2007 - 01.2004

General Manager

CFM INGENIERIA S.A.S.
01.2005 - 01.2002

General Manager

CFM INGENIERIA S.A.S.
01.2003 - 01.2000

International Education Consultants, Josef Silny & Asociatess, Inc. (Miami, Florida) Report of Evaluation of Educational Credentials, the consultant has the equivalent of the U.S. degree of Bachelor of Science in Civil Engineering earned at an FBPE approved program at a regionally accredited institution of higher education in the United States. -

(Bogotá, Colombia) Graduate Degree in Quality Management Systems, Fundación Agraria de Colombia. (ISO 9000) -

(Bogotá, Colombia) Civil Engineer Degree, Universidad Católica de Colombia -

CARLOS MEDINA