Working in Bore crew as mini operator and labor splicing pipe inner duct tie-ins / trenching 5 to 10 feet deep to install inner duct in ground and back filling / hydro back to find utilities such as power - gas - phone services and other utilities mark in ground / hauling trailer with company rig as 3500 trucks hauling hydro vac and also mini excavator or utility trailer hauling material moving dirt with dump trailer to another location / digging with shovels make bore pit when machinery not around 6 x 6 feet square hole changing reamer on bore head connecting pipe to head making adjustment as pulling back
Started as crane operator picking up pipe so they can weld in into place in the air set it up on insulators installing high beams any type material needed air / trenching with mini or shovel to install all new cable and be able Cad weld ground cable to ground rods make whole substation pad back fill / install inner duct for pvc pipe all around substation to be able run cable into house to circuit boxes / drilling 12-18 feet down with auger to be able set foundations forms and anchor bolts pour concrete for transformer path or switches / using man lift be able perform work in air such as adjusting pipe or installing new insulator putting new hard ware and torquing them to specs / cutting aluminum pipe for aluminum welders just weld / unloading material of trailer with skidsteers using forks or moving dirt with shovel material to heavy unload it with skytrack forklift /
Crane operator / drilling holes for foundations installing foundation forms pouring concrete / working in heights with transmission crews installing new wire and clipping and sag wire to specs installing insulators / using dozer set up paths for wire crew set their machinery for pulls / moving machinery with trailer and hauling material to job site to another job site in another state / do time sheets to progress reports for job being able fill out Jha / use digger Derrick to install wooden poles or using pick up material from trailer to another / use bucket truck perform air 80-140 feet in air /