Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
Carlos Francisco Guadalupe  Sanchez Gonzalez

Carlos Francisco Guadalupe Sanchez Gonzalez

Reynosa ,Tamaulipas

Summary

Efficient Industrial Engineer with experience collaborating with employers, employees and regulators.
Background successfully executing diverse project tasks to meet deadlines. Highly skilled at communicating with colleagues, monitoring status and achieving key milestones. Enthusiastic problem solver and talented team player with superior planning and decision-making skills. Professional Continuous Successful in identifying problems to develop targeted solutions and implement employee training using lean principles. Focused on developing value stream mapping to analyze production and improve workflow processes. Expert in identifying risks and developing solutions that reduce chances of potential issues.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Production Engineer

Copeland
01.2022 - Current
  • Increased production capacity to meet growing market demands, upgrading equipment, and streamlining processes.
  • Implemented standardized work instructions, enhancing operator understanding of critical tasks and improving workflow consistency.
  • Streamlined workflows to reduce bottlenecks and improve overall productivity rates.
  • Provided technical support to troubleshoot equipment issues, minimizing downtime and maintaining production targets.
  • Implemented process improvements based on Lean Six Sigma methodologies, resulting in reduced waste and increased efficiency.
  • Reduced equipment downtime by performing regular maintenance checks and addressing issues promptly.
  • Participated in safety audits, ensuring a secure working environment for all employees.
  • Conducted root cause analyses to identify areas for improvement and implemented corrective actions accordingly.
  • Ensured compliance with OSHA, NFPA, NOM and other regulatory requirements through regular audits and inspections.
  • Supported new product development efforts through scale-up activities from pilot-scale testing to full-scale production implementation.
  • Optimized manufacturing processes by implementing continuous improvement initiatives and lean methodologies.
  • Performed energy audits on manufacturing processes to optimize resource consumption levels.
  • Performed regular audits of critical equipment ensuring compliance with established maintenance protocols mitigating risks associated with unexpected breakdowns or shutdowns.
  • Supervised a team of technicians, providing guidance on complex repair tasks and fostering professional development opportunities.



Lecturer, Engineering

Instituto Tecnologico De Reynosa
01.2016 - Current
  • Contributed to departmental meetings by sharing insights on effective teaching strategies and proposing solutions for addressing common challenges faced by faculty members.
  • Implemented differentiated instruction methods to accommodate diverse student learning styles.
  • Developed strong relationships with colleagues, collaborating on curriculum development and sharing best practices in teaching strategies.
  • Increased student interest by incorporating real-world examples into lessons and connecting material to relevant experiences.
  • Industrial engineering specialty subjects.

Production Control Analyst

Nissan Mexicana Planta Aguascalientes
06.2018 - 12.2022
  • Ensured accurate documentation of production activities, facilitating effective communication among team members and stakeholders.
  • Evaluated vendor performance on a regular basis, identifying opportunities for enhanced service delivery or cost savings through supplier negotiations or alternative sourcing strategies.
  • Served as a subject matter expert within the production control function, providing guidance and support to colleagues in their own professional development efforts.
  • Managed resources effectively to support high levels of productivity while minimizing costs.
  • Negotiated contracts with suppliers for cost-effective procurement of materials and services essential to projects'' success.
  • Maintained open lines communication between internal external stakeholders ensure alignment project objectives mitigate potential conflicts.
  • Coordinated testing protocols for new model prototypes to validate functionality, safety standards compliance, refine designs before mass production.
  • Developed detailed project plans, outlining scope, resources, timelines, and milestones to guide team execution.
  • Championed change management initiatives to help team members adapt smoothly during transitional phases or major process improvements.
  • Collaborated with engineering, design, and marketing departments for comprehensive product strategies and cohesive brand messaging.
  • Increased project efficiency by streamlining communication channels and implementing agile methodologies.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.
  • Optimized inventory management by implementing just-in-time purchasing strategies, reducing stock holding costs without compromising on availability.
  • Improved supplier relationships through regular communication and collaboration, enhancing overall service quality.
  • Evaluated vendor performance using key performance indicators to ensure continuous improvement in service delivery.
  • Implemented cost-saving initiatives within the procurement department that significantly reduced overhead expenses.
  • Maintained ongoing communication with suppliers to promote workflow and respond to inquiries.
  • Oversaw inventory control, accounting, and supply reports.
  • Coordinate engineering change with ANPQP process.

Manufacturing Engineer

Motores Hermeticos De Reynosa
03.2016 - 05.2018
  • Contributed to achieving safety targets by proactively addressing potential hazards and promoting a strong safety culture throughout the facility.
  • Implemented cost-saving measures by identifying opportunities for reducing material waste in the production process.
  • Played an active role in the development of new manufacturing facilities, providing input on equipment selection, layout design, and capacity planning.
  • Trained and mentored junior engineers, fostering a culture of continuous learning and professional development within the team.
  • Led process improvement projects that resulted in substantial reduction of waste materials during production runs.
  • Conducted time studies for various manufacturing processes, optimizing workstations and reducing cycle times.
  • Optimized production processes by implementing lean manufacturing techniques.
  • Ensured compliance with OSHA, NFPA,NOM and other regulatory requirements through regular audits and inspections.

New Model Project Lead

Fujitsu Ten De Mexico
11.2014 - 09.2015
  • Facilitated workshops with multidisciplinary teams focused on innovative solutions addressing unique challenges faced during new model development.
  • Reduced time-to-market for new models by optimizing processes and leveraging industry best practices.
  • Delivered regular progress reports to stakeholders, ensuring transparency in project performance metrics and decision-making processes.
  • Coordinated testing protocols for new model prototypes to validate functionality, safety standards compliance, refine designs before mass production.
  • Developed detailed project plans, outlining scope, resources, timelines, and milestones to guide team execution.
  • Collaborated with engineering, design, and marketing departments for comprehensive product strategies and cohesive brand messaging.
  • APQP member for perfect launch of new models.


Internship Student

Cinch Connector
08.2013 - 03.2014
  • Maintenance project for ACME machine in McAllen Tx, to improve the uptime.
  • Enhanced team productivity by effectively collaborating on projects and contributing innovative ideas.
  • Gained practical experience in various aspects of the field, applying academic knowledge to real-world situations.
  • Aided department heads in organizing events or meetings, showcasing excellent organizational skills beyond regular duties.
  • Demonstrated adaptability by quickly learning new concepts and techniques as required for different assignments within the program.

Education

Engineering - Industrial Engineering

Instituto Tecnologico De Reynosa
Reynosa Tamaulipas
08.2013

Technician - Mechatronics

CBTis 7
Reynosa Tamaulipas
07.2009

Technician - Computation

Secundaria Tecnica 74
Reynosa Tamaulipas
07.2006

Skills

  • Team Collaboration
  • Configuration Management
  • Product Documentation
  • Workflow Streamlining
  • Root Cause Analysis
  • Writing and verbal communication
  • Supply chain planning
  • Configuration and Troubleshooting
  • Specification Review
  • Analytical Thinking

Certification

  • Certified Green Belt
  • Certified - ANPQP
  • Certified Fanuc Handling Tool Operation & Programming.

Languages

English
Professional Working

Timeline

Production Engineer

Copeland
01.2022 - Current

Production Control Analyst

Nissan Mexicana Planta Aguascalientes
06.2018 - 12.2022

Manufacturing Engineer

Motores Hermeticos De Reynosa
03.2016 - 05.2018

Lecturer, Engineering

Instituto Tecnologico De Reynosa
01.2016 - Current

New Model Project Lead

Fujitsu Ten De Mexico
11.2014 - 09.2015

Internship Student

Cinch Connector
08.2013 - 03.2014

Engineering - Industrial Engineering

Instituto Tecnologico De Reynosa

Technician - Mechatronics

CBTis 7

Technician - Computation

Secundaria Tecnica 74
Carlos Francisco Guadalupe Sanchez Gonzalez