Summary
Overview
Work History
Education
Skills
Timeline
Generic

Patrick Cavatta

Troy,NY

Summary

Reliable Labor Worker comfortable handling physically demanding tasks across long shifts and through problematic weather conditions. Proven resourcefulness and handling of difficult labor projects. Juggles multiple tasks to keep assignment timelines on schedule. Established reputation for punctuality and dedicated work ethic.

Overview

18
18
years of professional experience
2006
2006
years of post-secondary education

Work History

Laborer

Blanchard Construction
Troy, NY
07.2025 - 11.2025
  • Assisted in demolition and removal of old structures safely.
  • Operated power tools and equipment for various remodeling tasks.
  • Collaborated with team members to ensure timely project completion.
  • Assisted with basic maintenance tasks such as sweeping, mopping, painting, and cleaning.

Laborer

Mdt Personnel
Schenectady, New York
01.2014 - 07.2016
  • Assisted in demolition and removal of old structures safely.
  • Followed safety protocols to maintain a secure work environment.
  • Maintained tools and equipment in good working condition for optimal performance.
  • Performed physical activities requiring heavy lifting, walking and standing for long periods of time.
  • Completed variety of physical labor tasks.
  • Cleaned work area after job completion ensuring all debris is properly disposed of.
  • Assisted with basic maintenance tasks such as sweeping, mopping, painting, and cleaning.

Laborer

Cutting Edge Remodeling
Latham, New York
01.2008 - 01.2014
  • Assisted in demolition and removal of old structures safely.
  • Operated power tools and equipment for various remodeling tasks.
  • Collaborated with team members to ensure timely project completion.
  • Installed fixtures and finishes according to project specifications.

Education

Shaker High School
Latham, NY

Skills

  • Power tool operation
  • Safety protocol adherence
  • Heavy lifting
  • Team collaboration
  • Attention to detail
  • Painting
  • Caulking and sealing
  • Landscaping
  • Plumbing installation

Timeline

Laborer

Blanchard Construction
07.2025 - 11.2025

Laborer

Mdt Personnel
01.2014 - 07.2016

Laborer

Cutting Edge Remodeling
01.2008 - 01.2014

Shaker High School
Patrick Cavatta