Skilled in overseeing construction trades and production work with solid background in coordinating diverse teams and managing projects from inception to completion. Possess strong leadership abilities, effective communication skills, and capacity to solve problems efficiently. Improved workflow and team coordination on multiple projects, enhancing project completion rates and quality of work. Demonstrated adaptability to changing industry trends and technologies, ensuring project specifications are met with precision.
Overview
24
24
years of professional experience
Work History
Structural General Foreman
Fincantieri Marinette Marine
Marinette, Wi
02.2023 - 04.2024
Managed 200+ production employees
12 Production Foreman
Oversaw 3 different navy programs (Frigate, MSC, LCS)
Assigned and monitored work assignments of crew and foreman, accessing physical progress on a daily basis.
Challenged the crew and foremen daily, sets clear performance goals, objectives, and expectations.
Cleared obstacles that are affecting performance.
Entered labor charges into payroll system daily.
Managed work orders and reports accurate progress to planning.
Took ownership of parts and manages materials assigned to your work orders.
Monitored and reported on performance metrics to the Area Manager/Directors.
Worked with planning in production control projects to move work to the appropriate SOC.
Planned overtime and schedules resources to support.
Completes Safety Observations weekly.
Understood and worked within the CBA (Collective Bargaining Agreement), worked closely with the Foreman to assure uniform understanding.
Resolved disputes, misunderstandings, enforces policy, and disciplines as appropriate.
Overall Safety, Cost Productivity, and Schedule Performance.
Built trust and unit cohesion through honesty, fairness, and respect.
A servant leader to the crew and foremen under them.
Evaluating skill sets and defining training needs necessary to grow the crew and foremen competence.
Maintaining strict discipline and adherence to safety and security policies.
Enforcing all company policies and work rules.
Following all company Work Instructions and SOP (Standard Operating Procedures).
Drives lean manufacturing and 5S principles to improve productivity and performance.
Mechanical Assembler
Collins Aerospace
Foley, Al
09.2022 - 02.2023
Assembled products by reading blueprints and work instructions, including the use of measuring devices (scales, calipers, etc.). With minimal supervision.
Kept accurate records of parts used during each assembly task.
Assisted in training new employees on the proper use of tools and equipment related to their job duties.
Performed sheet metal riveting functions using hand tools such as a rivet gun, shaver, rivet squeeze, hand clamps, bucking bars, drill press, pneumatic drill, and specialized features to build sub-assemblies.
Tracked and received the required parts for the product area.
Checked stock bins for adequate supplies of sub-assemblies, parts, and fasteners for the particular run.
Contacted material handler or lead if shortages exist or incorrect parts are in bins.
Packed finished product into designated carton.
Performed necessary tasks to ensure on-time delivery of the product.
Cross-trained and worked in all areas of the assembly operation.
Looked for ways to eliminate safety hazards and improve the overall safety of the workplace.
Provided continuous improvement ideas in order to support lean and ACE initiatives.
Performed other job duties as required and available for overtime, as necessary.
Worked cooperatively with team members to complete tasks efficiently within established deadlines.
Owner
G&G Home Solutions
Daphne, AL
01.2020 - 09.2022
Managed daily operations of business, including hiring and training staff.
Developed strategic plans to increase profitability and efficiency.
Oversaw budgeting and financial management.
Maintained relationships with existing clients by providing superior customer service.
Implemented quality assurance processes to ensure product excellence.
Organized events such as trade shows and conferences.
Ensured compliance with local, state, and federal regulations.
Developed policies and procedures for the organization.
Provided direction and guidance to employees.
Supervised performance of workers with goals of improving productivity, efficiency and cost savings.
Completed thorough opening, closing, and shift change functions to maintain operational standards each day.
Prepared staff work schedules and assigned team members to specific duties.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Monitored inventory levels and placed new orders for merchandise to keep supply well-stocked.
Formed and sustained strategic relationships with clients.
Monitored progress by establishing plans, budgets and measuring results.
Fabrication Foreman
Austal USA
Mobile, Al
05.2016 - 01.2020
Managed 130+ production employees
8 Production Supervisors
Oversaw day to day operation of multiple Navy programs (LCS, EPF)
Responsible for the implementation of all production schedules, monitoring, and maintenance of schedules in conjunction with supervisors.
Responsible for monitoring and maintaining adequate stock levels.
Ensured adherence to established construction procedures.
Responsible for sourcing and distributing information to supervisors.
Responsible for liaising with and directing contractors.
Accountable for monitoring resource levels and ensuring distribution of resources to meet production levels.
In conjunction with production management at all levels, ensures safe working practices and good housekeeping are maintained in all areas, and ensures Austal's policies and procedures are followed.
Accountable for ensuring all Supervisors under their control are complying with the Ten Fundamental Rules of Supervision and the Leadership Creed.
Provided proactive and consistent feedback to supervisors regarding quality, cost, delivery, safety, and morale.
Ensured all time charges are processed and allocated daily.
Ensured that company policies and procedures are understood and followed.
Ensured a positive work environment is maintained and provided supervisors and crew under their direction with appropriate motivation. Maintains positive morale and minimizes confrontation among the crew.
Maintained succession plan.
Identified key personnel and implemented training programs.
Conducted random surveys and re-inspections to ensure that all aspects of the area are complete and ready for a survey call-out.
Ensured accuracy of blueprints and drawings to ensure quality fabrication.
Conducted regular meetings with staff to discuss job performance and address any issues that may arise during fabrication processes.
Analyzed cost estimates for each project ensuring they were accurate and competitively priced.
Fabrication Supervisor
Austal USA
Mobile, Al
06.2014 - 05.2016
Ensured working environment is conducive to worker comfort and safety.
Set and monitored time goals for all tasks.
Monitored work performance of staff daily and undertake assessments as required.
Enhanced and encourage skill development of staff.
Monitored timekeeping and verify hours.
Encouraged effective communication and flexibility within the team, and gain an understanding of their needs and problems.
Ensured on-the-job training and instruction are provided for trainees and apprentices.
Ensure on-the-job training and instruction are provided for trainees and apprentices.
Provided feedback to Foreman on performance and recruitment requirements.
Provided constant feedback to the foreman regarding quality, cost, delivery, safety, and morale.
Planned material requirements.
Generated requisitions for Foreman's approval to be obtained from the stock yard.
Ensured the economic use of materials and consumables to meet targets of quality and material elimination.
Controlled and maintain records of company equipment and machinery under their control.
Ensured regular maintenance of company equipment and machinery is undertaken in conjunction with the relevant department.
Ensured that a safe working environment is maintained.
Attended to injuries of staff, and follow up with necessary paperwork.
Housekeeping
Ensured your team's housekeeping is maintained and promoted.
Quality Control.
Inspected work and ensure quality is maintained during all phases of work.
Inspected and sign off on all completed work.
Implemented and maintain quality standards, check sheets, and procedures.
Ensured company policies and procedures are understood and adhered to.
Identified and record problems, and initiate or recommend corrective action to your coordinator.
Planned future work.
Provided input for production schedules and provide weekly updates.
Actively planned and implemented production improvements.
Ensured every effort is made to reach agreed milestone dates.
Construction Carpenter
Heaton Home Builders
Bay Minette, AL
03.2013 - 06.2014
Followed established safety rules and regulations.
Verified trueness of structure using plumb bobs and levels.
Shape or cut material to specified measurements using hand tools or appropriate equipment.
Studied the specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.
Assemble and fasten materials to make framework or props, using hand tools, screws, nails, dowel pins, or glue.
Erected scaffolding and ladders for assembling structures above the ground level.
Removed damaged or defective parts or sections of structures and repair or replace, using hand tools.
Installed structure and fixtures, such as windows, frames, flooring, and trim or hardware, using carpenter's tools.
Installed cabinetry, trim, and other fixtures to complete carpentry projects.
Measured, cut and installed drywall, plywood and other materials for interior walls and ceilings.
Assembled scaffolding to provide safe access to elevated work areas.
Constructed forms for pouring concrete footings and foundations.
Built wooden structures such as framing, flooring, stairs and railings.
Performed rough-in carpentry tasks including installation of windows, doors, siding and roofing components.
Maintained a clean worksite by safely disposing of debris and waste materials during the course of each job.
Utilized power tools such as saws, drills, routers and sanders in order to shape raw materials into finished products.
Assisted with the layout of building projects using levels and measuring tapes accurately.
Fabrication Foreman
Austal USA
Mobile, Al
10.2011 - 03.2013
Managed 130+ production employees
8 Production Supervisors
Oversaw day to day operation of multiple Navy programs (LCS, EPF)
Responsible for the implementation of all production schedules, monitoring, and maintenance of schedules in conjunction with supervisors.
Responsible for monitoring and maintaining adequate stock levels.
Ensured adherence to established construction procedures.
Responsible for sourcing and distributing information to supervisors.
Responsible for liaising with and directing contractors.
Accountable for monitoring resource levels and ensuring distribution of resources to meet production levels.
In conjunction with production management at all levels, ensures safe working practices and good housekeeping are maintained in all areas, and ensures Austal's policies and procedures are followed.
Accountable for ensuring all Supervisors under their control are complying with the Ten Fundamental Rules of Supervision and the Leadership Creed.
Provided proactive and consistent feedback to supervisors regarding quality, cost, delivery, safety, and morale.
Ensured all time charges are processed and allocated daily.
Ensured that company policies and procedures are understood and followed.
Ensured a positive work environment is maintained and provided supervisors and crew under their direction with appropriate motivation. Maintains positive morale and minimizes confrontation among the crew.
Maintained succession plan.
Identified key personnel and implemented training programs.
Conducted random surveys and re-inspections to ensure that all aspects of the area are complete and ready for a survey call-out.
Ensured accuracy of blueprints and drawings to ensure quality fabrication.
Conducted regular meetings with staff to discuss job performance and address any issues that may arise during fabrication processes.
Analyzed cost estimates for each project ensuring they were accurate and competitively priced.
Fabrication Supervisor
Austal USA
Mobile, Al
08.2010 - 10.2011
Ensured working environment is conducive to worker comfort and safety.
Set and monitor time goals for all tasks
Monitored work performance of staff daily and undertook assessments as required.
Enhanced and encouraged skill development of staff.
Monitor timekeeping and verify hours
Encouraged effective communications and flexibility within the team, and gained an understanding of their needs and problems.
Provide motivation, maintain a high level of morale, and minimize confrontation.
Ensured on-the-job training and instruction are provided for trainees and apprentices.
Provided feedback to Foreman on performance and recruitment requirements.
Provided constant feedback to the foreman regarding quality, cost, delivery, safety, and morale.
Planned material requirements
Generated requisitions for Foreman's approval to be obtained from the stock yard.
Ensured the economic use of materials and consumables to meet targets of quality and material elimination
Controlled and maintained records of company equipment and machinery under their control
Ensured regular maintenance of company equipment and machinery is undertaken in conjunction with the relevant Department
Ensured a safe working environment is maintained
Attended to injuries of staff and follow up with necessary paperwork
Housekeeping
Ensured your team’s housekeeping is maintained and promoted
Quality Control
Inspected work and ensure quality is maintained during all phases of work
Inspected and sign off all completed work
Implemented and maintained quality standards, check sheets and procedures
Ensured company policies and procedures are understood and adhered to
Identify and record problems, and initiate or recommend corrective action to your coordinator.ator
Plan future work
Provided input for production schedules and provide weekly updates
Actively planned and implemented production improvements.
Ensured every effort is made to reach agreed milestone dates
1st Class Fitter
Austal USA
Mobile, Al
02.2010 - 08.2010
Understood directions and followed instructions.
Maintained cleanliness and organization on assigned job sites.
Accountable for completion of daily work assignments, including the completion and signatures for work completion and quality.
Performed basic layout of plates, materials, and weldments using basic engineering sketches, drawings, and diagrams with minimal supervision.
Performed ship fitting functions, such as, but not limited to, fitting up of structure, cutting, sniping, sanding, grinding, prepping, tacking, and the fitting up of plates, with minimum supervision.
Performed fitting operations with limited supervision using standard ship fitting equipment to accomplish fabrication and ship repair duties.
Obtained GMAW ABS 'B' Class Weld Certification for aluminum applications.
Performed safe and effective use of craft-related tools and equipment, including, but not limited to: millers, sanders, grinders, burr motors, band saws, skill saws, saws all, come along, and chain falls, etc.
Interprets job specifications and performs work on marine vessels.
Monitored working environment for compliance with quality, safety, environmental, and health regulations.
Assigned to work any shift.
Assigned tasks outside craft, as required.
Complied with the Company's 'Equal Opportunity and Anti-Harassment'.
Repaired and replaced defective parts to restore machinery to working order.
Construction Carpenter
Heaton Home Builders
Bay Minette, AL
05.2000 - 02.2010
Followed established safety rules and regulations.
Verified trueness of structure using plumb bobs and levels.
Shape or cut material to specified measurements using hand tools or appropriate equipment.
Studied the specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.
Assemble and fasten materials to make framework or props, using hand tools, screws, nails, dowel pins, or glue.
Erected scaffolding and ladders for assembling structures above the ground level.
Removed damaged or defective parts or sections of structures and repair or replace, using hand tools.
Installed structure and fixtures, such as windows, frames, flooring, and trim or hardware, using carpenter's tools.
Installed cabinetry, trim, and other fixtures to complete carpentry projects.
Measured, cut and installed drywall, plywood and other materials for interior walls and ceilings.
Assembled scaffolding to provide safe access to elevated work areas.
Constructed forms for pouring concrete footings and foundations.
Built wooden structures such as framing, flooring, stairs and railings.
Performed rough-in carpentry tasks including installation of windows, doors, siding and roofing components.
Maintained a clean worksite by safely disposing of debris and waste materials during the course of each job.
Utilized power tools such as saws, drills, routers and sanders in order to shape raw materials into finished products.
Assisted with the layout of building projects using levels and measuring tapes accurately.
Education
High School Diploma -
Open Door Christian
01.2000
Skills
Project Management
Strategic Planning
Safety Compliance
Troubleshooting abilities
Blueprint Reading
Team leadership skills
Managing supplies
Training and mentoring
Subcontractor Management
References
Ronnie Sims, 251-228-2407
James Sellers, 251-644-8662
Timeline
Structural General Foreman
Fincantieri Marinette Marine
02.2023 - 04.2024
Mechanical Assembler
Collins Aerospace
09.2022 - 02.2023
Owner
G&G Home Solutions
01.2020 - 09.2022
Fabrication Foreman
Austal USA
05.2016 - 01.2020
Fabrication Supervisor
Austal USA
06.2014 - 05.2016
Construction Carpenter
Heaton Home Builders
03.2013 - 06.2014
Fabrication Foreman
Austal USA
10.2011 - 03.2013
Fabrication Supervisor
Austal USA
08.2010 - 10.2011
1st Class Fitter
Austal USA
02.2010 - 08.2010
Construction Carpenter
Heaton Home Builders
05.2000 - 02.2010
High School Diploma -
Open Door Christian
Similar Profiles
Bryce AndreBryce Andre
EHS Specialist at Fincantieri Marinette MarineEHS Specialist at Fincantieri Marinette Marine