Year and place : December 2019, Kinshasa, DR Congo.
Customer: Financing execution unit for fragile states / Ministry of Finance.
Main features of the project: Development of zones for primary product processing and structuring industries,
which form the basis for social and economic progress in this corner of the Republic.
Position: Surveying Engineer.
Activities: Surveys of the work site.
Year and place: July 2018 to June 2019, Kinshasa, DR Congo.
Customer: Urban Development Program / Ministry of Urban Planning and Housing.
Main features of the project: The services are divided into various tasks relating to:(i) preliminary studies to determine a plan
to reduce the risks of flooding and erosion, in particular the development plans for the gullies and
the drainage plan for the area;(ii) preliminary design; then(iii) detailed design and preparation
of the tender documents.
Position: Surveying Engineer.
Activities: Surveys of the work site.
Year and place: September 2018 to March 2019, Kinshasa, DR Congo.
Customer: Urban Development Program / Ministry of Urban Planning and Housing.
Main features of the project: To help improve the living conditions and environment of the population of 8 communes
in the city of Kinshasa through integrated management of household and similar waste.
Position: Surveying Engineer.
Activities: Surveys of the work site.
Year and place: March 2019 to July 2019, Kinshasa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Design of a ND 1400mm- ND 1000mm- ND 900mm- ND 800mm delivery pipeline to improve drinking
water supply to the Makala reservoir and the Yolo booster station.
Position: Surveying Engineer.
Activities: Surveys of the work site.
Year and place: April 2019 to November 2019, Kinshasa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Rehabilitation of the ND 200mm Gombele-CNPP force main; ND 800mm avenue Kikwit,
ND 400mm and ND 350mm Elengesa, Ndjoku, Salongo and Kasa-vubu.
Position: Surveying Engineer.
Activities: Control mission.
Year and place: October 2016 to December 2016, Kinshasa, Kwango, Kwilu and Kasai, RD Congo.
Customer: LOUIS BERGER SAS.
Main features of the project: Connection of the railway network in the western and central zones of the DRC.
Position: Surveying Engineer.
Activities: Creation of a geodesic survey network and installation of control points.
Year and place: September 2015 to October 2015, Kinshasa, DR Congo.
Customer: Governorate of the city of Kinshasa.
Main features of the project: interconnecting neighborhoods II and III in the commune of Masina.
Position: Surveying Engineer.
Activities: Engineer in charge of topographic studies.
Year and place: May 2015 to Jully 2015, Kinshasa, DR Congo.
Customer: Governorate of the Province of North Kivu.
Main features of the project: Rehabilitation of the primary and secondary road network in North Kivu Province.
Position: Surveying Engineer.
Activities: Engineer in charge of topographic studies.
Year and place: February 2015 to May 2015, Tshikapa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Supply of generators to supply the raw water collection and treatment site for Regideso's facilities.
Position: Engineer Site manager.
Activities: Coordination of work and layout of civil structures.
Year and place: June 2014 to September 2014, Kikwit, DR Congo.
Customer: Urban Development Program/Ministry of Urban Planning and Housing.
Main features of the project: Construction of paved secondary roads and a drainage network in the town of Kikwit.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
(KP 7 + 475 to KP 8 + 615) on Liberation's avenue in Kinshasa.
Year and place: March 2014 to June 2014, Kinshasa, DR Congo.
Customer: Infrastructure Unit/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Construction of gutters along Avenue de la Liberation to drain water from
the Sanatorium hill catchment area.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
Year and place: February 2012 to October 2012, Kinshasa, DR Congo.
Customer: Cellule des Infrastructures/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Construction of a collector along Liberation's avenue to collect runoff from the Selembao market
and rehabilitation of the stretch of road between makala prison and the Selembao market.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
Year and place: February 2011 to December 2011, Mbandaka, DR Congo.
Customer: DRC government
Main features of the project: Rehabilitation of road infrastructure and drainage network in the city of Mbandaka.
Position: Surveying Engineer.
Activities: Engineer in charge of studies and rebuilding the roadway.
Year and place: February 2009 to January 2011, Kinshasa, DR Congo.
Customer: Cellule des Infrastructures/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Total reconstruction of Avenue Liberation and erosion control at Kitoki Mosi.
Position: Surveying engineer.
Activities: Engineer in charge of rebuilding the roadway and drainage.
Year and place: September 2009 to June 2010, Kinshasa, DR Congo.
Customer: Roads Office.
Main features of the project: Anti-erosion control of the Kingu site and construction of a hydraulic network to drain water from
the Kingu and Ngomba-Kinkusa neighborhood.
Position: Surveying engineer.
Activities: Engineer in charge of rebuilding the roadway and drainage.
Total Station Operation
Field data collection
Data Analysis
Topographic mapping
Global Positioning System
GPS knowledge
Land surveying
AutoCAD proficiency
Engineering Design
Year and place : December 2019, Kinshasa, DR Congo.
Customer: Financing execution unit for fragile states / Ministry of Finance.
Main features of the project: Development of zones for primary product processing and structuring industries,
which form the basis for social and economic progress in this corner of the Republic.
Position: Surveying Engineer.
Activities: Surveys of the work site.
as part of the Kinshasa Urban development and Resilience Project.
Year and place: July 2018 to June 2019, Kinshasa, DR Congo.
Customer: Urban Development Program / Ministry of Urban Planning and Housing.
Main features of the project: The services are divided into various tasks relating to:(i) preliminary studies to determine a plan
to reduce the risks of flooding and erosion, in particular the development plans for the gullies and
the drainage plan for the area;(ii) preliminary design; then(iii) detailed design and preparation
of the tender documents.
Position: Surveying Engineer.
Activities: Surveys of the work site.
and Matete, as well as the preliminary diagnosis of the Mpasa technical landfill center as part of the urban development
and resilience project for the city of Kinshasa.
Year and place: September 2018 to March 2019, Kinshasa, DR Congo.
Customer: Urban Development Program / Ministry of Urban Planning and Housing.
Main features of the project: To help improve the living conditions and environment of the population of 8 communes
in the city of Kinshasa through integrated management of household and similar waste.
Position: Surveying Engineer.
Activities: Surveys of the work site.
the city of Kinshasa.
Year and place: March 2019 to July 2019, Kinshasa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Design of a ND 1400mm- ND 1000mm- ND 900mm- ND 800mm delivery pipeline to improve drinking
water supply to the Makala reservoir and the Yolo booster station.
Position: Surveying Engineer.
Activities: Surveys of the work site.
at Kikwit, Ndjoku, Elengesa, Kasa-vubu and Salongo avenues.
Year and place: April 2019 to November 2019, Kinshasa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Rehabilitation of the ND 200mm Gombele-CNPP force main; ND 800mm avenue Kikwit,
ND 400mm and ND 350mm Elengesa, Ndjoku, Salongo and Kasa-vubu.
Position: Surveying Engineer.
Activities: Control mission.
Year and place: October 2016 to December 2016, Kinshasa, Kwango, Kwilu and Kasai, RD Congo.
Customer: LOUIS BERGER SAS.
Main features of the project: Connection of the railway network in the western and central zones of the DRC.
Position: Surveying Engineer.
Activities: Creation of a geodesic survey network and installation of control points.
Year and place: September 2015 to October 2015, Kinshasa, DR Congo.
Customer: Governorate of the city of Kinshasa.
Main features of the project: interconnecting neighborhoods II and III in the commune of Masina.
Position: Surveying Engineer.
Activities: Engineer in charge of topographic studies.
Year and place: May 2015 to Jully 2015, Kinshasa, DR Congo.
Customer: Governorate of the Province of North Kivu.
Main features of the project: Rehabilitation of the primary and secondary road network in North Kivu Province.
Position: Surveying Engineer.
Activities: Engineer in charge of topographic studies.
Year and place: February 2015 to May 2015, Tshikapa, DR Congo.
Customer: Water Project Execution Unit /REGIDESO.
Main features of the project: Supply of generators to supply the raw water collection and treatment site for Regideso's facilities.
Position: Engineer Site manager.
Activities: Coordination of work and layout of civil structures.
Year and place: June 2014 to September 2014, Kikwit, DR Congo.
Customer: Urban Development Program/Ministry of Urban Planning and Housing.
Main features of the project: Construction of paved secondary roads and a drainage network in the town of Kikwit.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
(KP 7 + 475 to KP 8 + 615) on Liberation's avenue in Kinshasa.
Year and place: March 2014 to June 2014, Kinshasa, DR Congo.
Customer: Infrastructure Unit/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Construction of gutters along Avenue de la Liberation to drain water from
the Sanatorium hill catchment area.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
on Liberation's avenue in Kinshasa.
Year and place: February 2012 to October 2012, Kinshasa, DR Congo.
Customer: Cellule des Infrastructures/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Construction of a collector along Liberation's avenue to collect runoff from the Selembao market
and rehabilitation of the stretch of road between makala prison and the Selembao market.
Position: Site manager engineer.
Activities: charged of planning and drawing up work execution plans.
Year and place: February 2011 to December 2011, Mbandaka, DR Congo.
Customer: DRC government
Main features of the project: Rehabilitation of road infrastructure and drainage network in the city of Mbandaka.
Position: Surveying Engineer.
Activities: Engineer in charge of studies and rebuilding the roadway.
Year and place: February 2009 to January 2011, Kinshasa, DR Congo.
Customer: Cellule des Infrastructures/ Ministry of Infrastructure Public Works and Reconstruction.
Main features of the project: Total reconstruction of Avenue Liberation and erosion control at Kitoki Mosi.
Position: Surveying engineer.
Activities: Engineer in charge of rebuilding the roadway and drainage.
Year and place: September 2009 to June 2010, Kinshasa, DR Congo.
Customer: Roads Office.
Main features of the project: Anti-erosion control of the Kingu site and construction of a hydraulic network to drain water from
the Kingu and Ngomba-Kinkusa neighborhood.
Position: Surveying engineer.
Activities: Engineer in charge of rebuilding the roadway and drainage.