Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Celedonio Rodríguez

Brownfield

Summary

Experienced with managing large-scale construction projects, ensuring quality and adherence to timelines. Uses effective communication to coordinate between various stakeholders and optimize project outcomes. Track record of implementing safety protocols and fostering collaborative team environment.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Super Intendent

K&K Inc.
01.2024 - Current
  • Pay: $50 an hour $125 Per Diem
  • I look over the whole project, make sure it goes all on schedule and at the client’s request. I order and track material. If there are any changes I talk to the engineers and the client so that everyone’s onboard. I also get involved with the RFI’s (any changes that the job requires). I have meetings with the CEO’s and project managers, engineers and PMs. I conduct the safety meetings every morning, safety topic for the day, as well as the construction update twice a week. I also make sure everyone clocks in and out. I make sure everyone does the JSA and signs them. I look over the hours, sign and submit them every week to HR. I conduct meetings with all the foreman’s making sure we have a plan to meet schedule. I also conduct the safety logout, tagout. I make sure everything is up to code before the job is turned in. I sign documents for the turnover. I oversee the walk around with the city and client inspectors. I oversee the equipment rentals, as well as certifying employees to be able to use the equipment. As well as making sure the safety gear is all up to code and that everyone is using the safety gear. I have knowledge of instrumentation, tubing, and installing conduit panels. As well as testing equipment, start-ups. Also, review all job scope and see if I need to do a change orders for any changes what on the jobsite. Fire and gas upgrades.

Electrical Forman

Expense Electrical Co.
01.2023 - 2024
  • Responsibilities: Meg Cables, Run EMT conduit, panels, pull wire, terminate JB box, MCC, and Rio, receptors and panels, work on power, install JB Boxes, I also install and hung lights up. Ran rigid pipe, I installed fittings. I also did terminations on fans, and motors. I also installed and terminated instruments. sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust. T-body stress cones and terminates stress-cones.

Electrical Forman

Expense Electrical Co.
01.2023 - 2023
  • Pay: $45 an Hour $125 Per Diem
  • Responsibilities: Meg Cables, Run EMT conduit, panels, pull wire, terminate JB box, MCC, and Rio, receptors and panels, work on power, install JB Boxes, I also install and hung lights up. Ran rigid pipe, I installed fittings. I also did terminations on fans, and motors. I also installed and terminated instruments. sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust. T-body stress cones and terminates stress-cones. As well as instrument tech work, I checked the instruments on pipes and made sure they were the correct instruments, labels and conducted dry commissioning and loop checks. Stimulate the PT’s (transmitters). As well as document everything. Conducted the wet commissioning process, making sure everything is calibrated correctly.

Electrical Foreman

Energy Erectors Inc
01.2022 - 2022
  • Meg Cables, Run EMT conduit, panels, pull wire, terminate JB box, MCC, and Rio, receptors and panels, work on power, install JB Boxes, I also install and hang lights up. Ran rigid pipe, I installed fittings. I also did terminations on fans, and motors. I also installed and terminated instruments. sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust. Install 2-4-inch pvc conduit inside concrete forms for transformers and circuit breakers. Install concrete cable trench tray.

Electrical Foreman

Blanchette; Ameresco Facility Houston Tx.
01.2021 - 2022
  • I oversaw conduit runners, wire pullers, and terminators. I also delts with electrical engineers from Ameresco. Also, planned, designed, and ordered material for the task that I was in. Also, I worked on the sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust.

Foreman Electrician

Schowb Energy
01.2020 - 2021
  • Industrial work (432)924-1931
  • Install conduit Rigid 3/4"-4", cable tray, pull cable, install grounding, made up stress-cones and terminated 4160KV, terminate all buster six pumps, terminate five 480V motors, terminate control wires for instrumentation, inside PLC, JBoxes, inside the instruments “TE, pressure transmitter indicator, level switches high/low, vibrating switches, HOA switches, RTD’s, TIT’s”, phone cables, and MEG cables

Foreman Electrician

Brown & Root; McCurty Energy LCC
01.2020 - 2020
  • Industrial work (830)210-4391
  • Terminations on 480V motors for the cooler fans and 480V motor pumps, worked on utility poll lines assembling all the parts, made up stress-cones for 15KV power, terminated all high voltage inside the MCC Building, installed conduit (ridged: 3inch. 2inch. ¾), installed lighting, pulled wire and terminated all lighting. Also, I worked on the sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust.

Saulsbury industry
01.2014 - 01.2019
  • Industrial work (432)366-3686
  • Install conduit (PVC, EMT, Rigid, Rigid plastic bond, aluminum), cable tray, worked on duct bank, grounding, worked on lighting and lighting poles, installed power equipment, terminate power cable and instrumentation cable, worked on (24V, 120V, 277V, 480V,4160KV 5000KV, 25000KV), make and install stress-cones, terminations on (PLC's, J-Boxes, Battery station, buster pumps, 480 motors, 480 cooler fans, switch gears, power distribution transformers, VFD's, electrical welding receptacles, regular power outlets, transfer switches, utility transformers, power lines, terminate at high voltage power inside the MCC) install heat trace, install instrumentation equipment. I can read blueprints, PID's for instrumentation, and underground blueprints, phone cables, and MEG cables. Also, I worked on the sub-station, installing and putting together transformers in the substation, installing underground ground for the sub-station before installing the beams, I also did terminations, and stress-cones inside the battery and control room. Discharge circuit breaker, install electrical insulators, install duct dust.

Tracer Construction
01.2009 - 01.2013
  • Industrial work (713)868-5500
  • Install heat trace, conduit (Rigid, aluminum, and cable tray), pulled wire, install power panels/boxes, install per transformers, RTD, install MI cable, terminate high and low voltage and signal cable, phone cables, and MEG cables.

Metro Elect.
01.2007 - 01.2008
  • Commercial work (956)686-2323
  • Install conduit underground. Install conduit inside building E.M.T, PVC, aluminum, rigid work on light poles, lighting, grounding terminate low and high voltage pull wire installation of power equipment. Commercial work: (stores, banks, warehouses, hospitals, schools, clinics, water treatment facilities, military base, police department)
  • Industrial work: (refineries, power plants, natural gas plants, batterie stations, meter skids for the pipeline, compressor stations, Tank farms )

D&F industry
01.2003 - 01.2006
  • Commercial work (956)781-2496
  • Install conduit underground; and above ground E.M.T, PVC, aluminum, rigid. Install power panels, electrical transformers, lights, pole lights, light switches, Power outlets, switch gears, pull wire, termination 120v,277,480v,5kv.

Education

No Degree -

Valley High

Skills

  • Project management
  • Project coordination
  • Relationship building and management
  • Strategic planning
  • Training oversight
  • Quality assurance

Certification

TDLR# 188526

OSHA 10

OSHA 30

Mini excavator

Cesar lift

Man Lift

Fork Lift

Trench

Walk-alone trench

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Super Intendent

K&K Inc.
01.2024 - Current

Electrical Forman

Expense Electrical Co.
01.2023 - 2024

Electrical Forman

Expense Electrical Co.
01.2023 - 2023

Electrical Foreman

Energy Erectors Inc
01.2022 - 2022

Electrical Foreman

Blanchette; Ameresco Facility Houston Tx.
01.2021 - 2022

Foreman Electrician

Schowb Energy
01.2020 - 2021

Foreman Electrician

Brown & Root; McCurty Energy LCC
01.2020 - 2020

Saulsbury industry
01.2014 - 01.2019

Tracer Construction
01.2009 - 01.2013

Metro Elect.
01.2007 - 01.2008

D&F industry
01.2003 - 01.2006

No Degree -

Valley High