Thorough Instrument Fitter commended as hardworking, professional and collaborative individual with outstanding [tube bending] and [instrument installation] specialties. Dedicated to increasing company's production and safety. Hardworking and competent individual with over [4 years of experience in manufacturing [refinery and shop units.
1/4 to 3/4 tube bending and installation from instrument to valves
Creation and installation of tube tray on skidz
Instrument installation on skidz
Fabricate junction boxes for field wiring connections between instruments and controllers
run of single and multiple lines of tube
connect tube from instruments as pressure and level transmitters to valves pipes
installation of different types of instruments by creating it stands
tube tray installation with it supports
Measured, marked and indicated dimensions and reference points on materials
assembly and installation of air manifolds ruled and followed by drawings
Operated hand tools, drill presses, riveting machines and tap burners to safely produce projects
Read and followed blueprints, diagrams and drawings to fabricate products
Install and maintain process control systems including pneumatic, hydraulic, mechanical and electrical components
Tested experimental models under simulated operating conditions to determine standardization and feasibility of design
Conduct loop checks to ensure that all installed instruments are working properly
Installation of transmitters for temperature, pressure, flow and level measurements
Installation of 1/4 to 3/4 tube
Assemble valves, regulators and related components according to manufacturer's specifications
Creation and installation of stands and different type of supports for cable and tube tray followed and ruled by drawings and prints
Inspected work areas for safety hazards before beginning any installation activities
Install, test and calibrate instrumentation systems to meet customers specifications and requirements
Installation of long and short runs of different tube measures
Installation of instruments and valves
Creation of stands and supports for tray and instruments
follow P&ids directions and draws for installations
Inspected instruments for proper functioning and accuracy according to established safety standards
Installation of instruments
Pressure test on valves and previous installed tubes for leaks
Fabrication and installation of tray for short and long runs
Creation, manufacture and installation of different types of supports
Air pressure test on tubes from analyzers
Disassembled defective instruments and replaced worn or damaged parts with new ones
Install Rtds
Start up on heat trace panels
Pulling tube bundle
Manufacture and installation of supports
Installation of different type of instruments
Install heat tracing
Remove old equipment and install new one
Run 1/4 to 3/4 tube
Bend and installation of different measures of stainless steel tube
Modify existing software systems to enhance performance and add new features
tube and electrical tray installation and fabrication
installation of pressure valves