Dedicated Pile Driver Operator with expertise in optimizing project efficiency and ensuring construction safety. Proven ability to adapt quickly to changing site conditions while maintaining high-quality standards and satisfactory production rates.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Pile Driver Operator
LPL Solar
Lakeland, FL
02.2026 - 05.2026
Operated pile driving equipment like the Vermeer PD-10 paired with StoneX to install quality solar foundations.
Developed skills as a solo operator without the need of the helper to meet the required production.
Ensured compliance with safety protocols during all installation activities.
Assisted in site preparation and layout for pile placement accuracy.
Collaborated with team members to optimize workflow efficiency on job sites.
Adapted quickly to changing site conditions and project requirements. i.e. (The engineer-provided elevations we're wrong and quickly developed skills to eyeball the pile heights for the remainder of the project as requested by upper management.
Mechanical QC
Applied Energy Services
Enfield, NC
10.2025 - 01.2026
Skilled at working independently and collaboratively in a team environment.
Proven ability to learn quickly and adapt to new situations.
Passionate about learning and committed to continual improvement.
Paid attention to detail while completing assignments.
Pile Driver Operator
Blue Ridge Power
Enfield, NC
05.2025 - 10.2025
Assisted in the preparation at the beginning of the project and made sure every requirement was met for the start of Pile Production.
Operated hydraulic pile driving equipment like the Utilicorp GRT and Vermeer PD-10 to install solar foundations.
Developed skills in reading blueprints and interpreting construction specifications.
Supported successful project completion with precise alignment of driven piles, meeting specific requirements.
Enhanced project efficiency by accurately driving piles according to design specifications and guidelines.
Pile Driver Operator
Blue Ridge Power
Castalia, NC
10.2024 - 05.2025
Operated hydraulic pile driving equipment like the Utilicorp GRT and the Vermeer PD-10 paired with Trimble Groundworks GPS system to install solar foundations.
Collaborated effectively with team members for efficient coordination of pile driving operations and overall project progress.
Helped Identify and address foreseen flaws that could become quality issues in the future of the project.
Supported successful project completion with precise alignment of driven piles, meeting structural requirements.
Pile Driver Operator
MasTec Renewables
Spring Run, PA
01.2024 - 10.2024
Operated hydraulic pile driving equipment like the Vermeer PD-10R paired with StoneX GPS System to install solar foundations.
Demonstrated adaptability in adjusting to varying job site conditions, implementing alternative piling methods when necessary.
Maintained quality control standards by conducting thorough inspections of installed piles, identifying any necessary corrections or adjustments.
Assisted in the process of Installing Inverter Piles while ensuring each inverter pad met specified requirements by QC.
Pile Driver Operator
IEA Constructors
DeSoto, GA
02.2023 - 12.2023
Operated hydraulic pile driving equipment like the Vermeer PD-10 paired with Trimble GroundWorks GPS system to install solar foundations.
Maintained clear communication with supervisors regarding project progress and challenges.
Ensured accurate documentation of pile driving activities, aiding in smooth project management processes.
Pile Driver Operator
IEA Constructors
Russellville, KY
06.2023 - 08.2023
Operated hydraulic pile driving equipment like the Vermeer PD-10 paired with StoneX GPS system to install solar foundations.
Met trucks, unloaded piles and moved to job locations to keep projects moving smoothly.
Adapted quickly to changing site conditions like heavy snow and project requirements like long shifts.
Pile Driver Operator
IEA Constructors
South Boston, VA
07.2022 - 06.2023
Operated hydraulic pile driving equipment like the Vermeer PD-10 paired with the StoneX GPS system to install solar foundations for the Inverter Pads.
Conducted routine maintenance checks on pile driving machinery and tools.
Adapted quickly to changing site conditions and project requirements.
Pile Driver Operator
IEA Constructors
Bluffton, GA
05.2022 - 07.2022
Started Operating Pile Driving equipment like The Vermeer PD-10 and quickly began implementing techniques to help improve in safety, quality and, production.
Improved communication between crew mates on daily work progress, challenges encountered, and potential solutions.
Increased safety on job sites by strictly adhering to company safety protocols and regulations during pile driving operations.
Improved quickly and instantly began turning in satisfactory production numbers.
Pile Driver Helper
Overland Contracting
Jacksonville, FL
11.2021 - 04.2022
Assisted operators in strapping up piles for production.
Maintained cleanliness throughout the work area.
Always maintained good communication with the operators and other crews working nearby.
Collaborated with team members to optimize production rates.
Light Equipment Operator
Wharton Smith
Tampa, FL
01.2021 - 11.2021
Operated light equipment to support construction projects and ensure timely completion.
Conducted routine maintenance checks on machinery to optimize performance and safety standards.
Collaborated with team members to coordinate equipment usage across multiple job areas.
Maintained accurate records of equipment usage and maintenance schedules for reporting purposes.
Solar Panel Installer
Overland Contracting
Ruskin, FL
10.2019 - 01.2021
Installed solar panel systems on large utility-scale solar plants, ensuring compliance with quality and safety standards.
Trained new installers on techniques, safety protocols, and equipment usage to enhance team performance.
Oversaw inventory management of tools and materials, reducing downtime during installation projects.
Assembled, wired and connected solar panels to existing components and systems.
Education
High School Diploma -
George W. Jenkins Senior HIgh School
Lakeland, FL
05-2019
Skills
Experience with multiple ways of pile driving like using only Pin and string or operating with GPS systems
Quickly adapting to obstacles and finding ways of overcoming them
Experienced with Multiple light equipment like mini Excavator and skid steers
Experience in Pile QC to ensure every pile meets the required specifications
Construction safety especially with other crews nearby
Accomplishments
Completed Pile Driving in over 5 sites from start to finish.
Participated in the completion of a recognized site for meeting completion time in the span of 2 months.
Maintained safe work ethic throughout jobsites by submitting near misses and good catches to help bring awareness of on-going issues to fellow co-workers on every environment in different jobsites.