Summary
Overview
Work History
Education
Skills
Timeline
Generic

Chad Heinsohn

8084 Nightinggale Rd, Weeki Wachee,FL

Summary

Experienced group manager with extensive mechanical knowledge and expertise in leading teams and contractors effectively. With over 28 years of experience, dedicated to enhancing team productivity and the quality of work performed by mechanical service professionals. Skilled team leader with strong problem-solving and conflict resolution abilities, specializing in training, mentoring, coaching, and supervising staff. Ensures equipment systems and components are maintained and operating at peak performance levels. Seasoned mechanical superintendent with a proven safety record, performance-driven approach, and a successful track record in industrial construction. Proficient in training and mentoring team members to optimize performance and enhance quality, while also adept at resolving issues diplomatically and reliably.

Overview

28
28
years of professional experience

Work History

Millcreek 5 power project/Kiewit
01.2025 - 01.2026
  • Install Bop equipment
  • Erect steam condenser
  • Install LP turbine
  • Erect inlet duct /filter house
  • Crosby rigger and lift director

Mechanical BOP superintendent

Shady hill power project Kiewit
01.2023 - 01.2024
  • Installed steam condenser
  • Set generator and gas turbine
  • Erect inlet duct/filter house
  • Install Bop equipment
  • Mechanical Superintendent – Facilities
  • Kinder Morgan Projects
  • Edge Water Compressor Station
  • Installed 1210 compressor, slug catcher, all Piping and BOP equipment
  • Tioga Compressor Station
  • Installed 2 800 horsepower can pumps, all piping, valves, headers, control valves for dapple
  • Fire Bird Compressor Station
  • Installed and assembled interflex compressor with all pipeline and valves
  • Kinder Morgan – Rivers Edge Compressor Station
  • Complete Compressor Station Re-build. Installed and removed used compressors, Installed JT Skid, Demolition out old scrubber, updated lube oil and glycol tanks
  • Red Bank Compressor Station
  • Installed axip compressor, new slug catchers and all pipeline and valves
  • Hebron Compressor Station
  • Erected new compressor building, Installed axip compressor, bypassed scrubber and installed JT skid
  • MPLX
  • Connely Station
  • Installed 2 mainline booster pumps along with 1600 feet of 8-inch pipeline and launcher and receivers

Mechanical Superintendent

The Industrial Company, TIC, Bakersfield, CA
Bakersfield, CA
01.1998 - 01.2018
  • Supervised the maintenance of equipment through predictive and preventative measures
  • Established and maintained positive relationships with regulatory professionals
  • Provided training, motivation, and guidance to employees to ensure adherence to safety protocols
  • Developed and implemented quality control standards, evaluated regulatory compliance, and optimized mechanical service plans
  • Organized and managed workforce schedules for efficient utilization of staff
  • Prepared and organized work sites to facilitate smooth job operations
  • Trained and supervised employees to enhance daily tasks and performance
  • Created work crew schedules and assigned tasks accordingly
  • Managed material and labor resources to ensure projects were completed on time and within budget
  • Reviewed project blueprints and specifications to determine necessary workforce for job completion

Education

High School Diploma -

NCCER - undefined

Millwright Boilermaker Rigger, Steamboat Springs CO
Steamboat Springs, CO
01-2014

GED - undefined

College of the Redwoods
Eureka, CA
01-1994

Skills

  • Machinery Testing
  • Corrective Action Implementation
  • Scheduled Maintenance
  • Employee Mentoring
  • Equipment Commissioning
  • Safety Compliance and Training
  • Performance Evaluations
  • Production Schedule Maintenance
  • Visual Inspections
  • Estimating and Takeoffs
  • Accident and Injury Investigation
  • Issue Assessments
  • Team Building
  • Quality Assurance Standards
  • Project Close Outs
  • As-builts
  • Tool and Equipment Allocation Plans
  • Reporting and Communication
  • Crosby rigger
  • Lift director

Timeline

Millcreek 5 power project/Kiewit
01.2025 - 01.2026

Mechanical BOP superintendent

Shady hill power project Kiewit
01.2023 - 01.2024

Mechanical Superintendent

The Industrial Company, TIC, Bakersfield, CA
01.1998 - 01.2018

NCCER - undefined

Millwright Boilermaker Rigger, Steamboat Springs CO

GED - undefined

College of the Redwoods

High School Diploma -

Chad Heinsohn