Summary
Overview
Work History
Education
Skills
Timeline
Generic

Chad Leonhardt

mi wuk village,CA

Summary

Seasoned construction professional well-versed in drywall taping and finishing techniques. Proven track record of delivering quality work on time, enhancing overall appearance and durability of structures. Known for strong teamwork and adaptability, consistently meeting changing project demands and ensuring client satisfaction.

Overview

27
27
years of professional experience

Work History

Taper

Js Drywall
04.2024 - 10.2024
  • Assisted in preparing surfaces for painting by taping off areas to ensure clean lines.
  • Learned proper safety protocols and equipment usage to maintain a secure work environment.
  • Supported experienced team members in applying various types of tape for different surface finishes.
  • Maintained tools and equipment, ensuring they were clean and ready for use at all times.
  • Adapted quickly to new tasks while collaborating with team members on job site requirements.

Maintenance Crew Member

Dodge Ridge Ski Resort
Pinecrest, CA
03.2024 - 09.2024
  • Assisted in routine maintenance tasks, ensuring equipment remained in optimal condition.
  • Supported team members by learning and utilizing various tools and safety protocols effectively.
  • Conducted regular inspections to identify and report potential issues for timely resolution.
  • Maintained cleanliness and organization of work areas, fostering a safe environment.

Production Lead Manager

Guy of All Trades
Stockton, CA
02.2019 - 10.2023
  • Managed daily production schedules to ensure timely workflow and meet project deadlines.
  • Supervised team members to maintain safety standards and operational efficiency on the production floor.
  • Coordinated equipment maintenance and troubleshooting to minimize downtime and enhance productivity.
  • Trained new staff on production processes, tools, and safety protocols for optimal performance.
  • Monitored inventory levels and assisted in ordering materials to prevent shortages during production runs.
  • Increased product quality by establishing stricter quality control measures and employee training programs.

Installed New Flooring

Jw Flooring
Pittsburg, CA
05.2010 - 11.2019
  • Installed systems and equipment according to specifications and safety protocols.
  • Collaborated with team members to streamline installation processes and improve efficiency.
  • Trained junior installers on best practices and safety measures in the field.
  • Conducted regular maintenance checks to ensure optimal performance of installed systems.
  • Developed installation schedules to enhance project timelines and resource allocation.
  • Installed complete systems at new residential and business construction sites.
  • Operated tools, equipment, and machinery according to safety standards.
  • Implemented quality control measures during installations, ensuring that each project met or exceeded client expectations and regulatory standards.

Floor Installer and Sander

3rd Generation Floors
Pleasanton, CA
06.1997 - 03.2009
  • Installed various flooring materials, ensuring high-quality finishes and adherence to manufacturer specifications.
  • Collaborated with team members to optimize installation processes and improve overall workflow efficiency.
  • Trained and mentored junior installers on best practices and safety protocols in flooring installation.
  • Conducted site assessments to determine material needs, layout designs, and project timelines for installations.
  • Utilized advanced tools and equipment for precise measurements, cuts, and placements of flooring materials.
  • Implemented quality control measures to identify defects and ensure compliance with industry standards.
  • Enhanced customer satisfaction by providing efficient and precise floor installation services.
  • Performed preventive maintenance on already fitted tiles to guarantee longevity.

Education

High School Diploma -

Liberty
Brentwood, CA
06-1989

Skills

  • Adaptable techniques
  • Measuring and cutting
  • Drywall preparation
  • Tool maintenance
  • Hand troweling
  • Joint compound application
  • Drywall repair
  • Sanding techniques
  • Surface preparation
  • Job site preparation
  • Drywall installation
  • Stamina and endurance
  • Project estimation
  • Decorative finishes
  • Mixing compounds
  • Physical activity
  • Corner taping
  • Tool inspection
  • Texture matching
  • Routine tool maintenance
  • OSHA safety procedures
  • Drywall mixing
  • Safety procedure compliance
  • Problem-solving
  • Attention to detail
  • Time management
  • Power tool operation
  • Team collaboration
  • Active listening

Timeline

Taper

Js Drywall
04.2024 - 10.2024

Maintenance Crew Member

Dodge Ridge Ski Resort
03.2024 - 09.2024

Production Lead Manager

Guy of All Trades
02.2019 - 10.2023

Installed New Flooring

Jw Flooring
05.2010 - 11.2019

Floor Installer and Sander

3rd Generation Floors
06.1997 - 03.2009

High School Diploma -

Liberty
Chad Leonhardt