Summary
Overview
Work History
Education
Skills
Timeline
Generic

Chance Terpening

Austin,TX

Summary

Proven Construction Laborer with a track record of enhancing project efficiency and client satisfaction at Local 17. Significantly contributing to the successful execution of large-scale infrastructure projects. Excelled in fast-paced environments, mastering drywall installation and renovation projects while maintaining a clean and organized construction site.

Overview

8
8
years of professional experience

Work History

Construction Laborer

Local 17
10.2019 - 06.2024
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Enhanced client satisfaction by maintaining a clean and organized work environment throughout the construction process.
  • Assembled and disassembled scaffolding and ladders to guarantee safety of workers while performing tasks at heights.
  • Ensured accurate measurements by using industry-standard tools for leveling, alignment, and measurement purposes.
  • Dug trenches and set up forms to specified requirements for concrete pours.
  • Supported the successful execution of large-scale projects by adopting a flexible work schedule and willingly taking on additional responsibilities when needed.
  • Increased project efficiency by effectively organizing and managing construction materials on job sites.
  • Assisted in constructing roads, bridges and other infrastructure projects to respond to economic, fiscal and environmental changes.
  • Assisted in digging, trenching and backfilling trenches and foundations.

TNT Drywall

Lance Terpening
05.2016 - 09.2019
  • Minimized downtime with proficient use of hand tools, power tools, and specialized equipment for fastening drywall panels securely in place.
  • Improved project efficiency by accurately measuring, cutting, and fitting drywall panels to specific dimensions.
  • Increased workplace safety by maintaining clean and organized work areas during the drywall installation process.
  • Glued, nailed or screwed wallboard panels to wood or metal framework to promote smoother, cleaner and faster hanging and finishing jobs.
  • Delivered precise cuts around electrical outlets and plumbing fixtures using appropriate tools such as keyhole saws or routers.
  • Measured and marked cutting lines on drywall for lengths, heights and penetrations.
  • Prepared work area, tools and equipment for job site.
  • Completed installation of drywall sheets on commercial and residential properties.
  • Removed and replaced damaged drywall to complete repair and restoration projects.

Education

High School Diploma -

Marlboro High School
Marlboro, NY
05.2016

Skills

  • Team-oriented and dependable
  • Worksite safety
  • Basic Carpentry
  • Power Tool Operation
  • Concrete finishing
  • Ditch digging
  • Formwork construction
  • OSHA Regulations
  • Skilled with ladders and scaffolds
  • Flooring Installation
  • Roof Installation
  • Drywall Installation
  • Demolition Procedures
  • Framing Techniques

Timeline

Construction Laborer

Local 17
10.2019 - 06.2024

TNT Drywall

Lance Terpening
05.2016 - 09.2019

High School Diploma -

Marlboro High School
Chance Terpening