Detail-oriented team player and leader with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy, while being mindful of downstream safety and environmental impacts
Overview
7
7
years of professional experience
Work History
Senior Cost Engineer
Nevada Gold Mines
02.2022 - Current
Worked with Operations, Maintenance, Engineering, and Finance teams to produce quarterly and LOM cost forecasts for operations and maintenance activities based on production physicals and planned maintenance.
Improved cost/ton forecast variance by 26%.
Prepared and presented AFE documentation/justification for capital equipment purchases and capital projects.
Completed Project Justification for $4 Million Aggregate Borehole Liner purchase to reduce liner replacements and improve throughput through reduced planned maintenance.
Projected savings of $2.30/ton on aggregate savings and total cost per ton savings of $1.00/ton.
Prepared and presented quarterly review and cost forecast presentations to Senior Leadership.
Tracked monthly and quarterly spends and provide variance explanations to Senior Leadership.
Supervised multiple junior engineers and mentored into roles to complete tasks as a Cost Engineering Team.
Worked with Mobile Maintenance Team to build an automated report to identify top contributing factors for equipment downtime.
Project Shift Coordinator
Nevada Gold Mines
08.2020 - 02.2022
Conducted Geotechnical tests to determine required ground support.
Worked with Contractor to determine the best methods to execute engineered plans.
Ensured all contractors were working safely and following Turquoise Ridge policies.
Coordinated between efforts between Contractor and Company employees to meet production targets for 3rd Shaft Project and TRUG.
Completed weekly, monthly, and quarterly progress reports.
Gained experience in incident management including time-sensitive reports and incident investigation.
Engineer II
Nevada Gold Mines (Formerly Barrick Nevada)
12.2018 - 08.2020
Produced weekly and monthly mine plans, using Deswik.Sched, to meet quarterly production forecasts.
Built quarterly production forecasts within 2-year planning window to meet LOM production profiles.
Built relationships with Operations, Maintenance, and Technical Services groups to design Drift and Fill production levels, bench stopes, and primary development ramps to optimize production.
Worked with Jumbo Operators to design face profiles using different burdens and spacings, and upload to jumbo drills using OEM programming.
Provided timing maps to powder crews for bench shots.
Mine Foreman
Hecla Nevada (Formerly Klondex Mines)
08.2018 - 12.2018
Front line supervisor for crews of up to 3 employees and 4 contractors, ensured that safety and production targets were achieved.
Ensured all company employees and contractors are working safely and following Midas' SOP's.
Worked with miners to find the best method to execute engineering plans.
Performed weekly inspections of all open areas.
Junior Mine Engineer
Klondex Mines
08.2017 - 08.2018
Surveyed asbuilts of working headings, and updated rib, back, and vein details in Vulcan.
Provided line and grade for ore and waste development headings.
Plotted cut sheets showing updated surveyed asbuilts and planned development.
Provided the Chief Engineer and General Foremen contract footages at the end of pay periods.
Performed CMS scans of longhole stopes and surface stockpiles.
Digitized survey asbuilts (polylines and laser scans) in cad software.
Designed longhole stopes using different burdens and spacings based on vein dimensions.
Produced weekly and monthly production plans that meet monthly and quarterly production forecasts.
Built relationships with operations staff to find solutions to meet the weekly production plans.