while working for FDS concrete i wasn't just a finisher we only had two people me and the bosses daughter so i did everything from laboring hauling all the heavy stuff and doing all the bull work. to measuring and cutting forms, accurately for set up using carpenters square,tape measure. as well as using levels and string lines and lazer levels and various other measuring devices to accurately set up and calculate the pour. the different tools i would use consisted of mag, trowel, edger, string line, level, tape measure, regular long neck heavy head hammer, then a snap-on deadblow hammer, knee pads, muckboots, kneel boards, handheld grinder, 18in blade industrial stil demo saw, penny nails, grease gun, utility knife, and countless hand tools i would also have to calculate, cut and tie all re-enforcement rebar going into the slab. as well as the first step of digging the old concrete/material out with different pry bars and shovels, skid steers, jack hammer,and demo saw, then i would use the skid steer to make the whole plot level, rakes and come-alongs as well to fine-tune the whole plot level checking for consistency and making sure its all even. then setting up your forms using a lazer level and string line to check height as well as a bubble level to calculate and run the water away from the building. then after the material is down i would take a compactor and go over the whole surface sometimes even twice, and on a really hot day water the grade so it sets up slower and the grade doesn't suck all the moisture out right away. then go in your reinforcements which i measure, cut with deo saw, the evenly lay into place, and tie. after the mixer truck shows up, getting him unloaded and the concrete down efficiently in a timely manner is key. and as the truck it there unloading. i am working right beside the chute communicating with the driver operating slinging mud where it needs to go with shovels and come-alongs quickly scanning and analyzing were it is high and low filling gaps and making it level. and as soon as all the mud is down i get all necessary tools washed up and get the driver washed up and out of her so he can keep moving. after that i would also use a bull float and get the whole slab relatively flat. then wait for it to set up for a little bit as well as getting on boards finishing the slab after it hardens up and using more fine tuning concrete finishing tools such as mags,trowels,and edgers to complete the project i would also the day after make open blade saw cuts with that same stil demo saw to prevent cracking. if no joints were put in. also using industrial hammer drills to go into the side of foundation and buildings to connect slabs or structures. and scrubbing and washing all the tools as well before the truck leaves. and the day after cleaning up, making saw cuts, stripping boards, scrapping boards, pins, forms, loading and unloading the work truck from jobsite to jobsite in a timely and efficient manner.
- Applied finishing techniques to improve surface quality and aesthetics of concrete installations.
- Operated tools such as trowels and floats to finish concrete surfaces with precision.
- mixing concrete to ensure proper consistency and quality for various projects.
- Followed safety protocols to maintain a secure work environment while handling materials.
- Collaborated with team members to complete tasks efficiently and meet project deadlines.
- Adapted quickly to different project requirements, demonstrating flexibility in task execution.
- Shoveled materials such as dirt, gravel, and asphalt.
- operating equipment such as mini excavator and skid steer to moving material
- Demonstrated proficiency in operating power tools and equipment on job sites.
- Focused on precision and attention to detail in all aspects of concrete finishing.