Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

CHAVAR TUIMAUGA

Lakewood,CA

Summary

Presently pursuing an opportunity with an established organization to exercise my Mechanical skills with the potential for advancement in the Refining Industry.

Knowledgeable Boilermaker/Fitter with extensive experience in overseeing boilermaking projects, ensuring safety and efficiency in all operations. Successfully led teams in maintenance and installation of all mechanical equipment, demonstrating leadership and problem-solving abilities. Proven track record of managing complex tasks and fostering collaborative work environment.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Fitter/Turnaround Coordinator

Phillips 66
Wilmington , CA
12.2018 - Current
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Increased workplace safety by adhering to strict guidelines and protocols during daily operations.
  • Receive daily work orders, scan, and log in for time accountability.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.
  • Isolating heat exchangers, fin fans, pumps, towers, vessels, reactors, and heaters by use of slip or spec blinds.
  • Complete Disassembly/Assembly of heat exchanger bundle and components using hand, electric, pneumatic, and hydraulic tools. Rigging on heavier equipment with crane assist, forklift assist to remove out of service for repairs.
  • Bull rigging piping and spools into pipe racks and congested areas by use of chainfalls, come alongs, and rigging straps.
  • Complete Disassembly/Assembly of tower trays for replacement and repairs for cleaning and inspection.
  • Removal of fin fan plugs for cleaning and inspection. Install after cleaning and inspections are complete.
  • Hydrotest heat exchangers, piping, fin fans, and vessels for leak detection at recommended test pressures.
  • Removal of reactor elbows with crane assist for catalyst skims or changes.
  • Removal of Heater burners for steam cleaning and unplugging. Install after inspections.
  • Hand and Hydraulic Torque on all equipment specified by MI department at recommended torque specifications.
  • Filer replacements in filter pots.
  • Layout and install RTI header piping, manifolds, and hoses in preparation for planned shut down events.
  • Threaded pipes using piping machines.
  • Demonstrated adaptability by quickly adjusting techniques or strategies based on changing project requirements or specifications.
  • Trained and developed new hires to drive efficient performance by teaching and emphasizing key skills, procedures and performance optimization strategies from day one.
  • Coordinate Turnarounds on piping, heat exchangers, towers, vessels, valves, heaters, and miscellaneous projects in all units.
  • Collaborated with cross-functional teams to ensure smooth execution of turnaround projects.
  • Managing and working along side with contractors designated to my work scopes.
  • Assuring tasks are performed in a safe and timely manner.
  • Engage in update meetings with management to review schedule and safety concerns for that day.
  • Developed detailed schedules for effective manpower utilization during turnaround events.
  • Assisted in the procurement process for necessary materials, tools, equipment rentals, and contractor services needed during turnarounds.
  • Update data and records of daily tasks performed on turnarounds onto IPS program and emails to turnaround team.
  • Perform turnover walk throughs with counter partner to ensure work scope is on schedule and meeting deadlines.
  • Delegate daily work tasks to contracted supervision for work needed to be done each day.
  • Provided expertise on industry standards and regulatory requirements, ensuring compliance throughout the turnaround process.
  • Execute hydrotesting sign offs for leak detection. Closure form sign offs for complete inspections.
  • Improved safety performance with thorough risk assessments and adherence to safety protocols during turnarounds.
  • Implemented best practices in turnaround management, leading to continuous improvement in overall performance metrics.

Boilermaker Foreman/ Mechanic/ Fitter/ Rigger

Brinderson
Carson, CA
05.2015 - 09.2024

Projects: Conoco Phillips Carson/Wilmington, CA -All Units

Exxon Mobil Torrance, CA - All Units, Shell Oil Anacortes, WA - Coker/ Crude Units

  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.
  • Reviewed blueprints and technical specifications to ensure accurate execution of project requirements.
  • Isolating heat exchangers, towers, vessels, and fin fan banks by installing slip blinds in prep for L.O.T.O.
  • Complete disassembly of heat exchanger components and bundle with rigging and crane assist. Removal for repairs.
  • Installation of heat exchanger bundle and components with rigging and crane assist with proper hardware and gaskets.
  • Removal and replacement of valves (All Types), complex spools, fin fan plugs, filters, and piping.
  • Hydraulic and hand Torque equipment to recommended torque specs.
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients.
  • Coordinated with other trades during multi-disciplinary projects for smooth workflow integration across different crafts in field.

Boilermaker Foreman/ Rigger

BHI Energy
09.2017 - 01.2018

Projects: Chevron -El Segundo, CA - Coker/Alky/SRU Units

  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.
  • Delegating personnel to assigned scope of work per project.
  • Coordinated with other trades during multi-disciplinary projects for smooth workflow integration across different crafts in work field.
  • Isolating vessels, drums, heat exchangers and columns by installing slip blinds & blind flanges for L.O.T.O.
  • Complete disassembly of heat exchangers, piping, and control valves, rig up and remove with crane assist for repairs.
  • Complete install of new control valves, piping, and heat exchangers with new hardware and gaskets.
  • Hydrotesting to recommended test pressures performed on equipment for leak detection.
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients.
  • Conducted regular performance evaluations for team members, providing constructive feedback for professional growth.

Boilermaker Mechanic Foreman/ Rigger

Ohmstede Industrial Services
01.2012 - 05.2014

Projects: Exxon Mobil-Goleta, CA- Crude Unit/ Exxon Mobil- Torrance, CA- Coker/ SRU/ PTR/FCC Units/ Air Liquide El Segundo, CA / Longview, TX- Nitrogen, Hydrogen Plant/ Praxair Hawkins,TX - Gas Plant/ Frito-Lay Bakersfield,CA

  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.
  • Delegating personnel to assigned scope of work per project.
  • Coordinated with other trades during multi-disciplinary projects for smooth workflow integration across different crafts in work field.
  • Isolating heat exchanger equipment by installing slip blinds.
  • Complete disassembly as required for repairs
  • Rigging up on heat exchanger components and bundles preparing for crane lifts & removing from service
  • Assemble heat exchanger components with new bolts & gaskets for torque to proper torque pressures, as recommended by the client.
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients.
  • Conducted regular performance evaluations for team members, providing constructive feedback for professional growth.

Boilermaker Foreman/ Fitter/ Rigger

Total Western Inc
11.2010 - 09.2017

Projects: Air Products turn around & special projects- Carson, Wilmington, Martinez, CA

  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.
  • Delegating personnel in a variety of assignments on reformer projects.
  • Coordinated with other trades during multi-disciplinary projects for smooth workflow integration across different crafts in work field.
  • Isolating reformer by installing slip blinds for entry.
  • Using chain falls, come alongs, & nylon straps for heavy burners component removal for access to burner tile replacement..
  • Using chain falls, come alongs, & nylon straps for heavy burners component removal
  • Installation of reformer burners with new bolts & gaskets.
  • Hand torque to proper torque pressures recommended by the client
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients
  • Conducted regular performance evaluations for team members, providing constructive feedback for professional growth

Beta Off-Shore/ Long Beach, CA

  • Removal & replacement of valves (all types) complex spools & piping.
  • Vessel & boiler repairs prep for hotwork.
  • Demolition of drain line piping, cutting pipe & rigging out with crane assistance.
  • Rigging in new drain line piping & setting in designated place setting.
  • Grinding, cutting, & beveling pipe for new welds.
  • Installing butterfly valves & blind flanges.
  • Maintenance on rig and platform.
  • Delegating personnel for replacing old grating with fiberglass grating.
  • Remove rotted out drain pans and prep for hotwork.
  • Install new drain pans and fit for welding.

Tesla Fremont, CA

  • Assisted in design and fabrication of custom cable trays, meeting specific project requirements and timelines.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Install cable trays, dividers, diamond plate covers according to prints provided by Tesla in each cell in prep for electrical wiring.

Boilermaker Mechanic/ Rigger

Plant Performance Services P2S
05.2008 - 08.2013

Projects: Chevron Refinery-El Segundo, CA- Maintenance-All Units/ Conoco Phillips Carson, CA - Coker/Crude Unit

  • Isolating vessels, drums, heat exchangers and columns by installing slip blinds & blind flanges for L.O.T.O.
  • Complete disassembly of heat exchangers, piping, and control valves, rig up and remove with crane assist for repairs.
  • Complete install of new control valves, piping, and heat exchangers with new hardware and gaskets.
  • Hydrotesting to recommended test pressures performed on equipment for leak detection.
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients.
  • Grinding & cutting for demolition.
  • Opening man ways for inspections.
  • Filter replacement.
  • Complex spools, piping, removal & replacement

Boilermaker Mechanic/Rigger

Recon Construction & Engineering
05.2010 - 04.2012

Projects: Exxon Mobil-Torrance, CA- FCC/ Coker/ SRU Unit 25 & 29

  • Isolating reactors, boilers & heaters by installing slip blinds for entry in prep for L.O.T.O
  • Opening of man ways for ventilation & entry access
  • Removal & replacement of valves (all types), complex spools & piping
  • Rigging up on heavier equipment with crane assistance
  • Complete installation of all equipment worked on with new bolts & gaskets
  • Hand bolt torque to proper torque pressures recommended by the client
  • QA/QC tasks performed on project

Boilermaker Mechanic/ Rigger

JV Industrial Companies
Rancho Dominguez, CA
09.2007 - 08.2016
  • Company Overview: Projects: Chevron- El Segundo, CA/ Richmond, CA- Coker/ FCC/Crude Unit
  • Screw pipe fabrication, cut, thread & install to steam out equipment for cleaning.
  • Isolating equipment by installing slip blinds, blind flanges, & figure eight blinds.
  • Complete Disassembly and Assembly of heat exchanger bundle and components with rigging and crane assist.
  • Removal & replacement of valves (all types), complex spools, & piping.
  • Rigging up on heavier equipment with crane assistance.
  • Complete installation of equipment worked on with new hardware & gaskets.
  • Hydrotest exchangers and piping for leak detection at recommended test pressures.
  • Hand & hydraulic torque at recommended torque pressures set by clients.
  • QA/ QC tasks performed on project.

Education

High School Diploma -

Compton High School
Compton, CA
06.2005

Skills

  • Self-Driven
  • Hands on Trainer
  • Strong Oral and Written Communication Skills
  • Great Trouble Shooter
  • Ability to Lead
  • 100% Safe Work Practices
  • Accomplishing Goals in a Timely Manner
  • Very Productive
  • Punctual
  • Pipe fitting
  • Mechanical troubleshooting and diagnostics
  • Hand and power tools
  • Metal cutting
  • Repair work
  • Material prepping
  • Rigging
  • Pipe cutting
  • Pipe fabrication
  • Cutting and threading
  • Installation and inspection
  • Leak detection
  • Demolition and dismantling
  • Installation procedures
  • Leadership skills
  • Multitasking
  • Multitasking Abilities
  • Problem-solving abilities
  • Reliability
  • Team building
  • Safety standards
  • Risk Assessment
  • Operational Efficiency
  • Troubleshooting skills
  • Professionalism
  • Quality Control
  • Strategic Planning
  • Maintenance Scheduling
  • Staff Supervision
  • Workflow Management
  • Preventive Maintenance
  • Time management abilities
  • Inventory Management
  • Adaptability
  • Equipment Maintenance
  • Production Management
  • Performance Evaluation
  • Policy Implementation
  • Problem-solving aptitude
  • Performance Management
  • Scheduling proficiency
  • Project Coordination
  • Vendor Relations
  • Mechanical Aptitude
  • Train workers
  • Training & Development
  • Coordinate work
  • Job site management

Certification

Boilermaker NCCER 2013 JUNE

Timeline

Fitter/Turnaround Coordinator

Phillips 66
12.2018 - Current

Boilermaker Foreman/ Rigger

BHI Energy
09.2017 - 01.2018

Boilermaker Foreman/ Mechanic/ Fitter/ Rigger

Brinderson
05.2015 - 09.2024

Boilermaker Mechanic Foreman/ Rigger

Ohmstede Industrial Services
01.2012 - 05.2014

Boilermaker Foreman/ Fitter/ Rigger

Total Western Inc
11.2010 - 09.2017

Boilermaker Mechanic/Rigger

Recon Construction & Engineering
05.2010 - 04.2012

Boilermaker Mechanic/ Rigger

Plant Performance Services P2S
05.2008 - 08.2013

Boilermaker Mechanic/ Rigger

JV Industrial Companies
09.2007 - 08.2016

High School Diploma -

Compton High School
CHAVAR TUIMAUGA